• Title/Summary/Keyword: 업무 흐름 관리

Search Result 194, Processing Time 0.024 seconds

A Study on Development of Collecting Historical Manuscripts Management System in the National Institute of Korean History (수집사료 관리시스템 개발에 관한 연구: 국사편찬위원회를 중심으로)

  • Yoon, So-Young
    • Journal of the Korean Society for information Management
    • /
    • v.26 no.1
    • /
    • pp.371-387
    • /
    • 2009
  • National Institute of Korean History(NIKH) is the major collecting organization of manuscripts, records for historical research and develops a Collecting Manuscripts Management System. Manuscripts description conforms to records management system, such as provenance information and hierarchical catalog records and business process observes library management system because it is not the public records. Goal system is integrated system containing both. This study proposes development of Collecting Historical Manuscripts Management System in the NIKH and the aspects to achieve successful system operation.

Earned Value based Construction Project Control System (Earned Value 기반 프로젝트 관리체계 및 사례연구)

  • Lee Yoo-Seob;Cho Chang-Yon;Oh Kyu-Hoan;Kim Jung-Hun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.123-130
    • /
    • 2002
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

  • PDF

Earned Value based Construction Project Control System (EV기반 공사관리시스템 기능의 비교분석 연구)

  • Lee Yoo-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.168-174
    • /
    • 2004
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

A Study on the Development of the System for the Road Occupation Permit Information Management (도로점용허가 정보관리를 위한 도로점용시스템 개발에 관한 연구)

  • Kim, Young-Jin;Kim, Byung-Kon;Jeong, Seong-Yun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.12
    • /
    • pp.6495-6503
    • /
    • 2013
  • This paper presents a study on the development of a web-based system for the road occupation permit information management. For the development of this system, the survey of information system related to a road occupation permit, an analysis of road occupation business process, the definition of the road occupation permit data, the development of the system, and the application of the system to the work-related to road occupation permit were conducted consecutively. In an analysis of the road occupation business process, the statutes, such as the road act were investigated, work examples of the road management agent were reviewed, and a survey targeting staff and citizens was carried out. The information classification code to represent the attributes of the data was developed to manage the information in each road occupation permit process, and the metadata was defined considering the hierarchy relationship of the information. The road occupation and access system was developed based on the information classification code and metadata to reflect the user requirements. The System was applied to the Regional Construction and Management Administration and Branch Office belonging to the Ministry of Land, Infrastructure and Transport Affairs. By replacing the business process based on paper documents to the business process based on the information system, it is expected that the service of the civil petition be upgraded and the business process of the road occupation permit be reformed.

A Sutdy on the development method of Construction Productivity analysis system based on Web & OLAP (웹(Web) 및 OLAP 기반의 건설 생산성 분석 시스템 개발방안 연구)

  • Lee, Jeong-Dae;Kim, Sang-Bum;Kim, Yae-Sang;Kim, Young-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.306-311
    • /
    • 2007
  • Proper management of construction productivity is one of the main drivers of project success. This research focuses on the development of a construction productivity analysis system based on Web and OLAP in order to effectively manage construction productivity. Throughout the research effort, a construction productivity analysis system was modeled using IDEFO & ERD techniques and was deployed on the WWW(World Wide Web). Based on the system modeling, this research studies the methodology for system development of construction productivity that can consult the decision of managers on job site.

  • PDF

A Study on Estimating Scour Safety of Levee for Effective River Management (효율적 하천관리를 위한 하천제방 세굴안전도 산정에 관한 연구)

  • Kim, Sooyoung;Yoon, Kwang Seok
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.483-483
    • /
    • 2017
  • 하천제방의 설계 시 침식 및 세굴에 대한 보호를 위해 호안을 설치하도록 하고 있으나 확실한 설계기준이 없는 실정이며 호안이 설치된 이후에도 호안에 대한 관리나 안전성 검사가 수행되지 않고 있다. 홍수로 인해 제방이나 호안의 손실이 발생하면 피해복구를 실시하는 수준에서 하천의 제방관리가 이뤄지고 있다. 따라서 본 연구에서는 하천흐름에 대한 호안의 안전도를 산정하여 도상에 표시해 제방의 유지관리에 활용할 수 있는 세굴안전도맵을 제시하였다. 세굴안전도는 호안의 형식별로 하천흐름에 대한 외력과 호안자체의 저항을 나타내는 내력을 비로 산정하였으며 매우안전, 안전, 보통, 위험, 매우위험의 5단계로 평가하였다. 남강유역을 시범유역으로 하여 남강댐 하류부터 낙동강 합류부까지의 모든 제방에 대해서 안전도를 평가하였다. 우선적으로 현장조사를 통해 제방호안에 대한 설계도서와 현장시공결과를 비교하였으며 호안의 확인이 어렵거나 호안설치가 되지 않는 제방에 대해서는 무호안 또는 식생호안으로 가정하였다. 산정된 하천제방 세굴안전도를 GIS를 활용하여 맵으로 도시한 결과 만곡부 또는 합류부에서의 세굴안전도가 낮게 평가되는 것으로 나타났다. 본 연구를 통해 산정된 하천제방 세굴안전도 맵을 하천관리에 활용한다면 직관적으로 위험제방에 대한 파악이 가능하고 투자우선순위를 결정하는데 기초자료로 활용되어 하천관리 업무의 효율성을 높일 수 있을 것으로 기대된다.

