• Title/Summary/Keyword: 언클램핑

Search Result 2, Processing Time 0.021 seconds

A Study on the Decrease of the Unclamping time using Hydraulic Circuit (유압 회로를 이용한 초고속 스핀들의 언클램핑(unclamping) 시간 저감 방안 연구)

  • Chung W.J.;Lee C.M.;Cho Y.D.;Whang Y.K.;Chung D.W.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.06a
    • /
    • pp.1745-1748
    • /
    • 2005
  • According to the demand of the high productivity, the interest of manufacturing skills is growing in industrial society. Especially the high speed spindle in machining center becomes important these days. The exchange time of the tool in machining center usually calls T-T(tool to tool) time. Detailly explaning, It is influenced by the unclamping time. Affecting factors of the unclamping time are various(the hydraulic system, drawbar mass, a flow meter, disc spring, a piston diameter, pipe diameters, and so on). In this study, we could find factors that decrease the unclamping time and verify it for softwares.(AMESim $4.0^{(R)}$ & visual Nastran $4D^{(R)}$)

  • PDF

A Study on the Reduction of Unclamping Time by Design of Experiments (실험계획법을 이용한 초고속 스핀들의 언클램핑 (unclamping) 시간 저감에 대한 최적 조건에 관한 연구)

  • Chung, Won-Jee;Cho, Young-Duk;Lee, Choon-Man;Jung, Dong-Won;Song, Tae-Jin
    • Transactions of the Korean Society of Machine Tool Engineers
    • /
    • v.15 no.3
    • /
    • pp.1-7
    • /
    • 2006
  • By the reason of increased demand of high productivity, the researches on manufacturing process and equipments for reducing cycle time have been made in many directions of a machine tool industries. Especially high productivity is very important to machining center with high-speed spindle. This paper proposed method of reducing T-T(tool to tool) time which results in shorter unclamping time. T-T time varies as factors such as a hydraulic system, a drawbar mass, a flow meter, a disc spring, piston and pipe diameters. In this paper We could find design factors has much influence on decreasing the unclamping time using DOE(Design of Experiment) and optimized the level of the factors using AMESim $4.0^{(R)}$ and visualNastran $4D^{(R)}$ Finally, we have verified improved result of the optimized factors with initial design.