• Title/Summary/Keyword: 시공실태

Search Result 172, Processing Time 0.022 seconds

A Management Condition of Apartment House and Improvement Strategy of Remodeling (공동주택관리실태 및 리모델링 활성화 방안)

  • 유인근;정동환;윤여완;김천학;양극영
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2004.05a
    • /
    • pp.77-83
    • /
    • 2004
  • Apartment Building remodeling market is now growing centering around non housing building. Unlike non housing building remodeling business, understanding of remodeling demanders accustomed to profit of reconstruction, deficiency of experience performing remodeling project and construction, shortage of will performing remodeling policy and detailed action method are difficulties in performing apartment building remodeling business. Understanding change of remodeling demanders, strong economic incentive by government, construction management paradigm shift from new construction into building life cycle, application of construction method using existing building condition before remodeling and remodeling related industry infrastructure are required to improve this remodeling business circumstances.

  • PDF

A Case Study for Maintenance Management Personnel of Set Building (집합건축물의 유지관리 인원 실태조사)

  • Kim Hyun-Joung;Kim Seung-Jin;Kim Tae-Hui;Kim Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.137-140
    • /
    • 2005
  • In spite of a construction of many set building, the government's set building policies being almost indifferent to the maintenance management of them. Currently the personnel is not enough for maintenance management in set building. Therefore many set building does not become accomplished appropriately. On this paper, the set building policies and a questionnaire are analyzed. The result of questionnaire provides fundamental data of proper staff calculation.

  • PDF

Strategic Plan for Revitalization by Analyzing on Current Status of Public Using Facilities in Rural Village (농촌마을의 공동이용시설 활용실태조사를 통한 재생전략)

  • Bang, Se-Ra;Park, Jun-Mo;Park, Gil-Bum;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.22-23
    • /
    • 2014
  • An infrastructure has been expand with government-initiated series of supporting business in the country rural village. However, there has still been a shortage of it compared to the city. it needs the infra-improvements that making international competitiveness for agricultural competitiveness securing and improving for housing condition. In particular, Public using facilities in rural village are not function as communal identity but life as enjoy culture for farmer. Therefor it is hot-issue that changed rural economy recently is innovated suitable. This study suggests the customized revitalization strategy for the variation of inside and outside of rural communities, after analyzing and classifying on current status of public using facilities in rural village, in chungcheong area.

  • PDF

A Study on the Employment Condition and the Change of the Work Ability for the foreign Labors in Construction Field (건설공사의 외국인 근로자 고용 실태 및 작업능력 변화에 대한 연구)

  • Park, Byung-Joo;You, Seong-Kue;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.7-8
    • /
    • 2011
  • The use of foreign labors was inevitable at the construction site in Korea. Most construction companies are being used them in the workplace due to the cheap labor, but their work ability are insufficient as much as Korean labors. In this paper is expected to confirm the foreign labors' employment conditions and study to analyze the changing of foreign labors' work ability.

  • PDF

Analytic study of 4~10 years Defect Deposite Use State based on Actual Data after moving in apartment complex (4~10년차 실적자료에 근거한 공동주택 하자보수 보증금의 사용실태 분석연구)

  • Seo, Deok-Seok;Jeon, Myeong-Soo;Lee, Eun-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.153-154
    • /
    • 2011
  • In Korea, the apartment supplier should satisfy the apartment residents' demand on the defect repair found in apartment housing by the law of Management of Apartment Complexs. But in the cost of defect repair, not only the actual defect repair cost, but also the cost of residents' complains are contained. So in this analytic study, the actual use state of defect deposite during 4~10 years after moving in are analysed base on actual data of 15 apartment complexes. In this study, about 66% of defect repair deposites are used to actual defect repair and only 34% of defect repair cost are spent to satisfy the demand of apartment residents'.