  • PDF

A Study on Development of Electronic Performance Support System Prototype for Improving the Efficiency of Quality Inspection of Temporary Work (가설공사 품질점검 업무효율 향상을 위한 전자작업지원시스템(EPSS) 프로토타입 개발에 관한 연구)

  • Yoon, Soo-Ho;Choi, Chang-Hoon;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.13-27
    • /
    • 2019
  • While temporary construction work applies to a temporary facility, it has a high use frequency during the construction period accounting for around 10% of the construction cost, it requires systematic management. However, construction inspection information of temporary construction work often has no special specification in the design documents and specification items, with the items on various standards also being formidable. Because of this, related inspection are likely to be performed inefficiently with a high probability for occurrence of human errors when quality inspection is conducted for the temporary construction work. In the present study, therefore, apply to the electronic operation support system capable of supporting implementation of inspection of providing related information for the contemporary construction work. To achieve this, a prototype is developed by using IDEF0 to identify information flow by process and organizing EPSS-based quality inspection Task. And then, efficiency of the quality inspection and information accessibility for temporary construction work are to be improved by verification method of Sample Project.

Projection of Activity Duration Utilizing Historical Cost Data (자원투입 비용을 고려한 공정관리 작업기간 산정)

  • Moon, Sung-Woo;Kang, Sang-Rae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.444-447
    • /
    • 2006
  • Construction managers need to pay a close attention to the resource utilization in order to deliver the construction project successfully. Construction scheduling is crucial for resource control in that it provides information when and how much to bring down work force to sites. In scheduling, activity duration is projected based on the productivity of historical data or the intuition of scheduler. This paper studies the opportunity of applying cost-based productivity for estimating activity duration. For cost-based productivity, the cost of resource is used as an input and the work quantities as an output. Out of historical data, regression model has been developed to understand the validity of applying cost-based productivity in projecting activity duration. The result of study will work as a prerequisite for implementing the environment of database-based construction scheduling.

  • PDF

Debate about Control Self-Assessment Model for e-Business System Safeguard (e-Business 시스템 안전성확보를 위한 자가통제평가 모델에 관한 연구)

  • Seo Jang-Hoon
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.5
    • /
    • pp.135-153
    • /
    • 2005
  • 자가통제평가(CSA : Control Self Assessment)는 핵심사업 목적을 달성하는데 개입되는 위험 그리고 그러한 사업위험을 관리하기 위하여 설계된 내부통제를 공식적이고 문서화된 협력적 프로세스에 의하여 검토하기 위하여 사용되는 방법론이다. 현재 많은 기업에서 효과적인 조직통제와 비즈니스 프로세스 개선을 위하여 전문 감사인과 경영인들이 기업지배구조 조직의 강력한 위험관리 도구로서 자가통제평가의 필요성을 강조하고 있다. 자가통제평가는 해당 조직의 담당부서나 팀에서 내부통제평가를 통하여 내부통제상의 재무보고, 준법, 사업 및 운영상의 효율성 등을 확보하기 위해서 설치되며, 효과적인 모니터 장치로서 기업지배구조상의 업무 프로세스를 정비하고 업무에서 발생하는 제반 정보의 흐름을 원활하게 해서 조직에게 손해가 발생할 수 있는 여러 가지 위험으로부터 회사를 사전에 차단하는 기능을 한다. 이러한 부분에서 효과적인 자가통제평가 시스템을 구축하는 것이 중요할 것이다. 본 연구에서는 e-Business 관련 기업지배구조의 안전성을 확보하기 위한 자가통제평가 모델에 대한 개발 필요성과 관련 자가통제평가 세가지 기본 모델들을 통하여 장단점을 제시하고, 자가통제평가 모델의 필요성을 논의하였다.

항만물류산업의 공급사슬관리(SCM)를 위한 통합데이터베이스 구축

  • 최형림;김현수;박남규;이현철
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 2001.06a
    • /
    • pp.455-461
    • /
    • 2001
  • 본 논문에서는 우리나라 항만물류산업에서의 정보흐름을 일련의 Supply Chain으로 정의하고, 화주, 선사, 운송사 등과 같은 수출입관련업체가 수출입 EDI문서를 해당기관의 시스템으로 신고하는 과정에서 발생할 수 있는 문제점들을 살펴보고 이를 극복할 수 있는 방안을 제시하였다. 항만물류관련 업체들은 수출입절차에 따라 각 기관의 EDI시스템을 이용하여 입출항 및 통관수속업무를 처리하고 있다. 하지만 항만물류관련 기판의 정보시스템은 각각 독자적으로 운영되어, 이를 이용하는 사용자들은 동일한 데이터를 이중으로 처리해야하는 문제점을 가지고 있다. 본 논문에서는 이러한 문제점들을 해결하고 다양한 항만물류관련 기관의 정보시스템을 통합·관리하기 위한 통합데이터베이스의 구축방안과, 업무주체간 정보의 공유 및 교환을 위한 IDC(Internet Data Center)의 역할을 제시하였다.

  • PDF