• Title/Summary/Keyword: 운영 리스크

Search Result 161, Processing Time 0.026 seconds

An Analysis on the Characteristics of Each Phase's Risk Factors for High-Rise Development Project (초고층 개발사업 추진을 위한 단계별 리스크 요인의 특성 분석)

  • Chun, Young-Jun;Cho, Joo-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.103-115
    • /
    • 2016
  • The 106 buildings of 200 meters' height or greater were completed around the world in 2015 (CTBUH, The Council on Tall Buildings and Urban Habitat). They beat every previous year on record, including the previous record high of 99 completions in 2014. This brings the total number of 200-meter-plus buildings in the world to 1,040, exceeding 1,000 for the first time in history and marking a 392% increase from the year 2000, when only 265 existed. South Korea recorded three completions during 2015 - improving slightly over 2014, in which it had one. This study focused on the fact that high-rise building development project risks have not reduced in Korea in spite of numerous studies and measures. And it attempted to examine whether existing studies and measures have been presented on the basis of the accurate analysis of existing studies and measures and classify and analyze the characteristics of each phase' s risk factors in the hope that its results would be one reference point as to the measure to prevent high-rise building development project risks in the future. A high-rise building development project is the high risk project as compared with the low-rise project. Because a high-rise development project takes long and is very sensitive to the changing environment. Therefore, in order to succeed the project it becomes necessary to effectively manage the risk involved in the process of the high-rise building development project. The result of this study can be used as the guideline to make the risk management system for the high-rise development project.

CGE 모형을 이용한 다목적댐 운영의 경제파급효과분석: 용수공급기능을 중심으로

  • Jeong, Gi-Ho;Kim, Jae-Hyeon
    • Environmental and Resource Economics Review
    • /
    • v.21 no.1
    • /
    • pp.129-156
    • /
    • 2012
  • This study analyzes the contribution to the national economy of the stable water supply through managing multi-purpose dam. For the analysis, we consider 17 major multi-purpose dams and build a CGE model with summer water and winter water being the production factors as the base year of 2007. We analyze the economic impact of meeting water demand due to the dam management and estimate the risk premium of reducing the uncertainty of water supply. The analysis results show a significant production decrease in the industries of agriculture, forestry and fisheries and tap water as well as the food and beverage industry using the former industries' output as intermediates in the production and show an production increase largely in steel industry and electronic and electrical industries. Being compared to the benchmark solution, GNP is analyzed as being reduced by 0.22~0.68%. Meanwhile, the risk premium is estimated to be about 4 billion to 24 billion won for the value 01 the measure of relative risk aversion in the range 01 0.5 to 3.0.

  • PDF

A Study for New Paradigm Settlement on Business Security Management: Focus on Global Business (산업보안관리에 관한 뉴패러다임의 정립: 글로벌 비즈니스를 중심으로)

  • Yu, Hyung-Chang
    • Korean Security Journal
    • /
    • no.39
    • /
    • pp.355-386
    • /
    • 2014
  • Current business environment asks the fundamental changes about business security. The essences of these changes are that the security management of today's global business is important task of managers and the security practitioner is professional who needs very specialized education and training with business thinking. Rapid process of globalization of global village tore down the business limit that was restricted on the geological areas' limitation. Rapid business environments' change that is driving depends on development of science and technology with globalization needs new paradigm to keep business continuity. With the process of globalization, Korea, which importance is gradually increasing in the national economy, has trade dependent economic system, which keeps power of national economy through trade, so Korean economic tendency is accelerating. To keep competitiveness in global market, new strategy that is different with existing domestic business management is necessary. That is, capacity of coping with outside risk in domestic business management is established in some degree, but business activities in foreign countries faces at numerous unexpected risks that differ from country to country such as difference with the custom, changes of corporate governance etc. To cope with these new risks effectively, new paradigm for business risk is necessary. Especially, flexibility of thinking like new paradigm is necessary to cope with new security risk effectively. To cope with security risk that occurs in the new business environment effectively and competes against international company in global market, company management and members' changes of cognition about security and innovative changes in security policy is necessary. In the basement of these changes, there is expansion of business security tasks, improvement of report line, enhancement of professionalism and status of security officers, variation of hands-on workers and increasing of investment to the security etc.

