• Title/Summary/Keyword: 열차속도

Search Result 405, Processing Time 0.027 seconds

Investigation into influence of sound absorption block on interior noise of high speed train in tunnel (터널 내부 도상 블록형 흡음재의 고속철도차량 내부 소음에 미치는 영향에 대한 고찰)

  • Lee, Sang-heon;Cheong, Cheolung;Lee, Song-June;Kim, Jae-Hwan;Son, Dong-Gi;Sim, Gyu-Cheol
    • The Journal of the Acoustical Society of Korea
    • /
    • v.37 no.4
    • /
    • pp.223-231
    • /
    • 2018
  • Recently, due to various environmental problems, blast tracks in tunnel are replaced with concrete tracks, but they have more adverse effects on noise than blast tracks so that additional noise measures are needed. Among these measures, sound-absorbing blocks start to be used due to its easy and quick installation. However, the performance of sound absorption blocks need to be verified under real environmental and operational conditions. In this paper, interior noise levels in KTX train cruising in Dalseong tunnel are measured before and after the installation of sound-absorbing blocks and the measured data are analyzed and compared. Additionally, noise reduction are estimated by modeling the high speed train, the tunnel and absorption blocks. Measurement devices and methods are used according to ISO 3381 and the equivalent sound pressure levels during the cruising time inside the tunnel are computed. In addition to overall SPLs(Sound Pressure Levels), 1/3-octave-band levels are also analyzed to account for the frequency characteristics of sound absorption and equipment noise in a cabin. In addition, to consider the effects of train cruising speeds and environmental conditions on the measurements, the measured data are corrected by using those measured during the train-passing through the tunnels located before and behind the Dalseong tunnel. Analysis of measured results showed that the maximum noise reduction of 6.8 dB (A) can be achieved for the local region where the sound-absorbing blocks are installed. Finally, through the comparison of predicted 1/3-octave band SPLs for the KTX interior noise with the measurements, the understanding of noise reduction mechanism due to sound-absorbing blocks is enhanced.

Static and Dynamic Analysis for Railway Tunnel according to Filling Materials for overbroken tunnel bottom (철도터널 하부 여굴처리 방법에 대한 정적 및 동적 안정성 검토)

  • Seo, Jae-Won;Cho, Kook-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.5
    • /
    • pp.668-682
    • /
    • 2017
  • Alignments of railways recently constructed in Korea have been straightened due to the advent of high-speed rail, which means increasing the numbers of tunnels and bridges. Overbreak during tunnel construction may be unavoidable, and is very influential on overall stability. Over-excavation in tunneling is also one of the most important factors in construction costs. Overbreak problems around crown areas have decreased with improvements of excavation methods, but overbreak problems around bottom areas have not decreased because those areas are not very influential on tunnel stability compared with crown areas. The filling costs of 10 cm thickness of overbreak at the bottom of a tunnel are covered under construction costs by Korea Railway Authority regulations, but filling costs for more than the covered thickness are considered losses of construction cost. The filling material for overbreak bottoms of tunnels should be concrete, but concrete and mixed granular materials with fractured rock are also used for some sites. Tunnels in which granular materials with fractured rock are used may have a discontinuous section under the concrete slab track. The discontinuous section influences the propagation of waves generated from train operation. When the bottom of a tunnel is filled with only concrete material, the bottom of the tunnel can be considered as a continuous section, in which the waves generated from a train may propagate without reflection waves. However, a discontinuous section filled with mixed granular materials may reflect waves, which can cause resonance of vibration. The filled materials and vibration propagation characteristics are studied in this research. Tunnel bottom filling materials that have ratios of granular material to concrete of 5.0 %, 11.5 %, and 18.0 % are investigated. Samples were made and tested to determine their material properties. Static numerical analyses were performed using the FEM program under train operation load; test results were found to satisfy the stability requirements. However, dynamic analysis results show that some mixed ratios may generate resonance vibration from train operation at certain speeds.

Study on Structural Integrity and Dynamic Characteristics of Knuckle Parts of KTX Anti-Roll Bar (KTX 고속열차 안티롤바 너클부의 동특성 및 구조 안전성 평가)

  • Jeon, Kwang Woo;Shin, Kwang Bok;Kim, Jin Woo;Jeong, Yeon Il
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.37 no.8
    • /
    • pp.1035-1041
    • /
    • 2013
  • To evaluate the structural integrity and dynamic characteristic of the knuckle part of a KTX anti-roll bar, an experimental and a numerical approach were used in this study. In the experimental approach, the acceleration and strain data for the knuckle parts of the KTX and KTX-SANCHUN anti-roll bar were respectively measured to evaluate and compare its structural dynamic characteristics under the operating environments of the Honam line. In the numerical approach, the evaluation of its structural integrity was conducted using LS-DYNA 3D, and then, the reliability of the finite element model used was ensured by a comparative evaluation with the experiment. The numerical results showed that the stress and velocity field of the knuckle part composed of a layered structure of a thin steel plate and rubber were more moderate than those of the knuckle part made of only a thick steel block owing to the reduction of relative contact between the knuckle and the connecting rod. It was found that the knuckle part made of a thin steel plate and rubber was recommended as the best solution to improve its structural integrity resulting from the elastic behavior of the KTX anti-roll bar being enabled under a repeating external force.

