• Title/Summary/Keyword: 엘리베이터 코어

Search Result 2, Processing Time 0.019 seconds

Case Study of the Field-BIM for Precision Construction of Elevator Core Wall in Top-down Project (Top-down 공법 현장에서 엘리베이터 코어월 정밀 시공을 위한 시공 BIM의 적용 사례 연구)

  • Shim, Hak-Bo;Seok, Won-Kyun;Park, Soon-Jeon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.108-109
    • /
    • 2019
  • Top-down construction is a useful method of utilizing the working space, economic benefits and shorten the construction period. Precision construction of the elevator core is very important for safety of the top-down structure. In this study, the layout system for the field-BIM(Building Information Modeling) was used to precisely construct the elevator core in the basement and the ground. Through the layout system, it was possible to process the construction status, review the design results and construction errors, and confirm whether there is or not within the construction error range for elevator installation.

  • PDF

A Basic Study on the Vertical Circulation Elements in a Museum (박물관에 있어서의 수직동선 요소에 대한 기초적 연구)

  • Shim, Seung-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.10
    • /
    • pp.3964-3973
    • /
    • 2010
  • The main purpose of this study is the vertical circulation elements(stairs, elevator, ramp) in a Museum. The first is numerically analyzed in the study. And museum of Korea was limited to the case. The result of the study can be summarized as follows. 1. 50% of cases have 3~4 vertical circulation elements.; (1) ~8 elements: 1(3%), (2) 7 elements: 2(5%), (3) 6 elements: 5(13%), (4) 5 elements: 6(16%), (5) 4 elements: 8(21%), (6) 3 elements: 11(29%), (7) 2 elements: 4(11%), (8) 1 element: 1(3%). 2. There was "stairs alone", "elevator + stairs", "elevator + stairs + ramp", "stairs + ramp" in museum of Korea. Cases of "elevator alone", "ramp alone", elevator + ramp", "stairs + elevator + ramp" was not.; (1) stairs alone: 8(21%), (2) elevator + stairs: 21(55%), (3) elevator + stairs + ramp: 8(21%), (4) stairs + ramp: 1(3%).