• Title/Summary/Keyword: 실물대 모형

Search Result 25, Processing Time 0.026 seconds

Relationship between Baltic Dry Index and Crude Oil Market (발틱 운임지수와 원유시장 간의 상호관련성)

  • Choi, Ki-Hong;Kim, Dong-Yoon
    • Journal of Korea Port Economic Association
    • /
    • v.34 no.4
    • /
    • pp.125-140
    • /
    • 2018
  • This study uses daily price data on three major types of crude oil (Brent, Dubai, and WTI) and BDI from January 2, 2009 to June 29, 2018, to compare the relationship between crude oil prices and BDI for rate of change and volatility. Unlike previous studies, the correlation between BDI and crude oil prices was analyzed both the rate of change and variability, VARs, Granger Causality Test, and the GARCH and DCC models were employed. The correlation analysis, indicated that the crude oil price change rate and volatility affect the BDI change rate and that BDI volatility affects the crude oil price change rate and volatility. The relationship between oil prices and BDI is identified, but their correlation is low, which is likely a result of lower dependence on crude oil as demand for natural gas increases worldwide and demand for renewable energy decreases. These trends could result in lower correlations over time. Therefore, focusing on the changing demand for raw materials in future investments in international shipping(real economy) and oil markets and macroeconomic analysis is necessary.

Development of the Automatic Fishing System for the Anchovy Scoop nets (I) - The hydraulic winder device for the boom control - (멸치초망 어업의 조업자동화 시스템 개발 (I) -챗대 조작용 유압 권양기 개발-)

  • 박성욱;배봉성;서두옥
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.36 no.3
    • /
    • pp.166-174
    • /
    • 2000
  • Anchovy, EngrauEis japonica scoop nets are used in the coastal of Southern and Cheju of Korea. Especially in the Cheju, the fishing gear of scoop nets consists of upper boom, lower boom, pressing stick and bag net. They are operated by fishing boats of 6 to 10 ton class and 8 persons on board. The booms are controlled by side drum, and the net and pressing stick are hauled by only human power in operating. Therefore this fishery needs to large labor and heavy human power and has much risk. Three kinds of hydraulic winding device which controls two booms was designed and manufactured to reduce heavy labor force of scoop nets, and trial in the sea was carried out to test their performances using the commercial fishing boats of 6 ton class. The proper capacity of hydraulic pump and motor were determined by model test of boom 1/5 scale. The results obtained are as follows, 1. Tension of boom which is being drawn was the strongest and 187.5kgf when the boom's end is in the depth of 4m under the water. 2. The hydraulic motor of the fittest kind of winder has the least leakage per time than the other kinds. 3. In the best type of several winder devices, when the pressure difference was fixed $130kg/^2$ for the safe fishery, the winding velocity of boom line was 2m/sec, is faster 0.48/sec than traditional fishing method and this winder can catch the anchovy of 1.6 tonnage. 4. As a result, the crew were decreased from 8 to 6 and the problem of heavy human power and risk on fishing operation were solved by using the this winder.

  • PDF

A Experimental Study on the Determination of Construction method of Controled Low-strength Material Accelerated Flow Ability Using Surplus Soil for Underground Power Line (지중송전관로용 급결 유동성 뒤채움재의 시공법 설정에 관한 실험적 연구)

  • Oh, Gi-Dae;Kim, Dae Hong
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.3
    • /
    • pp.84-93
    • /
    • 2010
  • Compaction of backfill material of Underground power lines is difficult, especially under pipeline. so it could cause structural problem because of low compaction efficiency. So various methods have been taken to solve the problem and one of them is CLSM(Controled low-strength material accelerated flow ability). But In other countries, these are already in progress for a long time to research and development and recently on practical steps. But, in our country, study for only general structures, not for underground power line structure that is being constructed at night rapidly. In this study, we performed property tests and indoor & outdoor test (3 cases). The tests showed flow ability reached at the limit construction(160 mm) flowability by 9 to 15 minute after starting to mix, and construction buoyant is lowering after placing CLSM by 70 % of theoretical buoyant that is calculated by unit weight of material. In this paper, we performed indoor tests and outdoor tests to estimate mechanical properties and to suggest construction method(using batch plant, setting spacer at 1.8 m and placing at 2m) for CLSM that using surplus soil. And the test showed good results for construction quality, workability and structure safety.

