• Title/Summary/Keyword: 원가정보

Search Result 381, Processing Time 0.027 seconds

Earned Value Management Systems Using 4D-CAD (4D CAD 활용을 통한 공정-원가 통합 시스템)

  • Park Ji-Ho;Jung Young-Soo;Kim Sung-Mo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.504-508
    • /
    • 2003
  • Cost and schedule are the major concerns for the successful construction project management. The four dimensional CAD (4D CAD) integrating graphical data and scheduling data has also been an area of research interests for improving construction controls. In order to achieve the benefits from these areas in an integrated way, this study proposes a 4D-EVMS system for the owners. Managerial requirements for cost and schedule control for the owners are identified first. A 4D-EVMS model is then proposed which provides functional flexibility in order to enhance the efficiency of the system. Lessons learned and practical implications are briefly summarize.

  • PDF

A Study of Improvements in the Standards of Cost Estimate for the New Excellent Technology in Construction (건설 신기술의 원가산정기준 개선방안에 대한 연구)

  • Lee, Ju-hyun;Tae, Yong-Ho;Baek, Seung-Ho;Kim, Kyoungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.65-76
    • /
    • 2022
  • The New Excellent Technology (NET) designation system, introduced in 1989 for the purpose of promoting the development of domestic construction technology and enhancing national competitiveness, reviews the statement of construction cost of new technologies. And the cost reduction effect such as design, construction, and maintenance cost and the effect of reducing the construction duration are evaluated as an evaluation criteria of economic feasibility. However, in this evaluation process, differences of opinion between the institution of construction cost estimating standard management and the new technology developer about unique technologies frequently occur. In addition it is difficult to objectively compare the construction duration with existing similar technologies because there is no information on productivity as the current cost estimating standards for new technologies only present the required amount per unit quantity. In this study, the current state of cost estimating criteria review procedure, evaluation criteria, and cost estimating standards establishment method were analyzed when screening for the designation of a new construction technologies, and compared with overseas cost estimating standards, measures to improve the cost estimating standards of current construction new technologies were suggested. Through the improved cost estimating standards of this study, it is expected that cost information on new technologies will be provided to clients in more detail than the current ones, and the availability and applicability of new construction technologies would be improved by simplifying the construction cost calculation process more.

An Improved Cost Management Method for ERP System (ERP시스템의 원가 운영 개선 방안)

  • Ahn, Min-Sub;Park, Dong-Gyu
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.14 no.4
    • /
    • pp.795-802
    • /
    • 2010
  • Currently, the business environment has been rapidly changed due to the fast globalization and development of information technology. Therefore, many companies are trying to change their management system by improving their own decision making systems and innovations. Many domestic enterprises are introducing or considering the ERP system. In the field of ERP management accounting, there are many auxiliary functions for helping efficient internal management analysis for company. In this paper, we proposed and developed an improved method for minimize the variance between standard cost and actual cost of materials of the company. In this method we proposed efficient ERP cost management system considering current cost component including currency and actual material cost and overhead costs.

A Study on the Mobile Termination Charge Determination Methodology in UK (영국의 이동망 착신접속료 산정모형 분석)

  • 변재호
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2002.05a
    • /
    • pp.420-424
    • /
    • 2002
  • 이동망 착신접속료의 합리적 산정, 이동망 설비 공동사용 대가 산정 및 보편적 서비스 비용산정 등 다양한 필요성에 따라 영국, 미국 호주 둥에서 이동망 원가를 합리적으로 산정하기 위한 원가선정모델 연구가 활발히 진행되고 있다. 본 고에서는 영국 Oftel 모형을 중심으로 Bottom-up 방식의 이동망 원가모형을 살펴보고 향후 국내 이동망 원가산정 모형 개발시 유의해야 할 시사점을 도출하고자 한다.

  • PDF

Conceptual Framework and Evaluation of Current Cost Accounting (현행원가회계의 개념구조와 평가)

  • 이정록
    • Journal of the Korea Society of Computer and Information
    • /
    • v.3 no.2
    • /
    • pp.229-238
    • /
    • 1998
  • Current cost income is composed of current operating profit and holding gains. There is two viewpoints about the nature of current cost changes: earnings and capital adjustments. The former is based on the financial capital maintenance concept, while the latter is based on the physical capital maintenance concept. Proponents of current cost accounting are convinced that it provides more useful information than conventional accounting. Advocates of financial capital believe that current cost information is needed for management to evaluate their past decisions, and thereby be able to improve their decision-making ability. Defenders of historical cost point out that current cost accounting violates the traditional revenue recognition principle by recognising increases in the value of assets before sales.

