비상시 열원중단에 따른 데이터센터의 냉각시스템 열성능 평가에 관한 사례연구 (A Study on Thermal Analysis for a Data Center Cooling System under Fault Conditions at a Chilled Water Plant)

  • 조진균;강호석
    • 설비공학논문집
    • /
    • 제28권5호
    • /
    • pp.178-185
    • /
    • 2016
  • This study describes the analysis of a 20 MW chilled water plant used for the IT cooling of a recently constructed data center in Korea. The CFD model was developed with the aim of evaluating the impact of problems such as chiller failure on the water and air temperatures in the cooling system. The numerical model includes the chilled water hydraulic network and individual water-to-air CRAC units. The coupling between the IT server room air temperature levels and the cooling plant has enabled a full assessment of the cooling system design in response to system fault conditions to be performed. The paper examines an emergency situation involving the failure of the cooling plant, and shows how the inherent thermal inertia of the system along with additional inertia achieved through buffer systems allowed a suitable design to be achieved.

지역난방 급탕공급 부하균등화를 위한 잠열축열조의 현장 적용 (Field Application of a Latent Heat Storage Tank for Load Shaving of Domestic Hot Water Supply in District Heating)

  • 박성용;유호선
    • 플랜트 저널
    • /
    • 제17권2호
    • /
    • pp.42-47
    • /
    • 2021
  • 지역난방의 운영적 측면에서 특정시간의 피크부하 완화를 통한 효율적인 열생산과 공급 및 지역난방 공급 중단 시 급탕 공급은 난방 대비 대체가 어려워 사용자 측면의 불편함과 공급자 측면의 애로사항을 해결할 수 있는 적용 기술이 요구되고 있다. 본 연구에서는 이러한 문제점을 해결할 수 있는 기술 중 열저장 능력과 급탕공급에 적합한 78℃급 수화물계 잠열축열조를 제작하여 지역난방 사용자 아파트 급탕공급설비에 현장 적용하였다. 본 시스템의 적용 결과 기존 공급방식 대비 급탕온도의 변화가 거의 없이 일정하게 사용자에게 공급됨을 확인하였으며, 피크 열부하는 평균 35% 감소와 비상열원으로서의 활용 가능성을 확인하였다. 또한 부하균등화에 따른 피크부하 감소로 기존 열 공급시설에서 10%의 열공급 여유와 신규 열공급시설 건설비용 및 열사용자의 공사비부담금이 각 5%와 10%가 감소됨을 확인하였다.