• Title/Summary/Keyword: 용접강관

Search Result 141, Processing Time 0.028 seconds

Development of Semi-automatic Gas Metal Arc Welding Equipment for Fire Piping and Evaluation of Characteristics of Weld Joints (소방배관용 강관을 위한 반자동 가스메탈아크용접장치 개발과 용접부 특성평가)

  • Lim, Young-Min;Oh, Tae-Suk;Jo, Hyun;Koh, Jin-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.4
    • /
    • pp.1460-1465
    • /
    • 2012
  • The semi-automatic gas metal arc welding equipment was developed and the weldability of zinc coated steel pipes was evaluated in terms of strength, porosity and welding parameters including shielding gas composition. The good bead appearance and the reduction of porosity in the welds could be possibly obtained by adding $O_2$ to Ar. The strength and joint efficiency of welds made by the semi-automatic welding equipment was about 1.8 times higher compared with welds manually made. The integrity of welds was confirmed by the water pressure test as well, Finally, it is expected that the weld productivity will be enhanced even unskilled welders can produce quality welds by operating the semi-automatic welding equipment.

Bolted Bonding Method of Steel Pipe Pile and Cap (볼트식 강관말뚝 머리보강 방법)

  • 박영호;김성환;장용채
    • Geotechnical Engineering
    • /
    • v.14 no.6
    • /
    • pp.57-71
    • /
    • 1998
  • Present bonding methods which connect steel pipe and spread footing in pile foundation have been generally used. These methods however showed lots of difficulties in the quality control. A new bonding method, which is called 'Bolted Bonding Method(BBM)' , is developed. This method uses factory-made parts so that it may increase the degree of quality, and workability, and is being adopted in the Held concerned. The method is verified by the structural analysis and laboratory test and then a new design formula is proposed. In addition, a comparison test of the present methods and BBM are conducted to observe the applicability and economy of the latter. As results, it is observed that BBM shows 5 to 10 times faster in Held work and 9% to 50% cheaper in construction cost than the existing methods.

  • PDF

The Comparison Analysis of Welding Techniques in Water Distribution Steel Pipes (상수도강관 용접접합의 방법별 비교분석)

  • Kim, Eung-Seok;Jeong, Won-Sik;Kim, Sung-Pyo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.6
    • /
    • pp.2859-2865
    • /
    • 2011
  • The welded connection is known as an essential factor for establishing qualified construction and/or maintenance of wrapped steel pipe. In this study, welded connection conditions in the coated pipes with large diameter (over 700 mm) in Korea water distribution systems were estimated for suggesting technically and economically available welded connection method. For the study analysis, current steel pipe usage and accident cases were investigated. In addition, the characteristics of each welded connection method and automatic or manual connection techniques were also compared and estimated. As results, automatic welded connection method is superior than manual welded connection method in aspect of pure construction cost (average 9%) or pure welded connection cost (average 13.5%). When the poor welding-working situations in Korea are considered such as high tolerance of out-of-roundness in KS regulation, a number of lap joint welded connections, the real cost benefits of automatic welded connection should be much higher than those of manual welded connections.