• Title/Summary/Keyword: 우물재개발

Search Result 1, Processing Time 0.021 seconds

Agricultural Radial Collector Wells in South Korea and Sustainability (한국의 농업용 방사상 집수정 현황 및 지속가능성)

  • Hong, Soun-Ouk;Song, Sung-Ho;An, Jung-Gi;Kim, Jin-Sung
    • The Journal of Engineering Geology
    • /
    • v.26 no.3
    • /
    • pp.331-337
    • /
    • 2016
  • Radial collector wells (RCWs) have been managed by Korea Rural Community Corporation (KRC) since 1983, installing 98 wells for agriculture in rural area over the country. Among them, 20 wells were installed upstream of 5 subsurface dams and the remaining were installed regardless of the subsurface dam. Most of RCWs have been developed in 1980s and 1990s, and 83 wells have been passed more than 20 years after construction. The number of horizontal arms for RCWs varies from 9 to 28, with length and diameter being 10~30 m and 65 mm, respectively. The central caisson with an inner diameter of 3.5 m was commonly constructed to a depth of 10 m. The maximum pumping rates in RCWs, which are located at distances of 10 to 1,200 m from the river, are 2,000~10,000 m3/day. RCW has a fundamental problem that reduced pumping capacity and degraded well efficiency, due to the physical and chemical clogging. From the feasibility test for improving RCW performance, specific capacity increased to 67% after rehabilitation. TV logging for RCW horizontal arm shows that near the caisson is more severe clogging. From the results of this study, KRC has established the guidebook for monitoring and improving well efficiency through physical/chemical treatment, well logging, and hydraulic tests and managed RCWs periodically with its rehabilitation methods.