• Title/Summary/Keyword: 용산철도 공장

Search Result 2, Processing Time 0.019 seconds

A Study on the Rolling Stock Workshop to Analyze the Contribution to the Modern Korean Architecture (한국근대기 철도공장의 건축적 특성에 관한 연구 -용산공장을 중심으로-)

  • Lee, Sang-Haeng
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.6
    • /
    • pp.1049-1058
    • /
    • 2009
  • Korea's Rolling stock workshop were established with the introduction of a railway, and became the center of industrial construction in the modern age of Korea. There still exist a lot of Rolling stock workshop buildings in the Youngsan Rolling stock workshop, the representative case of Korean Rolling stock workshop, and especially the study aims to look into modern architectural properties centered on those well-preserved buildings. Korea's Rolling stock workshop were built considering the proper conditions of location such as the neighboring districts from the port to transport vehicles and materials, the place where railroad lines are centralized, the short returning distance of railroad cars for entry and departure, and had the facility layout according to the order of a working process of vehicles, and the unique structure and the section facade shape with proper functions and sizes according to each purpose. In particular, they actively adopted steel-frame structure and reinforced concrete structure, and came to have the initial characteristics of Korea's modern industrial building which is called the structural transition. Therefore, this study aims to highlight the importance of Rolling stock workshop including the Youngsan Rolling stock workshop as industrial architecture heritage in the modern age of Korea.

An Evaluation of Development Plans for Rolling Stock Maintenance Shop Using Computer Simulation - Emphasizing CDC and Generator Car - (시뮬레이션 기법을 이용한 철도차량 중정비 공장 설계검증 - 디젤동차 및 발전차 중정비 공장을 중심으로 -)

  • Jeon, Byoung-Hack;Jang, Seong-Yong;Lee, Won-Young;Oh, Jeong-Heon
    • Journal of the Korea Society for Simulation
    • /
    • v.18 no.3
    • /
    • pp.23-34
    • /
    • 2009
  • In the railroad rolling stock depot, long-term maintenance tasks is done regularly every two or four year basis to maintain the functionality of equipments and rolling stock body or for the repair operation of the heavily damaged rolling stocks by fatal accidents. This paper addresses the computer simulation model building for the rolling stock maintenance shop for the CDC(Commuter Diesel Car) and Generator Car planned to be constructed at Daejon Rolling Stock Depot, which will be moved from Yongsan Rolling Stock Depot. We evaluated the processing capacity of two layout design alternatives based on the maintenance process chart through the developed simulation models. The performance measures are the number of processed cars per year, the cycle time, shop utilization, work in process and the average number waiting car for input. The simulation result shows that one design alternative outperforms another design alternative in every aspect and superior design alternative can process total 340 number of trains per year 15% more than the proposed target within the current average cycle time.