• Title/Summary/Keyword: 업무중요도

Search Result 301, Processing Time 0.027 seconds

A Study on the Development of Evaluation Criteria in the Business Continuity Management System(Focusing on the 'Understanding the organization' in Plan of the ISO 22301) (업무연속성관리체계(BCMS) 평가지표 개발에 관한 연구(ISO 22301 Plan의 '조직의 이해'를 중심으로))

  • YoungKyun Jung;ChongSoo Cheung
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.2
    • /
    • pp.363-371
    • /
    • 2023
  • Purpose: This paper aims to develop evaluation criteria of Plan- 'Understanding the Organization' in the PDCA(Plan-Do-Check-Act) requirements of ISO 22301 which is a global standard in the area of BCMS(Business Continuity Management System). Method: The group of 20 experts in the BCMS checked for the validity of the evaluation criteria of Plan- 'Understanding the Organization' by the modified Delphi technique and relative importance are surveyed by the group. Results: As a result, the 12 evaluation criteria with relative importance that can be applied for BCMS evaluation of the organizations are developed and proposed. Conclusion: In order to introduce a quantitive evaluation in the BCMS, it was concluded that evaluation criteria need to be chosen and given relative importance, thus the criteria with the importance could be used for effective evaluation

Analysis of the Impact of Construction Planning Tasks on Project Cost and Schedule Success in Residential Projects (공동주택 설비공사 계획업무의 성과지표에 미치는 영향분석)

  • Kim, Dae Young;Lim, Hyoungchul;Kim, Daeyoung;Huh, Youngki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.31-38
    • /
    • 2019
  • The main purpose of this study is to analyze the impact of the cost estimates on the construction work in residential apartment housing facilities. The planning work of facility construction is roughly divided into five main tasks which are further broken down into the following: process plan (P1-P6), construction plan (C1-C5), environmental management plan (E1-E4), quality management plan (Q1-Q5) and the safety management plan (S1-S5). In this study these tasks were classified into 25 detailed planning duties and a statistical analysis was performed on each one to determine its impact on cost. Finally this study derives from major planning tasks for effective cost management through correlation between planning tasks, cost indicators and t-test.

An Analysis of Construction Execution Tasks for Successful Residential Mechanical Projects (프로젝트 성공을 위한 효과적인 시공업무 및 영향 분석 - 아파트 설비공사를 중심으로 -)

  • Kang, Sang-Hun;Kim, Dae Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.60-67
    • /
    • 2019
  • The main purpose of this study is to identify the tasks performed at the construction stage of apartment houses and analyze the major construction tasks that may affect the performance indicators and analyze the impact on project performance. Based on expert opinions through preliminary research, pilot data, construction database, and other research trends, domestic and foreign research trends are divided into five major tasks, and each is divided into process management (P'1 ~ P'6), construction management (C'1 ~ C'5), environmental management (E'1 ~ E'4), quality control (Q'1 ~ Q'5), safety management (S'1 ~ S'5). Subsequently, each major task was subdivided into 24 detailed tasks. An independent t-test was conducted to analyze the impact on cost. We compared the importance of achieving the project goal and identified the construction work of concrete important construction which affects not only the cost but also the schedule performance index for the degree of significance of less than 0.05.

Comparative analysis of status of safety accidents and importance-performance analysis (IPA) about precautions of safety accidents by employment type of industry foodservices in Jeonbuk area (전북지역 산업체급식소 조리종사자의 고용형태에 따른 안전사고 실태 및 안전사고 예방관리에 대한 중요도와 수행도 분석)

  • So, Hee;Rho, Jeong Ok
    • Journal of Nutrition and Health
    • /
    • v.50 no.4
    • /
    • pp.402-414
    • /
    • 2017
  • Purpose: The purpose of the study was to evaluate the status of safety accidents and importance-performance analysis (IPA) between regular and non-regular employees in industry foodservices. Methods: The participants were regular employees (n = 119) and non-regular employees (n = 163) in industry foodservices in the Jeonbuk area. Demographic characteristics, status of safety accidents, safety education, and importance and performance status were assessed using a self-administered questionnaire. Results: Approximately 66.4% of regular employees and 53.4% of non-regular employees experienced safety accidents (p < 0.05). Types of safety accidents of regular and non-regular employees were mostly burns, and causes were mostly from their own negligence. Approximately 98.3% of regular employees and 95.1% of non-regular employees experienced safety education. Approximately 88.9% of regular employees and 96.8% of non-regular employees received safety education from dietitians. Approximately 41.9% of regular employees and 50.0% of non-regular employees had difficulty applying the contents of safety education due to lack of time during work. As a result of IPA, regular and non-regular employees were aware of the importance of the following and performed them well: 'Clean the floor of the work place', 'Arrange in the work area', 'Wear safety shoes', 'Check for heater cord', and 'Safety cooking when using oil'. On the other hand, they were not aware of the importance of the following and performed them insufficiently: 'Check for the MSDS', 'Aware of chemical signs', 'Wear protection gloves etc.', 'Do stretching exercise', and 'Using ancillary tools'. Conclusion: Therefore, it is necessary to improve the consciousness of dietitians for effective application of safety education contents, development of contents, especially MSDS, and related things.