  • PDF

Verification on Debris Reduction Ability of the Sweeper by Real Scale Experiment (실규모 실험검증을 통한 스위퍼의 유송잡물 저감능력 검토)

  • Kim, Sung-Joong;Jung, Do-Joon;Kang, Joon-Gu;Yeo, Hong-Koo;Kim, Jong-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.9
    • /
    • pp.34-44
    • /
    • 2016
  • This study is an experimental study about a facility for preventing the accumulation of floating debris at a bridge by flooding at a small river. Generally, structures installed at a small river are damaged frequently by floating debris during typhoons or localized rainfall events. On the other hand, there is no method available for preventing such damage. The facilities used in other countries to prevent such damage by the accumulation of floating debris include debris fins, deflectors, and sweeper. Among these facilities, the present study was conducted with a sweeper to investigate the damage-reducing capability through a real-scale accumulation experiment. A sweeper was installed in front of a bridge to bypass floating debris by self-rotation so that the floating debris may not be accumulate at the bridge. A small bridge model was prepared in a real-scale for the real-scale experiment. The accumulation reducing capability was compared through an accumulation experiment before and after the sweeper installation depending on the length of the debris and flow conditions. The result showed that the accumulation rate increased with increasing length of the debris or decreasing flow rate. The installation of a sweeper decreased the debris accumulation rate by a minimum of 55% to a maximum of 88% compared to the case without an installed sweeper. The result of the present study showed that the installation of a sweeper at a small river having a high potential of generating floating debris may help secure the stability of a bridge in the case of floating debris accumulation.

Study on the Fire Risk Prediction Assessment due to Deterioration contact of combustible cables in Underground Common Utility Tunnels (지하공동구내 가연성케이블의 열화접촉으로 인한 화재위험성 예측평가)

  • Ko, Jaesun
    • Journal of the Society of Disaster Information
    • /
    • v.11 no.1
    • /
    • pp.135-147
    • /
    • 2015
  • Recent underground common utility tunnels are underground facilities for jointly accommodating more than 2 kinds of air-conditioning and heating facilities, vacuum dust collector, information processing cables as well as electricity, telecommunications, waterworks, city gas, sewerage system required when citizens live their daily lives and facilities responsible for the central function of the country but it is difficult to cope with fire accidents quickly and hard to enter into common utility tunnels to extinguish a fire due to toxic gases and smoke generated when various cables are burnt. Thus, in the event of a fire, not only the nerve center of the country is paralyzed such as significant property damage and loss of communication etc. but citizen inconveniences are caused. Therefore, noticing that most fires break out by a short circuit due to electrical works and degradation contact due to combustible cables as the main causes of fires in domestic and foreign common utility tunnels fire cases that have occurred so far, the purpose of this paper is to scientifically analyze the behavior of a fire by producing the model of actual common utility tunnels and reproducing the fire. A fire experiment was conducted in a state that line type fixed temperature detector, fire door, connection deluge set and ventilation equipment are installed in underground common utility tunnels and transmission power distribution cables are coated with fire proof paints in a certain section and heating pipes are fire proof covered. As a result, in the case of Type II, the maximum temperature was measured as $932^{\circ}C$ and line type fixed temperature detector displayed the fire location exactly in the receiver at a constant temperature. And transmission power distribution cables painted with fire proof paints in a certain section, the case of Type III, were found not to be fire resistant and fire proof covered heating pipes to be fire resistant for about 30 minutes. Also, fire simulation was carried out by entering fire load during a real fire test and as a result, the maximum temperature is $943^{\circ}C$, almost identical with $932^{\circ}C$ during a real fire test. Therefore, it is considered that fire behaviour can be predicted by conducting fire simulation only with common utility tunnels fire load and result values of heat release rate, height of the smoke layer, concentration of O2, CO, CO2 etc. obtained by simulation are determined to be applied as the values during a real fire experiment. In the future, it is expected that more reliable information on domestic underground common utility tunnels fire accidents can be provided and it will contribute to construction and maintenance repair effectively and systematically by analyzing and accumulating experimental data on domestic underground common utility tunnels fire accidents built in this study and fire cases continuously every year and complementing laws and regulations and administration manuals etc.