• Title/Summary/Keyword: 연결체

Search Result 1,244, Processing Time 0.028 seconds

Study on the Performance of New Shear Resistance Connecting Structure of Precast Member (프리캐스트 부재의 새로운 전단저항 연결체의 성능에 관한 연구)

  • Kim, Tae-Hoon;Jin, Byeong-Moo;Kim, Young-Jin;Kim, Seong-Woon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.1A
    • /
    • pp.147-154
    • /
    • 2008
  • The purpose of this study is to critically evaluate the structural performance of an innovative new shear resistance connecting structure of precast member. Joints such as shear resistance connecting structure require special attention when designing and constructing precast segmental structures. An experimental and analytical study was conducted to quantify performance measures and examine one aspect of detailing for developed shear resistance connecting structure. A computer program, named RCAHEST (Reinforced Concrete Analysis in Higher Evaluation System Technology), for the analysis of reinforced concrete structures was used. A joint element is used to predict the inelastic behavior of the joints between segmental members. Future work by the authors will do a model test of precast segmental prestressed concrete bridge columns with this shear resistance connecting structure, and examined both the structural behavior and seismic performance.

Optimization of the Coupling and the Reflector Material in the DOI PET Detector Module using the WLS Fiber (파장변이섬유를 사용하는 반응 위치 측정 양전자방출 단층촬영기기 검출기 모듈의 연결물질과 반사체 물질의 최적화)

  • Lee, Seung-Jae
    • Journal of the Korean Society of Radiology
    • /
    • v.13 no.1
    • /
    • pp.15-20
    • /
    • 2019
  • We developed a novel depth-of-interaction positron emission tomography (PET) detector using wavelength shifting (WLS) fibers and optimized it. The optimization module was designed by using two scintillators and three WLS fibers and attaching a sensor to the end of the WLS fiber. Optimum combinations were obtained through the light collection efficiency and the light collection ratio between sensors depending on coupling materials and reflectors of scintillators, WLS fibers and sensors. The highest light collection efficiency and the light collection ratio between sensors were obtained in the combination of the epoxy (coupling materials)-diffuse reflector (scintillators)-specular reflector (WLS fibers).

Study on the Seismic Behavior of Precast Concrete Segmental Bridge Piers with Shear Resistance Connecting Structure (전단저항 연결체를 갖는 프리캐스트 세그먼트 교각의 지진거동에 관한 연구)

  • Kim, Tae-Hoon;Kim, Young-Jin;Kim, Seong-Woon;Kim, Chul-Young;Shin, Hyun-Mock
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.85-88
    • /
    • 2008
  • The purpose of this study was to investigate the seismic behavior of precast concrete segmental bridge piers with shear resistance connecting structure. A model of precast concrete segmental bridge columns with shear resistance connecting structure was tested under a constant axial load and a cyclically reversed horizontal load. A computer program, RCAHEST (Reinforced Concrete Analysis in Higher Evaluation System Technology), for the analysis of reinforced concrete structures was used. The proposed numerical method for the seismic behavior of precast concrete segmental bridge piers with shear resistance connecting structure is verified by comparison with reliable experimental results.