  • PDF

A Field Study on the Preference in the Construction Management - Focused after construction Stage - (현장관리 업무체계의 실태조사 연구 - 준공 후 업무를 중심으로 -)

  • Lee, Doo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.11a
    • /
    • pp.85-89
    • /
    • 2003
  • With the social demands for tall building, the level of techniques for construction become high and there are various building materials. Also, the construction system become very complicated with the increase of worker. In spite of above facts, the method of construction management depends on the experimental capacity of a construction manager, and there are many unreasonable elements. These elements prevent well-going in construction process. To solve this problem, it is necessary to make a new system of construction management which is adequate for the condition of company and the contents of construction. In this study, the characteristic of production system and the present condition of construction management were investigated with the help of survey. Thus, the new method of construction management which can clear the previous problems was proposed.

  • PDF

Analysis of the Productivity and Indirect Cost Rates Estimation in the Steel Plant (철골 공장가공의 생산성 및 공장간접비율 실태분석)

  • Kim, Kyoung-Won;Ahn, Bang-Ryul;Tae, Yong-Ho;Huh, Young-Ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.333-336
    • /
    • 2012
  • In modern Construction Industry, as accumulation of capital and improvement of technology skills, buildings are becoming higher and more enormous, also the portion of steel works has been increasing. In addition, it is necessary to predict the optimum level of construction cost in a reasonable way. The composition of construction is direct construction cost, indirect construction cost and so on. However, it is not enough to study about indirect construction cost rather than direct construction cost. In this study, the state of productivity and indirect construction cost are analyzed in the steel production. As a result, the productivity and ratio of indirect cost in steel plant by inserted per 1ton are suggested.

  • PDF

The Network utility of Fire alarm annunciator (화재수신기의 네트워크 효용성)

  • Baek, Dong-Hyun;Lee, Jong-Moon;Kim, Eun-Su
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2010.04a
    • /
    • pp.114-119
    • /
    • 2010
  • 최근 설계, 시공되는 건축물은 초고층 또는 대단지 주거시설로서 화재발생시 초기에 빠른 대응이 요구 되나 근무자의 첨단 소방시설관리에 대한 지식은 부족한 실정이다. 본 연구에서는 건축물의 대형화로 인한 네트워크제어방식의 효용성을 알아보고 기시공된 현장의 화재수신기 네트워크 운영 실태 및 현황을 파악 하여 관리에 일조하고자 한다. 이를 위해 10개 대형현장의 네트워크를 조사한 결과 경보시스템에 대한 낮은 신뢰도 때문에 타설비와의 시트템구축을 기피하고 있었다. 또한 방재관련 법규의 제한된 규정으로 인한 통신선 사용에 있어서의 문제점도 개선될 필요가 있었다. 아울러 관리자의 잦은 이직으로 인한 기술적 축적 방안 마련, 복지문제와 면적이 넓은 네트워크시스템에 대한 신호처리방법 및 반응시간등에 대한 규정제정이나 운영상 표준화가 필요하였다.

  • PDF

A Field Study on the Preference in the Construction Management - Focused after construction Stage - (현장관리 업무체계의 실태조사 연구 - 준공 후 업무를 중심으로 -)

  • 이두진
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.85-89
    • /
    • 2003
  • With the social demands for tall building, the level of techniques for construction become high and there are various building materials. Also, the construction system become very complicated with the increase of worker. In spite of above facts, the method of construction management depends on the experimental capacity of a construction manager, and there are many unreasonable elements. These elements prevent well-going in construction process. To solve this problem, it is necessary to make a new system of construction management which is adequate for the condition of company and the contents of construction. In this study, the characteristic of production system and the present condition of construction management were investigated with the help of survey. Thus, the new method of construction management which can clear the previous problems was proposed.

  • PDF

An Analysis of Fatal Accident in Construction Field for Climate Factor and Its Management Plan (기후요소에 따른 건설현장의 사망재해 실태분석 및 관리방향)

  • Shin, Won-Sang;Lim, Gun-Ju;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.70-71
    • /
    • 2016
  • Recently, the climate change due to global warming, heat wave, heavy snow etc., is rapidly progressing all over the world. This kind of climate change is judged to be affecting a lot in construction industry which has characteristic of outdoor industry. Therefore this study, to prevent death disaster occurring by climate elements at construction site, quantitatively analyzed real condition of death disaster on construction site and suggests basic management direction which to be conducted on the site.

  • PDF