• Title/Summary/Keyword: 실측 터널천단침하

Search Result 2, Processing Time 0.023 seconds

Application for Prediction of Crown Settlements Using RMR in Weathering Rock Tunnels (RMR을 이용한 풍화암 터널의 천단침하량 예측 평가)

  • Kim, Young-Su;Kim, Dae-Man
    • Journal of the Korean Geotechnical Society
    • /
    • v.25 no.10
    • /
    • pp.67-76
    • /
    • 2009
  • Statistical analysis was performed using a series of data on RMR, RMR* and crown settlements collected from sites of weathering rock tunnels in Korea. The crown settlements were predicted by recurrence analysis, exponential function, and artificial neural network (ANN) using collected in-situ data. The result of the prediction fitted well compared to the measured settlement in the order of ANN, exponential function, and recurrence analysis. The range of crown settlement predicted by recurrence analysis widely scattered and promised larger settlement than the measured. Also in all method, the predicted value by RMR well matched compared to the measured settlement predicted by RMR*.

Forecasting Final Displacement With Displacement Functions Using Deformation Measurements While Constructing a Tunnel (계측치와 변위함수에 의한 시공 중인 터널의 최종변위 예측)

  • Kim, Chee-Hwan
    • Tunnel and Underground Space
    • /
    • v.20 no.6
    • /
    • pp.408-420
    • /
    • 2010
  • It is important to forecast the final deformation of a tunnel during construction for evaluating its mechanical stability. In this study, the final deformation of a tunnel is forecasted by fitting tunnel deformations measured while excavating to a displacement function and exterpolating it. The tunnel for the study was built in two stages divided into an upper and a lower part. During the lower part construction of the tunnel, the displacement function forecasts the final incremental displacement well compared to the increment measured after completion of the tunnel. It is because the critical initial displacement occurred on passing the measurement pins can be adequately measured during excavating the lower part, which can not be measured during the upper part excavation of the tunnel.