  • PDF

우주발사체 개발을 위한 발사대 케이블마스트(CABLE MAST) 사례조사

  • Lee, Jeong-Ho;Lee, Yeong-Ho;Kim, Yong-Uk;O, Seung-Hyeop
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.37 no.2
    • /
    • pp.152.2-152.2
    • /
    • 2012
  • 우주발사체 발사를 위해서는 발사대시스템 개발이 필수적이다. 발사대시스템은 기계설비와 추진제공급설비, 관제설비로 구성되며, 그 중 기계설비는 발사지지대(Launch Pad), 이렉터(Erector), 트랜스포터이렉터(Transport-Erector), 케이블마스트(Cable-mast), 자동체결장치(Auto-coupling Device) 총 다섯 부분으로 나눌 수 있다. 발사지지대는 발사 전까지 발사체를 지지하는 구조물로 발사체의 안전을 보장하고 공급배관 및 통신라인의 경로를 제공한다. 이렉터는 발사준비과정에서 수평으로 이송된 발사체를 2개의 대형 유압실린더를 사용하여 기립시키는 장비로 발사 취소 시 발사체를 수평으로 전환한다. 트랜스포터이렉터는 조립공간에서 조립을 마치고 최종점검이 완료된 발사체를 전용차량을 이용하여 발사대로 이동하고 발사체를 안전하게 잡아준다. 자동체결장치는 지상으로부터 발사체로 연결되는 추진제, 압축가스 등의 연결배관을 자동으로 연결/분리하는 장치이다. 케이블마스트는 우주발사체 상단부의 UCU-E(Umbilical Connectors Unit-Electrical)를 통해서 전기, 고압가스, 고온공기 등을 공급하기 위한 통로로 발사 전까지 발사체시스템과 지상장비와의 통신수단이다. 또한 발사체로 연결되는 라인들을 발사 시에 나오는 후류에 의한 충격으로부터 보호하고, UCU-E가 기계적으로 분리되도록 구성되어 있다. 본 논문은 기존에 적용된 케이블마스트에 대한 구성, 기능 및 운용절차에 관한 것으로, 현재 진행 중인 한국형발사체 개발을 위한 기초 자료조사로 활용하고자 한다.

  • PDF

Behaviors of Joints with Perfobond Rib Shear Connectors in Steel-PSC Hybrid System (Perfobond Rib을 적용한 강-PSC 혼합구조 연결부의 거동 평가)

  • Kim, Sang Hyo;Lee, Chan Goo;Yoon, Ji Hyun;Won, Jeong Hun
    • Journal of Korean Society of Steel Construction
    • /
    • v.21 no.6
    • /
    • pp.647-657
    • /
    • 2009
  • This paper studies the behavior of joints in steel-PSC (prestressed concrete) hybrid beams, which is necessary for the application of hybrid beams to spliced girder bridges, and proposes a new type of joint with improved construction convenience and structural behavior. In the proposed joint, perfobond rib shear connectors are attached to the upper and lower plates, which are expanded from the steel girders and located between the steel girder and the PSC girder. The experimental tests were performed on hybrid beams with the suggested joint. The results showed that all the beams had similar ultimate strengths and failure modes, due to the failure of their PSC parts. The composite action of the perfobond ribs was verified by examining the initial stiffness and cracks of the test beams. In addition, the test beams showed a higher degree of ultimate strength than the beams with stud shear connectors in the joints that had been previously studied. Thus, the proposed joint is effective for the steel-PSC hybrid beam.

Experimental Performance Evaluation of Complex Behavior Connector by Scaled Model (축소모형에 의한 복합거동 연결체의 실험적 성능 평가)

  • Kim, Kisung;Kang, Hyounhoi;Park, Jeongjun
    • Journal of the Society of Disaster Information
    • /
    • v.13 no.2
    • /
    • pp.130-138
    • /
    • 2017
  • The connector of the complex behavior is to connect the individual piles of the pile to the lower foundation of the oil sand plant where the floating foundation is used. In this study, to verify the shape of a connector of the complex behavior for applying the advantages of existing group pile and piled raft foundation to an oil sand plant, a scaled model was constructed to measure the behavior of the load.

