Effects of the Methods for Generating and Selecting Multiple Preliminary Prices on Budget Prices in Bidding Processes (복수예비가격 생성 및 추첨방법이 예정가격에 미치는 영향)

  • Kang, Minseok;Riew, Moon Charn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.1
    • /
    • pp.89-97
    • /
    • 2015
  • In bidding processes conducted by government agencies, local governments or public agencies, budget prices are critical to both ordering bodies and bidders since budget prices are bases for selecting a successful bidder. Since a high budget price goes against ordering bodies and a low one goes against bidders, most ordering bodies adopt a system using multiple preliminary prices for determining a budget price to ensure fair and transparent manners. Discussed are how budget prices change depending on the methods of sampling 15 preliminary prices and the methods of sampling 4 out of 15 prices. Computer simulation is conducted to analyze budget prices for various methods to determine multiple preliminary prices. It is more likely for budget prices to be close to base prices when splitting a range of generating preliminary prices into 15 intervals and taking 4 preliminary prices from 15 intervals than when taking 4 preliminary prices from a whole range. In cases when splitting a range of generating preliminary prices, if we take 2 preliminary prices out of intervals above 100% and take 2 out of intervals below 100%, the expected budget prices are equal to a base price and the standard deviations are about half in comparison with those when taking 4 out of 15 intervals.

An Empirical Study on Determining Factors of estimation cost: Focused on Defense Goods (예정가격 결정요인에 관한 연구: 방산물자를 중심으로)

  • Song, Young-Il;Kim, Dong-Uk;Shim, Suk-Hwa
    • Journal of the military operations research society of Korea
    • /
    • v.37 no.1
    • /
    • pp.99-118
    • /
    • 2011
  • According to the National Contract Law, when determining Estimation cost Contract officers should consider contract quantity, contract period, supply and demand condition, difficulty of contract enforcement, terms and condition, and other various conditions based market price, costing based pricing, and appraisal. And they should not overestimate or underestimate the estimation cost. But the estimation cost system is used as preparedness for audit against the contract law. In this study, we identified the factors affecting estimation cost and analyzed their influence on estimation cost.

2006년 하반기 건설공사 실적공사비 적용 공종 및 단가

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.10 s.195
    • /
    • pp.38-48
    • /
    • 2006
  • 정부등 공공기관에서 시행하는 건설공사 예정가격 작성시 적용되는 2006년 하반기 실적공사비 적용대상 공종 및 단가 931개(기계설비 216, 건축 335, 토목 350)가 지난 8월 14일 공표되었다. 실적공사비 단가는 재료비, 노무비, 직접공사 경비가 포함된 공종별 단가를 계약단가에서 추출하여 유사공사의 예정가격 산정에 활용하는 방식으로 공공건설공사의 예정가격 작성시 적용되고 있다. 또한 실적공사비 단가는 공공건설공사의 설계조건이 유사한 공종을 대상으로 계약단가가 설계단가 대비 ±25% 범위 내의 단가로 2006년 하반기 실적단가 설계가 대비 평균 낙찰률이 70% 수준이다. 대부분의 공공기관에서 예정가격 작성시 적용하고 있는 실적공사비 단가는 종전의 표준품셈에 의한 예정가격 작성시보다 공사예정가격이 낮게 산정되고 있다. 따라서 설비건설업계도 이를 감안하여 반드시 적정공사비를 확보할 수 있는 금액으로 입찰에 참가해야 한다.

  • PDF

Prediction of Budget Prices in Electronic Bidding using Deep Learning Model (딥러닝 모델을 이용한 전자 입찰에서의 예정가격 예측)

  • Eun-Seo Lee;Gwi-Man Bak;Ji-Eun Lee;Young-Chul Bae
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.18 no.6
    • /
    • pp.1171-1176
    • /
    • 2023
  • In this paper, we predicts the estimated price using the DNBP (Deep learning Network to predict Budget Price) model with bidding data obtained from the bidding websites, ElecNet and OK EMS. We use the DNBP model to predict four lottery preliminary price, calculate their arithmetic mean, and then estimate the expected budget price ratio. We evaluate the model's performance by comparing it with the actual expected budget price ratio. We train the DNBP model by removing some of the 15 input nodes. The prediction results showed the lowest RMSE of 0.75788% when the model had 6 input nodes (a, g, h, i, j, k).

A Study on the Development of Work-Crew based Daily-Productivity for Representative B.O.Q Item in Road Project (도로공사 대표공종의 생산성 정보 개발에 대한 연구)

  • Seo, Ji-Hyeong;Park, Hyung-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.42-53
    • /
    • 2011
  • This study is to present a method of compiling consistently accurate construction cost estimates in minimum of time. There are two kind of applications for estimating system based on quantity-per-unit and the daily work-crew. The former system is still applied 45% as a estimating method to construction job site by the second half of 2010. However, it is necessary for quantity-per-unit to complement the defect of standard integrating specification and improve the integrating method to the various construction conditions. The later system is intended to represent a standard or basic core which can be adopted in many type of construction estimating used across the wide variety of construction in advanced countries. In this study daily work-crew based on productivity is applied to the representative B.O.Q Item in road project. These results are compared to productivity of Japan and U.S.A estimated under the similar circumstances.