  • PDF

A Study on the effect of Mobile Termination Charge by Depreciation methodology Case Study of the UK Mobile Network (감가상각 방법에 따른 이동망 착신접속료의 효과 분석 : 영국 사례)

  • 송연경
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2003.05a
    • /
    • pp.633-636
    • /
    • 2003
  • 이동망 착신접속료는 독점서비스로 원가인하유인이 없으며 기존의 접속료 산정방식인 완전배부방식의 비합리적이고 부당한 원가계산이 문제점으로 거론되면서 합리적인 요금산정방식은 장기증분원가방식이라고 판단됨으로써 영국에서는 이에 대한 연구가 활발하다. 영국의 장기중분방식은 비용을 회수하는 수단으로 경제적 감가상각을 사용하고 있다. 본 고에서는 기존의 완전배부방식에서 사용되던 회계적 감가상각(역사적 원가와 현행원가방식)과 장기증분원가 방식의 경제적 감가상각 방법을 비교함으로써 감가상각 방법에 따라 이동망 착신접속료에 미치는 영향 및 시사점을 분석해 보고자 한다.

  • PDF

아파트 분양원가 공개 논란에 대한 경쟁법적 접근

  • 윤세리
    • Journal of Korea Fair Competition Federation
    • /
    • no.108
    • /
    • pp.2-4
    • /
    • 2004
  • 원가를 공개한다면 사실상 건설사들의 가격담합을 조장하는 결과가 되고 말 것이다. 왜냐하면 서로 경쟁사의 원가구조를 알게 되고 여기에 사회적으로 허용되는 이윤율을 알면 분양가가 얼마나 될 것인지를 짐작할 수 있어 경쟁사의 가격도 알 수 있게 된다. 그렇다면 구태여 경쟁사가 자기의 가격보다 낮은 가격으로 경쟁을 할까봐 두려워서 원가를 절감하고 나아가 가격을 낮추려는 압력이 줄어들 수밖에 없을 것이다. (중략) 이처럼 원가공개는 담합의 성공요인 중의 하나인 담합위반의 감시를 매우 쉽게 해 주고 마는 셈이다. 이런 이유로 공정거래법은 경쟁사업자들 간의 가격정보 교환을 담합의 한 수단 내지 정황증거로 보고 있다. 그런데 법령으로 가격정보의 가장 중요한 부분인 원가를 공개하라는 것은 결국 담합을 조장하여 가격경쟁을 감소시키는 결과가 될 뿐일 것이다.

  • PDF

Research on cost control and scheduling using EVM(Earned Value Management) of ERP(Enterprise Resource Planning) Project (ERP 프로젝트에서 EVM을 활용한 일정 및 원가통제에 관한 연구)

  • Park, Soon-Bong;Lee, Seouk-Joo;In, Hoh
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.04a
    • /
    • pp.1147-1150
    • /
    • 2012
  • Earned value management(EVM)는 프로젝트 진행 상태를 파악하기 위해 주로 비용과 일정 편차, 성과지표를 통합하여 분석하는 것으로 비용/원가 관리를 위해 발전되어 사용되어 왔다. ERP 프로젝트는 국내 솔루션 시장의 가장 높은 점유율을 차지하고 있지만, 수행에 대한 성과평가 및 일정예측 가능한 신뢰성 있는 Tool 은 알려지지 않고 있다. 본 연구에서는 ERP 프로젝트의 EVM 성과지표를 분석을 통해 ERP 프로젝트가 원가측면의 계획대비 수행 적합성이 높으며, 국내 ERP 프로젝트는 분석단계에서 일정 지연이 발생한다는 것을 발견하였다 향후 본 연구를 통해 EVM 성과 지표를 이용한 현재 시점의 프로젝트 상태를 점검하며, 향후 일정과 원가를 예측하여 성공적인 ERP 프로젝트 수행에 도움이 되고자 한다.

