• Title/Summary/Keyword: 연료공급장치

Search Result 244, Processing Time 0.024 seconds

Estimation of Atmospheric Pollutant Emissions from Vessels in Major Harbor Cities in Korea and related Social Cost (국내 주요 항구도시의 선박 배기가스 배출량 산정 및 사회적 비용 추정)

  • Choi, Jung-kil;Kim, Myung-won;Lee, Hyo-jin;Kang, Tea-soon;Lee, Kang-wung
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.27 no.7
    • /
    • pp.905-917
    • /
    • 2021
  • Atmospheric pollutant emissions, mainly exhaust gas emissions from vessels, and the resultant social costs of pollution in the Korean harbor cities of Incheon, Mokpo, Gwangyang, Busan and Ulsan, are examined in this study, and the need for an emissions reduction plan is highlighted. Busan had several vessels entering its port, while Mokpo had few vessels, yet the vessels emission contribution was high in both the cities. Ulsan had world-class heavy-chemical industries, Gwangyang had steel mills and Incheon had a manufacturing industry and more vessels entering its port than Mokpo, yet the emission contribution was low in these cities. By calculating exhaust gas emissions from the vessels, it was found that CO2 was the highest, followed by NOx and SOx. By vessel type, Busan, Ulsan, and Incheon had more oil tank vessels, Gwangyang had more cargo vessels, and Mokpo had more ferries. As a result of social cost, Busan paid the highest, while the highest emission was PM. The use of low-sulfur oil can directly reduce PM and, SOx emissions and indirectly reduce NOx emissions. However, in order to reduce high CO2 emissions, only low-sulfur oil will not help. Therefore, the study suggested the need for reduction plan that use of fossil fuels, by using alternative maritime power (AMP).

Study on Hydrogen Production and CO Oxidation Reaction using Plasma Reforming System with PEMFC (고분자 전해질 연료전지용 플라즈마 개질 시스템에서 수소 생산 및 CO 산화반응에 관한 연구)

  • Hong, Suck Joo;Lim, Mun Sup;Chun, Young Nam
    • Korean Chemical Engineering Research
    • /
    • v.45 no.6
    • /
    • pp.656-662
    • /
    • 2007
  • Fuel reformer using plasma and shift reactor for CO oxidation were designed and manufactured as $H_2$ supply device to operate a polymer electrolyte membrane fuel cell (PEMFC). $H_2$ selectivity was increased by non-thermal plasma reformer using GlidArc discharge with Ni catalyst simultaneously. Shift reactor was consisted of steam generator, low temperature shifter, high temperature shifter and preferential oxidation reactor. Parametric screening studies of fuel reformer were conducted, in which there were the variations of the catalyst temperature, gas component ratio, total gas ratio and input power. and parametric screening studies of shift reactor were conducted, in which there were the variations of the air flow rate, stema flow rate and temperature. When the $O_2/C$ ratio was 0.64, total gas flow rate was 14.2 l/min, catalytic reactor temperature was $672^{\circ}C$ and input power 1.1 kJ/L, the production of $H_2$ was maximized 41.1%. And $CH_4$ conversion rate, $H_2$ yield and reformer energy density were 88.7%, 54% and 35.2% respectively. When the $O_2/C$ ratio was 0.3 in the PrOx reactor, steam flow ratio was 2.8 in the HTS, and temperature were 475, 314, 260, $235^{\circ}C$ in the HTS, LTS, PrOx, the conversion of CO was optimized conditions of shift reactor using simulated reformate gas. Preheat time of the reactor using plasma was 30 min, component of reformed gas from shift reactor were $H_2$ 38%, CO<10 ppm, $N_2$ 36%, $CO_2$ 21% and $CH_4$ 4%.

Development of Heated-Air Dryer for Agricultural Waste Using Waste Heat of Incineration Plant (소각장 폐열을 활용한 농업폐기물 열풍 건조장치 개발)

  • Song, Dae-Bin;Lim, Ki-Hyeon;Jung, Dae-Hong
    • Journal of agriculture & life science
    • /
    • v.53 no.5
    • /
    • pp.137-143
    • /
    • 2019
  • To manufacturing of solid fuel by reuse of the wastes, the drying unit which have 500 kg/hr of drying capacity was developed and experimentally evaluate the performance. The spinach grown in Nam-hae island were used for the experiments and investigated of the heated-air drying characteristics as the inlet amount of raw materials, raw material stirring status, conveying type and drying time. The drying air heated by the energy derived from the steam which is supplied from the incineration plant. The moisture contents of raw materials were measured 85.65%. The inlet flow rate of drying air made a difference as the depth of the raw materials loaded on the drying unit and temperature has showed 108~144℃. The drying speed of the mixed drying more than doubled as that of non mixed drying under the same drying type, inlet amount, drying time and drying air temperature. In each experiment, the drying capacity have showed over 500 kg/hr. A drying efficiency of the ratio of drying consumption energy to input energy was 33.46%, lower than the average of 57.76% for the 157 conventional dryers. Because developed dryer must have a drying time of less than one hour, it is considered that the dry efficiency has been reduced due to the loss of wind volume during drying. If waste heat from incineration plant is used as a direct heat source, the dry air temperature is expected to be at least 160℃, greatly improving the drying capacity.