  • PDF

정보시스템 장애요인 분석을 통한 운영 프로세스 개선안 연구

  • Park, Seon-Cheol;Lee, Won-Yeong
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2008.10a
    • /
    • pp.136-140
    • /
    • 2008
  • 분산된 아키텍처 구조하에서의 정보시스템 구성은 처리해야 할 정보의 양에 따라 서버의 수가 증가될 수 밖에 없으며, 다수의 하드웨어와 운영체제 그리고 다양한 소프트웨어를 운영하여야 하므로 운영 및 관리의 리스크와 비용은 급격히 증가하게 된다. 이를 해결하기 위하여 그동안 도입 서버의 통합기술, 시스템 이중화 기술 등이 개발되어 적용되었으며, 수년전부터는 ITSM 프레임워크 도입되어 시스템의 운영과 관리의 효율성을 높이고자 하였다. 본 논문에서는 시스템 운영관리의 핵심지표인 가동율에 영향을 미치는 장애현황을 요인별로 분석하여 ITSM 프레임워크하에서 운영되는 정보시스템 운영관리 프로세스의 적용 효과를 측정하고 운영관리프로세스의 바람직한 개선 모델을 제시하고자 한다.

  • PDF

Flight Test Safety Risk Assessment and Mitigation (비행시험 안전 리스크 평가 및 완화 연구)

  • Kim, Mu-Geun;Yoo, Beong-Seon;Han, Jeongho;Kang, Ja-Young
    • Journal of Advanced Navigation Technology
    • /
    • v.22 no.6
    • /
    • pp.537-544
    • /
    • 2018
  • A national comprehensive aviation test center is being constructed for the purpose of flight tests for development and modification of aircraft or flight inspections for the development of navaids. Flight testing is a high-risk task, so strict risk management processes are required prior to operation. In addition, since the flight test center is subject to the airdrome regulations under the current law, the introduction of the safety management system will enhance safety as usual in ordinary airports. The establishment of a safety management system based on ICAO criteria is an optimal means of ensuring safe and effective operation of the test center and may mitigate the risks that may arise during flight testing. This paper focuses on risk assessment and mitigation required for safety management at the flight test center. We conducted risk assessments on the flight hazards identified in the previous study. Then the high risk group of hazards were selected and risk mitigation techniques such as avoidance, reduction, acceptance, and control were applied.

Development of Risk Analysis Structure for Large-scale Underground Construction in Urban Areas (도심지 대규모 지하공사의 리스크 분석 체계 개발)

  • Seo, Jong-Won;Yoon, Ji-Hyeok;Kim, Jeong-Hwan;Jee, Sung-Hyun
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.3
    • /
    • pp.59-68
    • /
    • 2010
  • Systematic risk management is necessary in grand scaled urban construction because of the existence of complicated and various risk factors. Problems of obstructions, adjacent structures, safety, environment, traffic and geotechnical properties need to be solved because urban construction is progressed in limited space not as general earthwork. Therefore the establishment of special risk management system is necessary to manage not only geotechnical properties but also social and cultural uncertainties. This research presents the technique analysis by the current state of risk management technique. Risk factors were noticed and the importance of each factor was estimated through survey. The systemically categorized database was established. Risk extraction module, matrix and score module were developed based on the database. Expected construction budget and time distribution can be computed by Monte Carlo analysis of probabilities and influences. Construction budgets and time distributions of before and after response can be compared and analyzed 80 the risks are manageable for entire whole construction time. This system will be the foundation of standardization and integration. Procurement, efficiency improvement, effective time and resource management are available through integrated management technique development and application. Conclusively decrease in cost and time is expected by systemization of project management.

A Study for strategic cooperaton of enterprise security and business (기업보안과 비즈니스의 전략적 협력에 관한 연구)

  • Ryu, Hyung-Chang
    • Korean Security Journal
    • /
    • no.28
    • /
    • pp.103-130
    • /
    • 2011
  • This study is the research of enterprise security for raising the profitability and stability of Korean companies in global business environment and strategic cooperation of business. As the scientific technology gets complicated as day goes by and new competitors appear regardless the border in the modern business environment, the situation happens frequently which the huge company hands over their market to the new one armed with the innovative thinking overnight. To survive such new environment, the answer is the change of paradigm regarding business management method at the new point of view. With the low level of security risk management of Korean companies which stick to old habit, the security management which helps the companies secure profits is not affordable. The global village where the population of 7 billions live in 21st century is facing up to the rapid ecological adaptation. The rapid change of climatic environment creates the hundreds of thousands of sufferers in a moment, and we have been watching the millions of livestock are buried alive due to new contagious disease everyday. Such change encourages the humans in global village to change the basic way of living. The business ecosystem which is the basic root for economic life cannot be an exception. To survive the business environment of 21st century, the security risk management at management level is required and the reporting line of companies should be established newly for raising business competing power through security risk management. The companies should bear in mind that they can be disappeared into our old memories overnight if they are not sensitive to the changing environment. Out of new risks for the modern companies, the field especially Korean companies are dealing easily is the security risk. Not like past, the security risk which's size is much more massive and its propagation velocity is very fast is the one of important business risks which the management should take care. Out of security risks which influence on the modern companies significantly, the brand of companies, protection of their reputation, continuity of production and operation and keeping customer's trust are prior to the others. This study offered the suggestion regarding enterprise security and the strategic cooperation of business to deal with such security risk effectively.

