A Study on Thermal Analysis for a Data Center Cooling System under Fault Conditions at a Chilled Water Plant (비상시 열원중단에 따른 데이터센터의 냉각시스템 열성능 평가에 관한 사례연구)

  • Cho, Jinkyun;Kang, Hosuk
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.28 no.5
    • /
    • pp.178-185
    • /
    • 2016
  • This study describes the analysis of a 20 MW chilled water plant used for the IT cooling of a recently constructed data center in Korea. The CFD model was developed with the aim of evaluating the impact of problems such as chiller failure on the water and air temperatures in the cooling system. The numerical model includes the chilled water hydraulic network and individual water-to-air CRAC units. The coupling between the IT server room air temperature levels and the cooling plant has enabled a full assessment of the cooling system design in response to system fault conditions to be performed. The paper examines an emergency situation involving the failure of the cooling plant, and shows how the inherent thermal inertia of the system along with additional inertia achieved through buffer systems allowed a suitable design to be achieved.

Field Application of a Latent Heat Storage Tank for Load Shaving of Domestic Hot Water Supply in District Heating (지역난방 급탕공급 부하균등화를 위한 잠열축열조의 현장 적용)

  • Park, Sung Yong;Yoo, Hoseon
    • Plant Journal
    • /
    • v.17 no.2
    • /
    • pp.42-47
    • /
    • 2021
  • In terms of district heating operation, efficient production and supply of heat by alleviating the peak load at a specific time require an application technology that can solve the inconvenience of the user and the difficulties of the supplier. In this study, a 78 ℃ class PCM heat storage tank suitable among the technologies that can solve these problems was manufactured and applied to the hot water supply facility for apartments in district heating users. As a result of the application of this system, it was confirmed that the supply temperature was constant to the user compared to the existing supply method. In addition, it was confirmed that the reduction of the peak load due to load equalization reduced the heat supply margin of 10% in the existing heat supply facility. And the construction cost of the new heat supply facility and the construction cost of heat users is decreased by 5% and 10%, respectively.