활동중심 경영관리를 위한 중소기업 제조원가관리 시스템의 설계

  • 성기범;김승권
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1995.04a
    • /
    • pp.337-348
    • /
    • 1995
  • 제품의 생산 및 제조원가는 크게 직접재료비, 직접노무비, 제조간접비로 나눌 수가 있다. 본 연구는 제조업의 제품별 제조원가분석을 위하여 실제 중소기업을 대상으로 관계형 데이타베이스(Relational Database)를 구축해 보았으며, 작업자의 작업시간을 시급으로 관리하여 줌으로써 제품별 원가요소 중 직접노무비(인건비)를 여러가지 요목별로 산출해 낼수 있는 활동중심 경영관리(ABM: Activity-Based Management)를 위한 원가관리 시스템의 프로토타입(prototype)을 설계하였다. 본 시스템에서는 각 작업자별 실작업시간에 따라 발생하는 시급을 작업자의 급여테이블과 연계하여 구함으로써 작업자별 작업시간관리가 가능할 뿐만 아니라, 제품별 제조시간 조회를 통해 표준시간과 비교하는 자료로 제공될 수가 있다. 또한, 제조간접비(제조경비)는 월말 제조원가 산정시 사용자로부터 입력받아 그 달에 생산한 모든 제품에 가중치(weight)에 의해 배분해 주는 방식을 이용하였으며, 직접재료 원가(자재비)는 제품별로 데이타베이스를 구추갛여 제조원가에 반영시켰다. 그리고, 시스템에 유연성을 주기 위해 A/S 제품인 경우는 추가 자재비를 입력시킬수 있도록 고려하였으며, 재공품재고(WIP: Work-In-Progress)등의 정보를 제공함으로써 효과적인 시스템 운영이 되도록 설계하였다.

  • PDF

Manufacturer/Buyer Coordinating Model under Analyzing Manufacturing Cost and Adjusting Economic Order Quantity in Competitive Market. (경쟁적 공급사슬 환경에서 생산 원가 분석 및 경제적 주문량의 변화를 통한 생산자/수요자 협상 모델)

  • 최윤락;한주윤;정봉주
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.05a
    • /
    • pp.564-571
    • /
    • 2003
  • 단일 기업의 내부적인 공급 사슬 환경이 아닌 정보의 공유가 없는 일정한 수의 생산자들과 수요자들로 이루어진 경쟁적인 공급 사슬환경에서는 각각의 생산자와 수요자들은 상대방의 가격에 대한 정보만을 가지고 의사결정을 하는 것이 일반적이다. 이러한 공급 사슬 환경에서 자신의 이익을 최대화시키며, 경쟁적인 상대방과의 협상을 효율적으로 하기 위해서는 자신의 시스템에 대한 정확한 수리적인 모델이 필요하다. 수요자의 경우, 시장 판매 가격은 제품의 구매 원가와 관련이 있으며 제품의 구매원가는 제품의 수요에 커다란 영향을 미친다. 이러한 제품 수요의 변화는 수요자가 생산자에게 요구하는 경제적인 주문량과 밀접한 관련성을 지닌다. 또한 생산자의 경우, 생산 공정의 변화가 생산 원가에 영향을 미치기 때문에 수요자가 주문하는 경제적인 주문량의 변화에 따른 정확한 생산 원가의 산출이 필요하다. 본 논문에서는 생산자와 수요자의 측면에서 각각의 이익을 최대화할 수 있는 수리적인 모델을 제시한다. 수요자 측면에서는 경쟁 시장환경 기반의 수요량과 시장 가격을 바탕으로 한 최적의 주문량 및 가격을 결정하는 모델을 제시하고, 생산자 측면에서는 수요자의 주문량을 만족시켜주기 위해 생산시스템의 성능 요소를 반영산 생산 원가 산출 모델을 이용하여 납기일 내데 수요자의 주문량을 만족시키기 위한 최적 생산 원가를 산출하는 모델을 제시한다. 제시한 두 가지 모델을 이용하여 생산자와 수요자는 제품에 대한 가격 협상을 통해 각각의 이익을 증진시킬 수 있는 의사결절이 가능하다.

  • PDF