• 제목/요약/키워드: 엘리베이터 코어

검색결과 2건 처리시간 0.016초

Top-down 공법 현장에서 엘리베이터 코어월 정밀 시공을 위한 시공 BIM의 적용 사례 연구 (Case Study of the Field-BIM for Precision Construction of Elevator Core Wall in Top-down Project)

  • 심학보;석원균;박순전
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.108-109
    • /
    • 2019
  • Top-down construction is a useful method of utilizing the working space, economic benefits and shorten the construction period. Precision construction of the elevator core is very important for safety of the top-down structure. In this study, the layout system for the field-BIM(Building Information Modeling) was used to precisely construct the elevator core in the basement and the ground. Through the layout system, it was possible to process the construction status, review the design results and construction errors, and confirm whether there is or not within the construction error range for elevator installation.

  • PDF

박물관에 있어서의 수직동선 요소에 대한 기초적 연구 (A Basic Study on the Vertical Circulation Elements in a Museum)

  • 심승현
    • 한국산학기술학회논문지
    • /
    • 제11권10호
    • /
    • pp.3964-3973
    • /
    • 2010
  • 본 연구는 박물관에 있어서 계단, 엘리베이터 등의 수직동선 요소에 대한 분석을 하고자 한다. 연구 방법에 있어 가장 기초 단계라는 의미로 각 요소별의 개수를 분석하여 수치적으로 접근하였다. 공간적 범위를 우리나라로 한정하였다. 연구의 결론은 다음과 같다. 첫째, 수직동선 요소를 가장 많이 지닌 사례는 8개이며, 3~4개가 50%를 차지하였다. 연구 초기에 생각했던 것보다 높은 수치의 사례가 있어 다양한 박물관의 실상을 알 수 있었다. 계단의 경우 5개가 제일 높았으며, 일반적으로는 2개의 계단을 가진 것이었다. 엘리베이터의 경우는 1개를 가진 사례가 79%였다. 경사로는 38개 사례 중 9개의 사례에서만 볼 수 있었으며, 1개를 가진 사례가 66%를 차지하였다. 3개 가진 사례도 있었으며, 앞으로의 건축설계의 추세를 보면 더 많은 경사로를 지닌 사례가 나올 것으로 예측된다. 둘째, 코어의 구성에 있어 계단 단독, 엘리베이터 단독, 경사로 단독, 엘리베이터 + 계단, 계단 + 경사로의 구성을 찾을 수 있었으나 엘리베이터 + 경사로, 엘리베이터 + 계단 + 경사로의 조합은 아직 찾을 수 없었다. 계단 + 경사로의 사례는 단 1개이다. 앞으로 계단 + 경사로, 엘리베이터 + 경사로, 엘리베이터 + 계단 + 경사로의 조합을 이용하여 설계한다면 다양한 모습의 박물관이 나타날 수 있을 것으로 예상된다.