Analysis of Competence Factors Assessment for Specialty Contractors' Employees using IPA (IPA 기법을 활용한 전문건설업체 종사자의 직무별 역량요인 분석)

  • Hong, Sung-Ho;Jung, Dae-Woon;Oh, Chi-Don
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.21-30
    • /
    • 2015
  • Recently, the construction policy is rapidly changing and construction project becomes larger and more complex. Specialty contractors are in charge of the actual construction work, but they are considered to have low competence level. To strengthen competence of specialty contractors' employees, above all, it is essential to evaluate and to analyze the competence factors level for specialty contractors' employees. However, there is no in-depth research on competence factors level for specialty contractors. Therefore, the purpose of this study is to analyze the competence factor in order to find the high priority factor. The result of this study can be utilized for development of effective educational program for enhance specialty contractors' competence.

An Analysis of Core Competence of Pre-construction Service of the Making Inroads into Oversea Construction Market (*for the Entry in the International Construction Business) (해외건설시장 진출을 위한 건설사의 Pre-construction Service 핵심역량 분석)

  • Byun, Il-Woo;Kim, Ye-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.80-90
    • /
    • 2012
  • In 2011, the overall construction markets in KOREA are highly depressed due to decreases in orders of domestic construction markets in both private and public field. Also, we are losing competitive advantages over Chinese and Indian companies owing to the market shares on plant construction projects excessively. It is recognizable, under the circumstances that we are in interior position on high value technique to other advanced countries, that the orders of mega building and plant construction projects tend to be placed through the" Pre-construction Service", the importance of which has been emphasized domestically and internationally in recent time. However, current domestic construction companies show scarcity in understanding the general idea of the Pre-construction Service and fail in building proper structure of it. It is obvious that they cannot have any competent strategy to deal with Pre-construction Service. The Purpose of this paper is to analyze the core competence throughout preconstruction phase and, and make up for the weakness in the current pre-construction service process.

Construction Process based Schedule Risk Management System (공사프로세스기반 공정리스크 관리지원 시스템)

  • Yoon, You-Sang;Suh, Sang-Wook;Park, Moon-Seo;Jang, Myung-Houn
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.101-110
    • /
    • 2008
  • In order to achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, a more effective system should be developed to meet the demands of the industry. The purpose of this study is to develop the effective risk management system for scheduling the construction processes. The study provides a tool that can optimize the management system which would assist managers to identify schedule risks in the planning phase of the project.

Analysis of Risk Factors in Ex-Ante Evaluation of Large-Scale Government R&D Programs (대형 R&D사업 사전평가에서의 위험요인에 대한 인식 분석)

  • Lee, Yoon Been;Yoon, Ji Woong
    • Journal of Korea Technology Innovation Society
    • /
    • v.17 no.2
    • /
    • pp.289-308
    • /
    • 2014
  • We analyze the risk factors identified for ex-ante evaluation regarding government R&D programs. In particular, we empirically examined to what extent each risk factor is perceived to be important by the stage of R&D, technology field, researcher's career and experience. The empirical results show that technology risk is perceive to be less important for basic research, while market risk more perceived to be important in the IT field. Political risk is perceived to be less important for the university faculty, while researchers with government R&D project experience gave more value to legal risk factor.

Analysis of the Extent of National Forest-official's Recognition on the National Forest Management System (국유림 경영제도에 대한 업무담당자의 인식정도에 관한 연구)

  • Park, Kyung Seok;Lee, Seong Youn;Choi, Soo Im;Moon, Guen Young;Jeong, Se Myong;An, Ki Wan
    • Journal of Korean Society of Forest Science
    • /
    • v.98 no.4
    • /
    • pp.479-490
    • /
    • 2009
  • This research was carried out to understand the actual condition of Forest Management Agency System, Cooperative Forest Program and People's Forest Program with Public Participation and to boost the program. To carry out a quantitative survey among selected 5 Regional Forest Service and 27 National Forest Office, we investigated the activity-awareness concepts of officers on Importance, Performance, and problems of program. As a results, the difference of understanding on National Forest Management System involved with the results of agreement achieved. Also most serious problem of Forest Management Agency System were the shortage of participation will and the limitation of security benefit. The prime reason for the program problem is lack of investment in People's Forest Program. The final results on survey of National Forest Management System with the Importance and Performance as followed. It indicated that I(Keep Up Good Work) have 5 Factors, II(Concentrate Here) have 2 Factors, III(Low Priority) have 6 Factors, and IV(Possible Overkill) have 2 Factors. Base on above investigation, we finally suggest that new organization exclusive responsible for the improvement of management and encouragement of Build Transfer Operate.

An Analysis of Competency at Each Phase of PMC for Overseas Architecture Project Using the IPA (IPA를 활용한 해외 건축 사업 PMC 분야 단계별 업무역량 분석)

  • Ha, Sung-Wook;Lee, Suk-Won;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.59-67
    • /
    • 2015
  • Overseas expansion of domestic construction over the past 10 years has been fast growing. But as a result of simple construction business practices and a focus on EPC, sales margins was reduced. Domestic construction companies have been trying to redirect business to high-value-added-areas but have faced difficulty because there areas are current monopolized by global leading companies in the field of PMC. They have recently carried out 16 PMC related project in order to expand their experience and increase their competitiveness. Most of these construction companies that do PMC overseas have been focusing on the civil engineering sector. analyzing the important and performance result 50 separate PMC tasks in detail using IPA, it became clear that domestic construction companies should also focus on tasks and were analyzed in order to advance to overseas architecture PMC sector overseas. There are large gaps in the importance and performance result of both the planning and pre-construction phase. Importance compared to the current performance levels in the planning phase gap is largest, pre-construction phase has been analyzed in the following order. In particular, one should strengthen detailed tasks in the planing phase. This study is expected to be used as a basic to determine the performance level and tasks items. It is expected strengthen the capacities of domestic companies in the PMC field, for especially in the high value-aded-areas as indicated in the results of the analysis from this study.