Generating Reserve Prices for an Inernet Auction System Using Exponential Smoothing Techniques (지수평활법을 이용한 인터넷 경매 시스템 낙찰 예정가 생성)

  • Ko, Min-Jung;Lee, Yong-Kyu
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2003.11c
    • /
    • pp.1699-1702
    • /
    • 2003
  • 최근에 인터넷을 통한 전자경매가 보편화되면서 경매 물품의 가격 결정에 대한 관심이 증가하고 있다. 또한, 경매물품의 낙찰가를 판매자가 결정하거나 정보 검색이론의 사례 유사도에 기초하여 생성하는 에이전트가 연구되고 있다. 그러나, 이것은 경매 물품에 대한 최근의 변화 요인을 반영하지 못하고, 상품 추천에서 사용하는 사례 유사도를 가격 결정에 적용하여 잘못된 가격이 생성되는 경우가 많다. 본 논문에서는 이러한 문제점을 해결하고자 시계열 예측에서 사용하는 지수평활법을 이용하여 최근의 경매자료로부터 경매 등륵 물품의 낙찰 예정가를 자동으로 생성하는 시스템을 제안한다. 성능 실험 결과, 본 시스템을 사용할 경우에 경매 물품의 실제 낙찰가와 차이를 줄여 낙찰률을 높이고, 경매 물품의 객관적인 가격형성이 가능함을 보인다. 또한 기존의 사례 유사도를 이용한 낙찰 예정가 생성 방식과의 성능 비교를 통하여 새로운 방법의 효율성을 나타낸다.

  • PDF

조달청, 조달행정쇄신 방안

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.59
    • /
    • pp.30-33
    • /
    • 1995
  • 조달청은 지난 5월 23일 조달행정쇄신방안을 마련, 현행 가격위주 낙찰제도를 품질확보를 위한 계약제도로 개선한다는 방침 아래 2단계 경쟁입찰제, 경쟁적 협상계약 제도를 도입하는 등 다양한 조달 방식을 마련, 재정경제원 등 관계부처와 협의를 통해 예정가격 작성준칙 등 관계규정을 개정해 올해안에 시행하기로 했다.

  • PDF

법령과 고시 - 표준시장단가(실적공사비) 제도 관련 계약예규 개정

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.297
    • /
    • pp.110-116
    • /
    • 2015
  • 국가 발주 공사는 3월 1일, 지방자치단체 발주 공사는 3월 9일 예정가격을 작성하는 사업부터 표준시장단가 제도가 적용된다. 대한설비건설협회(회장 이상일)를 비롯한 건설관련 유관단체에서는 실적공사비의 불합리한 공사비 산정 기준 및 운영관행에 대해 폐지 건의를 지속적으로 해왔다. 정부는 이같은 건의를 받아들여 지난해 12월 17일 실적공사비 제도개선을 위한 공청회를 개최하고 개선안을 발표했으며, 이번 계약예규 개정을 통해 개선됐다. 이에 따라 실적공사비 제도를 대체하는 새로운 공공공사비 산정 방식인 표준시장단가 제도가 지난 3월 1일부터 시행에 들어감에 따라 기획재정부는 국가계약예규를, 행정자치부는 지방계약예규를 개정해 각각 지난 3월 1일과 3월 5일 공포하고 시행에 들어갔다. 각 개정 계약예규는 실적공사비의 명칭이 표준시장단가로 변경됨에 따라 용어를 수정했고, 실적공사비 제도 적용배제 범위를 신설했다. 또한 적용배제 공사범위는 300억원 미만 공사 중 100억원 미만 공사는 실적공사비(표준시장단가) 적용을 폐지하고, 100억원 이상부터 300억원 미만 공사는 2016년 12월 31일까지 한시적으로 적용하지 않는다. 정부는 100억원~300억원 공사에 대한 '실적공사비 적용 배제제도' 연장 여부를 2016년 하반기에 실적공사비 현실화 수준 등을 평가하여 재검토할 예정이다. 한편, 표준시장단가 제도는 공사비를 산정할 때 현행 계약단가 외에도 시공단가와 입찰단가 등 다양한 시장 거래가격을 반영하는 제도로, 지난 1월 22일 국가정책조정회의를 거쳐 확정된 '공공건설 공사비 적정성 제고방안' 후속조치의 일환으로 공공공사비 예정가격 산출방식의 하나인 실적공사비제도를 개선한 것이다.

  • PDF

A Study on Practical Ways to Improve Pricing Criteria for Technical Service Contracts (기술용역 대가기준의 문제점 및 개선방안)

  • Lee, Taewon;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.33-43
    • /
    • 2014
  • Goods, services and construction works needed by central government entities, local government entities, and other public institutions are procured with national budget. For efficient budget execution, Article 9 Paragraph 1 of the Enforcement Decree of the Act on Contracts to Which the State is a Party (hereinafter "State Contract Act") provides for the criteria for determining estimated price. Sub-paragraph 2 of the paragraph provides for the "determination of estimated price by cost calculation". On this legal basis, pricing criteria for the determination of estimated price, based on the project purpose, are announced by responsible authorities. This study analyzes the pricing criteria for technology services and proposes a price calculation methodology that can ensure transparency, as a practical improvement for more rational and efficient budget execution in the public sector.