  • PDF

A Study on G2 Risk and Export Diversification: Focusing on Export Support System for SMEs (수출다변화를 통한 G2 리스크 극복 방안에 관한 연구: 중소기업 수출지원 정책을 중심으로)

  • Choi, Don-Seung;Khoe, Kyung-Il
    • Journal of Convergence for Information Technology
    • /
    • v.9 no.10
    • /
    • pp.48-55
    • /
    • 2019
  • This study argued problems and improvement of export support system for SMEs in the uncertain world global trade environment with G2(US-China) risk. In SMEs export support system, The authorities needs stronger control tower to promote consistent export support policies. There is also another problem of repetitious work that export support system has been operated by individual project. In order to overcome these problems, first, the authorities set clearly organization to control various export support policies. Second, export support system needs the efficient operation based on long term road map. Third, the authorities defines clear roles and responsibilities of supporting units, and enhances cooperation between the different organizations. Finally, the system should arrange performance evaluation index and feedback system to build the desirable export support system.

PFI법을 적용한 일본의 ESCO사업

  • 에너지절약전문기업협회
    • The Magazine for Energy Service Companies
    • /
    • s.29
    • /
    • pp.48-61
    • /
    • 2004
  • 최근 일본에서는 ESCO사업에 PFI법을 새로이 적용하고 있다. 성과배분제, 성과보증제에 이어 이 제도를 적용할 경우, 국가 및 공공기관을 대상으로 하는 ESCO사업의 확대 및 자금조달이 한층 유리해질 전망이다. 지난 99년 제정된 PFI(Private Finance Initiative)법(민간자금 등의 활용에 의한 공공시설 등의 정비 등의 촉진에 관한 법률)에 근거한 사업은 ''공공시설 등''에 있어서 건설, 유지관리 운영 등을 민간의 자금, 경영능력 및 기술적 능력을 활용하는 사업방법으로 사업 전체의 리스크관리가 효율적으로 행해지는 것과 설게$\cdot$시공$\cdot$유지관리$\cdot$운영의 전부 또는 일부를 일체적으로 취급하는 것에 의해 사업비용의 절감이 기대되며 질 높은 서비스의 제공이 가능한 제도이다. 이것과 매우 유사한 개념을 가지고 있는 것이 성과보증제에 의한 ESCO사업이다. 민간사업자인 ESCO사업자가 자금을 조달하고 에너지절약 개수공사에 따른 설계$\cdot$시공$\cdot$, 운전$\cdot$유지관리, 계측$\cdot$검증, 에너지절감 보증 등의 서비스를 제공하며, 광열수도비 및 운전$\cdot$유지관리비의 절감분으로 모든 투자와 ESCO사업자의 경비를 지불한다. 또 에너지절감 및 공공의 이익보증을 포함한 퍼포먼스계약이라고 하는 형태를 취하는 것으로 공공 이익의 최대화를 도모함과 동시에 금융기관의 투자 리스크에 관한 우려를 회피할 수도 있다. 또 PFI법 특유의 법제상, 재정상의 조치와 재정상 및 금융상의 지원이라는 배려에 있다. 예를 들면, 국고채무부담행위의 설정, 행정재산 사용료의 무상화 또는 감면, 프로젝트 파이낸싱 등에 의한 자금조달을 고려할 경우에 있어서 담보권의 설정 등에 관한 제도를 합리적으로 정비하는 것이 가능하게 된다. 그 내용의 대강을 살펴본다.

  • PDF

The Process Development and Application of the Contingency Management by the Performance Analysis (성과분석을 통한 건설공사 예비비 관리 프로세스 및 적용)

  • Lee, Man-Hee;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.84-92
    • /
    • 2007
  • To reduce uncertainties and make rational plans, the presumption of contingency against a failure of projects and an occurrence of unpredictable risks is important with accurate estimations as the work progressing. Therefore, if the presumption of contingency reflecting uncertainties carries out at a decision making point of time, be able to prepare for risks. The purpose of this paper is to present a management process of contingency through the performance analysis of project. In the cost planning phase, this study offers a process which is predictable contingency and predicts the range of fluctuation of the cost, laking an advantage of EVM in construction phase. With reflecting the results from this procedure, this study presents a process, rationally manageable contingency.