Simulation and Testing of the Effect of Current Collection Performance According to Pre-sag in 400km/h Overhead Contact Lines (400km/h 전차선로에서 사전이도가 집전성능에 미치는 영향에 대한 시뮬레이션 및 시험)

  • Kwon, Sam Young;Cho, Yong Hyeon;Lee, Kiwon;Oh, Hyuck Keun
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.3
    • /
    • pp.288-296
    • /
    • 2016
  • A 400km/h simple catenary system was constructed as a test line in Korea. In the design stage of this system, the pre-sag was one of the engineering issues most focused on. It is known that the pre-sag improves the current collection performance in a certain band of high speed. However, the effect of pre-sag at 400km/h has not yet been established. To grasp a better pre-sag in the 400km/h catenary, we transacted the dynamic performance prediction simulation between catenary and pantograph under conditions of 0 and 1/3000 pre-sag. The level of 0 pre-sag was adapted for the 400km/h catenary design after reviewing predictions. We constituted the 1/3000 pre-sag sample section (about 1km) while constructing the 400km/h catenary test-bed (28km) of 0 pre-sag. With a HEMU-430X train, the contact forces were measured in the test-bed including the pre-sag sample section. In this paper, the predicted and measured dynamic performance values (contact forces) for 0 and 1/3000 pre-sag are described and compared. It is conclusively confirmed by analytical and experimental examination that the non pre-sag showed better dynamic (current collection) performance than that of the 1/3000 pre-sag for the 400km/h catenary system.

Evaluation of Applicability of Apparent Track Stiffness Measured by Light-Weight Deflectometer as a Ballasted Track Condition Index (소형동평판재하시험기로 측정한 궤도 겉보기 강성의 자갈궤도 상태평가 지표로서의 적용성 고찰)

  • Choi, Yeong-Tae;Hwang, Sung Ho;Jang, Seung Yup;Park, Bongsik;Shim, Gwang Seop
    • Journal of the Korean GEO-environmental Society
    • /
    • v.19 no.2
    • /
    • pp.37-44
    • /
    • 2018
  • Ballasted track has been widely used due to its flexibility. However, the plastic deformation of ballasted track causes the evolution of track geometrical errors, and hence it requires continuous maintenance; increase in number of trains, weight, and speed expedites maintenance frequency and cost as well. Ballast stiffness is well-known as an indicator of design and maintenance. In this regard, this paper aims to suggest the method to measure ballast track stiffness using light-weight deflectometer (LWD) and thus verify its applicability as a maintenance measure. Preliminary field tests determined simple field testing protocol to measure track stiffness. The apparent ballast stiffness by LWD shows good corelation with TQI (Track Quality Index) and maintenance length. That is, as average of apparent stiffness increase, TQI and tamping length decrease exponentially. Therefore, apparent stiffness can be used as an index for ballast condition assessment.

A Study on the Dynamic Behavior of the High Speed Railway Tracks (고속철도(高速鐵道)의 궤도(軌道)에 대한 동특성(動特性) 연구(研究))

  • Moon, Je Kil;Kang, Kee Dong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.12 no.1
    • /
    • pp.97-105
    • /
    • 1992
  • The purpose of this study is to provide the cause and countermeasure for track problems in the high speed railways due to the irregularly increasing dynamic wheel loads running over the speed range of 300 km/h. It has long been recognised that the track problems encountered on high speed railways are associated mainly with vertical dynamic loads which are related to the unsprung mass of vehicles and track irregularities. In addition to these parameters for the estimation of the dynamic wheel load variation, however, the dynamic characteristics of track structures are discussed in this paper with reference to mathematical modelling of the tracks and vehicle. From the results of the more detailed analyses, the effects of track stiffness and damping characteristics are considered to be significant for reducing the dynamic wheel loads. To make this point clear and appraise the overall performance of the track components, the theoretical analysis on the dynamic behavior of the tracks and wheel set impact tests on several track structures are performed. The experimental results from different track components are compared with each other. The track stiffness and damping characteristics are also presented quantatively.

  • PDF

A study on the wire reduction design and effect analysis for the train vehicle line (화물열차 분산제어시스템 개발에 관한 연구)

  • Lee, Kangmi;Lee, Jaeho;Yoon, Yong-Ki
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.12
    • /
    • pp.778-784
    • /
    • 2017
  • In this paper, we propose wired and wireless distributed control systems designed to improve the freight logistics efficiency and verify wired distributed control systems. The verification condition required that 50 cargo vehicles be connected and operated to travel 21 km from Busan Sinhang station to Jinlye Station at an average speed of about 100km/h. The verification results show that the traction output and braking output of the control and controlled cars are dispersed by the wired distributed control system. The application is expected to more than double the efficiency of the logistics compared to the existing freight transportation system. However, in the case of the wired distributed control system, cable installation and maintenance are difficult, and it is impossible to change the combination of freight vehicles. Through the verification of the wired distributed control system, the applicability of distributed control systems to freight vehicles in Korea was confirmed and the system was further developed to produce a wireless distributed control system. In order to apply the wireless distributed control system, a propagation environment analysis for the ISM band was performed in the testbed and, as a result, it was confirmed that Wifi technology using the ISM band could be utilized. In order to use the WDP (Wireless Distributed Power) devices newly installed in the target vehicles, the transmission / reception control signals associated with the propulsion / braking / total control devices are defined. In the case of wireless distributed control systems, the convenience of their application and operation is guaranteed, but reliability and emergency safety measures should because of the dependence of the control of the vehicle on radio signals.