Resistance Increasing Factor of Connected-pile Foundation for Transmission Tower in Clay (점토지반에 근입된 송전철탑 연결형 말뚝기초의 저항력증가계수)

  • Kyung, Doo-Hyun;Lee, Jun-Hwan;Paik, Kyu-Ho;Kim, Dae-Hong
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.8
    • /
    • pp.31-41
    • /
    • 2012
  • Pile foundation for transmission tower constructed in weak ground can cause the damage of the tower due to the different settlement between the foundations. In Japan and USA, connected-pile foundations whose 4 foundations are connected each other by beams were used for transmission tower (TEPCO 1988, IEEE 2001). Resistance increasing factors for connected-pile foundation signify increasing amount of resistance due to the effect of connected-pile material. In this study, we performed model lateral load tests of connected-pile foundations for transmission tower and found the resistance increasing factors for connected-pile foundation. The tests were performed in silty clay, and the resistance increasing factors were founded in various conditions that lateral load directions and height, the stiffness of beams in the connected-pile foundations were changed. The resistance increasing factors from our research were presented as a function of normal lateral loading height and normal stiffness of the connected-pile material. The resistances which were estimated from the resistance increasing factors were similar to measured values.

프리캐스트 콘크리트 접합부의 강도특성실험

  • Yang, In-Hwan;Kim, Gyeong-Cheol;Ju, Geon-Hyeong
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2011.11a
    • /
    • pp.133-135
    • /
    • 2011
  • 플로팅 건축구조용 콘크리트 부유체 구조는 현장 근처의 제작장에서 제작한 후에 제작된 부재를 현장으로 이동하여 가설장비를 이용해 각 부재를 조립해서 부유체 구조를 완성하는 방법인 프리캐스트 부재 방법을 적용하는 것이 유리하다. 따라서, 연결부의 기능과 구조적 성능을 최대한으로 유지시킬 수 있는 적절한 연결기법을 적용해야 한다. 본 연구에서는 콘크리트 부유체 연결부의 강도특성연구를 수행하였다.

  • PDF

A Methodology to Formulate Stochastic Continuum Model from Discrete Fracture Network Model and Analysis of Compatibility between two Models (개별균열 연결망 모델에 근거한 추계적 연속체 모델의 구성기법과 두 모델간의 적합성 분석)

  • 장근무;이은용;박주완;김창락;박희영
    • Tunnel and Underground Space
    • /
    • v.11 no.2
    • /
    • pp.156-166
    • /
    • 2001
  • A stochastic continuum(SC) modeling technique was developed to simulate the groundwater flow pathway in fractured rocks. This model was developed to overcome the disadvantageous points of discrete fracture network(DFN) modes which has the limitation of fracture numbers. Besides, SC model is able to perform probabilistic analysis and to simulate the conductive groundwater pathway as discrete fracture network model. The SC model was formulated based on the discrete fracture network(DFN) model. The spatial distribution of permeability in the stochastic continuum model was defined by the probability distribution and variogram functions defined from the permeabilities of subdivided smaller blocks of the DFN model. The analysis of groundwater travel time was performed to show the consistency between DFN and SC models by the numerical experiment. It was found that the stochastic continuum modes was an appropriate way to provide the probability density distribution of groundwater velocity which is required for the probabilistic safety assessment of a radioactive waste disposal facility.

  • PDF

Performance Assessment of Precast Concrete Segmental Bridge Columns with Shear Resistance Connecting Structure (전단저항 연결체를 갖는 프리캐스트 세그먼트 교각의 성능평가)

  • Kim, Tae-Hoon;Kim, Young-Jin;Kim, Seong-Woon;Shin, Hyun-Mock
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.4A
    • /
    • pp.591-601
    • /
    • 2008
  • The purpose of this study was to investigate the performance of precast concrete segmental bridge columns with shear resistance connecting structure. The system can reduce work at a construction site and makes construction periods shorter. A model of precast concrete segmental bridge columns with shear resistance connecting structure was tested under a constant axial load and a cyclically reversed horizontal load. A computer program, RCAHEST (Reinforced Concrete Analysis in Higher Evaluation System Technology), for the analysis of reinforced concrete structures was used. An bonded or unbonded tendon element based on the finite element method, that can represent the interaction between tendon and concrete of prestressed concrete member, is used. A joint element is newly modified to predict the inelastic behaviors of segmental joints. The proposed numerical method gives a realistic prediction of performance throughout the loading cycles for several test specimens investigated.