A Survey on the Break-down and Repair of the Power Tillers in Korea (동력경운기(動力耕耘機) 이용실태(利用實態) 조사분석(調査分析)(II) -고장(故障) 및 수리(修理)에 관(關)하여-)

  • Hong, Jong Ho;Lee, Chai Shik
    • Journal of Biosystems Engineering
    • /
    • v.6 no.1
    • /
    • pp.28-38
    • /
    • 1981
  • A survey has been conducted to investigate the presents of breaks down and repair of power tiller for efficient use. Eight provinces were covered for this study. The results are summarized as follows. A. Frequency of breaks down. 1) Power tiller was breaken down 9.05 times a year and it represents a break down every 39.1 hours of use. High frequency of breaks down was found from the fuel and ignition system. For only these system, the number of breaks down were 2.02 and it represents 23.3% among total breaks down. It was followed by attachments, cylinder system, and traction device. 2) For the power tiller which was more than six years old, breaks down accured 37.7 hours of use and every 38.6 hours for the power tiller which was purchased in less than 2 years. 3) For the kerosene engine power tiller, breaks down occured every 36.8 hours of use, which is a higher value compared with diesel engine power tiller which break down every 42.8 hours of use. The 8HP kerosene engine power tiller showed higher frequency of break down compared with any other horse power tiller. 4) In October, the lowest frequency of break down was found with the value of once for every 51.5 hours of use, and it was followed by the frequency of break down in June. The more hours of use, the less breaks down was found. E. Repair place 1) 45.3% among total breaks down of power tiller was repaired by the owner, and 54.7% was repaired at repair shop. More power tiller were repaired at repair shop than by owner of power tiller. 2) The older the power tiller is, the higher percentage of repairing at the repair shop was found compared with the repairing by the owner. 3) Higher percentage of repairing by the owner was found for the diesel engine power tiller compared with the kerosene engine power tiller. It was 10 HP power tiller for the kerosene power tiller and 8 HP for the diesel engine power tiller. 4) 66.7% among total breaks down of steering device was repaired by the owner. It was the highest value compared with the percentage of repairing of any other parts of power tiller. The lowest percentage of repairing by owner was found for the attachments to the power tiller with the value of 26.5%. C. Cause of break down 1) Among the total breaks down of power tiller, 57.2% is caused by the old parts of power tiller with the value of 5.18 times break down a year and 34.7% was caused by the poor maintenance and over loading. 2) For the power tiller which was purchased in less than two years, more breaks down were caused by poor maintenance in comparison to the old parts of power tiller. 3) For the both 8-10 HP kerosene and diesel engine power tiller, the aspects of breaks down was almost the same. But for the 5 HP power tiller, more breaks down was caused by over loading in comparison to the old parts of power tiller. 4) For the cylinder system and traction device, most of the breaks down was caused by the old parts and for the fuel and ignition system, breaks down was caused mainly by the poor maintenance. D. Repair Cost 1) For each power tiller, repair cost was 34,509 won a year and it was 97 won for one hoar operation. 2) Repair cost of kerosene engine power tiller was 40,697 won a year, and it use 28,320 won for a diesel engine power tiller. 3) Average repair cost for one hour operation of kerosene engine power tiller was 103 won, and 86 won for a diesel engine power tiller. No differences were found between the horse power of engines. 4) Annual repair cost of cylinder system was 13,036 won which is the highest one compared with the repair cost of any other parts 362 won a year was required to repair the steering device, and it was the least among repair cost of parts. 5) Average cost for repairing the power tiller one time was 3,183 won. It was 10,598 won for a cylinder system and 1,006 won for a steering device of power tiller. E. Time requirement for repairing by owner. 1) Average time requirements for repairing the break down of a power tiller by owner himself was 8.36 hours, power tiller could not be used for operation for 93.58 hours a year due to the break down. 2) 21.3 hours were required for repairing by owner himself the break down of a power tiller which was more than 6 years old. This value is the highest one compared with the repairing time of power tiller which were purchased in different years. Due to the break down of the power tiller, it could not be used for operation annually 127.13 hours. 3) 10.66 hours were required for repairing by the owner himself a break down of a diesel engine power tiller and 6.48 hours for kerosene engine power tiller could not be used annually 99.14 hours for operation due to the break down and it was 88.67 hour for the diesel engine power tiller. 4) For both diesel and kerosene engine power tiller 8 HP power tiller required the least time for repairing by owner himself a break down compared with any other horse power tiller. It was 2.78 hours for kerosene engine power tiller and 8.25 hours fur diesel engine power tiller. 5) For the cylinder system of power tiller 32.02 hours were required for repairing a break down by the owner himself. Power tiller could not be used 39.30 hours a year due to the break down of the cylinder system.

  • PDF