Application of Seismic Tomography to the Inverstigation of Underground Structure in Gupo Train Accident Area (구포 기차 전복사고 지역의 지반상태 파악을 위한 탄성파 토모그래피 응용)

  • 김중열;장현삼;김유성;현혜자;김기석
    • The Journal of Engineering Geology
    • /
    • v.5 no.1
    • /
    • pp.1-20
    • /
    • 1995
  • A train overturn accident occurred on March 1993 in the Gupo area, northern part of Pusan, unfortunately had taken a heavy toll of lives and caused a great loss of property as well. The reasons for the subsidence of the basement under the railroads, which presumed to be the main cause of the accident, have been investigated from many different angles, including conventional geotechnical investigation methods. The deduced nuin reasons of the subsidence were: 1. blasting for tunnel excavation (NATM) at about 39 meter under the railroads, and 2. unexpected change of bedrock conditions along the direction of tunnel. But this accident was derived nrranlv from the lack of geological and geotechnical information under railroad area because it was impossible to drill beneath the railroads. This paper introduces a new geophysical survey techniqueseisrnic geotomography, and shows some results of the method applying to investigate the underground structure of the accident area. This method not only overcomes the unfavourable environment which many conventional investigation methods cannot face, but produces an image of underground structure with high resolution. Furthermore, the outputs from geotomogaphic analysis could provide very valuable in-situ basic parameters (like seismic velocities, elastic moduli, etc.) which is essential to the design and construction.

  • PDF

Oxidation Behavior at the Interface between E-beam Coated $ZrO_{2}$-7wt.%$Y_{2}O}_{3}$and Plasma Sprayed CoNiCrAlY (전자빔 코팅 및 플라즈마 용사에 의한 안정화지르코니아/CoNiCrAlY 계면의 산화거동)

  • Choi, Won-Seop;Kim, Young-Do;Jeon, Hyeong-Tag;Kim, Hyon-Tae;Yoon, Kook-Han;Hong, Kyung-Tae;Park, Jong-Ku;Park, Won-Sik
    • Korean Journal of Materials Research
    • /
    • v.8 no.6
    • /
    • pp.538-544
    • /
    • 1998
  • The spallation of a thermal barrier coating layer depends on the formation of brittle spinels. thermal expansion mismatch between ceramic and metal. the phase transformation of a ceramic layer and residual stress of coating layer. In this work. the formation mechanism of oxide scale formed by oxidation treatment at 90$0^{\circ}C$ was investigated in order to verify oxidation behavior at the interface between E-beam coated $Zr0_2$-7wt.% $Y_20_3$ and plasma sprayed CoNiCrAIY. Some elements distributed in the bond coating layer were selectively oxidized after oxidation. At the initial time of oxidation. AI-depletion zone and $\alpha$-$Al_O_3$,O, were formed at the bond coating layer by the AI-outward diffusion. After layer grew until critical thickness. spinels. $Cr_20$, and $C0_2CrO_4$ by outward diffusion of Co. Cr, Ni were formed. It was found that the formation of spinels may be related to the spallation of $Zr0_2$-7wt.% $Y_20_3$ during isothermal oxidation.

  • PDF

The review about ultra long subsea tunnel design under high water pressure (고수압 초장대 해저터널에 관한 연구)

  • Jun, Duk-Chan;Kim, Ki-Lim;Hong, Eui-Joon;Kim, Chan-Dong;Lee, Young-Joon;Hong, Cheor-Hwa
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.6
    • /
    • pp.829-843
    • /
    • 2017
  • Subsea tunnel needs to be built over 50 km long to connect between nations and continents. However there are only 19 tunnels longer than 5 km until recently. And there is no history of constructing and operating tunnel longer than 50 km. In Korea, subsea tunnels with a length of more than 50 km are being planned, such as Korea~Japan, Korea~China, Honam~Jeju subsea tunnels. Because of the geographical conditions of Korea, most of these tunnels are inter-contry tunnels. So technology preemption for the subsea tunnel construction is getting more and more important. Most of these subsea tunnels are ultra-long tunnels under high water pressure conditions. So new technologies are required such as ventilation and disaster prevention of high-speed tunnels, securing of structural stability under high pressure conditions, and pressure reduction in high-speed conditions. These technologies are different from those of ground tunnels. Therefore, this paper describes the ultra-long subsea tunnel design under high water pressure of maximum 16 bars through the Honam (land) - Jeju (island) virtual subsea project. We proposed a reasonable solution to various problems such as securing structural stability in high pressure condition and ventilation disaster prevention system of ultra long-tunnel.