Development of the Pilot Type Machine for Automation of PHC Pile Cutting Work (PHC 파일 두부정리 자동화를 위한 파일롯타입 장비의 개발)

  • Lee Jeong-Ho;Park Sang-Jun;Jeong Myung-Hoon;Kim Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.173-181
    • /
    • 2003
  • During the last few years, the use of Pre-tensioned spun high strength concrete piles(PHC pile) has been gradually increased in many construction sites. Cutting work of the concrete pile is an important task to crush a part of pile head which is compressed with more than 800$\cal{kg}f/cm^2$. It is usually performed by a crusher and three to four skilled workers. Recent analysis results of the pile cutting work reveal that it frequently makes a lot of cracks which significantly reduce the strength of the pile and is labor-intensive work. The primary objective of this study is to propose conceptual designs for developing an automated pile cutting machine. It is anticipated that the development of the automated pile cutting machine would be able to bring improvements in safety, productivity, quality as well as cost saving.

A Study on Vibration Analysis During the Slab Dismantling Using the Mechanical Dismantling Method (기계식 해체 공법을 적용한 슬래브 해체 시 발생하는 진동 해석 연구)

  • Noh, You-Song;Suk, Chul-Gi;Park, Hoon
    • Explosives and Blasting
    • /
    • v.39 no.4
    • /
    • pp.1-11
    • /
    • 2021
  • In this study, the vibration data were obtained to analyze the vibration generated during dismantling of slab using the mechanical dismantling method. The obtained vibration data were classified according to the attachment device and then the waveform and dominant frequency analysis were performed. And the correlation was analyzed by the different methods of measuring the distance between the work section and the measurement point. As a result of the waveform analysis for each attachment device, there was little change in the phase of the vibration waveform and only the change in amplitude, which is the magnitude of the vibration velocity. And as a result of frequency analysis, the frequency band was lower when using a crusher method than a braker method and frequency band were close of the natural frequency of the structure to be dismantled. As a result of the correlation analysis, the separation distance was estimated a higher correlation when evaluated as the path through which the vibration propagates along the structure frame than the straight distance between the measurement point and the working section.