• Title/Summary/Keyword: 시공성 분석

Search Result 2,276, Processing Time 0.026 seconds

Statistical Analysis of Resistance of Reinforced Concrete Members (철근콘크리트 부재강도의 확률적 특성 분석)

  • 김상효;배규웅;박흥석
    • Magazine of the Korea Concrete Institute
    • /
    • v.3 no.4
    • /
    • pp.117-123
    • /
    • 1991
  • It is widely recognized that the strengths of reinforced concrete members have random characteristics due to the variability of the mechanical properties of concrete and steel, the dimensional error as well as incorrect placement of reinforcing bars. Statistical models of the variabilities of strengths of reinforced concrete members, therefore, need to be developed to evaluate the safety level implied in current practices. Based on the probabilistic models of basic factors affecting the R.C. member strengths, in this study, the probabilistic characteristics of member resistance have been studied through Monte Carlo simulation.

A Study on the Ground Settlement and Reinforcement Measures in the Case of Tunnelling at the Yangsan Fault (양산단층대 터널시공에서 침하량 및 보강대책에 대한 연구)

  • Jung, Hyuksang;Kim, Hyeyang;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.6
    • /
    • pp.35-48
    • /
    • 2009
  • An excessive ground displacement occurs with excavating tunnel in a fault zone because the fault has properties of soft ground in generally. It may have had a bad influence to adjacent structure. So, rapid reduction of ground strength by groundwater inflow should be prevented. It must be established for an impervious and reinforcing effect of ground to ensure a tunnel stability. The ground settlement and reinforcing effects were estimated by numerical analyses on tunnel through 570 m sector in Yangsan fault zone of Keongbu high-speed railway. Settlements evaluated by numerical analysis is similar to those calculated by using equation of Loganathan & Poulo. It was shown that reliable estimate of ground settlement by applying a prediction equation is possible. Applicability of adopted tunnel reinforcement method in fault zone was investigated by results of pilot construction and numerical analysis. Results from this study indicate that the adopted reinforcement method make tunnel displacements and member stresses restrain in design criteria.

  • PDF

Dissolution Resistance Property of Modified Asphalt Waterproofing Sheet Coated with Polyamide Film by SEM-EDX Analysis (폴리아마이드 필름이 코팅된 개량 아스팔트 방수시트의 SEM-EDX 분석을 통한 유기용제 저항성 확인)

  • An, Ki-Won;Yoo, Jae-Yong;Oh, Sang-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.5
    • /
    • pp.437-444
    • /
    • 2017
  • In the composite waterproofing method in which a polyurethane coating waterproofing material is applied on the modified asphalt waterproofing sheet, the organic solvent is diluted in the coating waterproofing material in order to improve the workability. However, since the organic solvent is not volatilized before the curing of the polyurethane coating waterproofing material, the organic solvent causes dissolution of asphalt layer, thereby causing oil leakage. As a result, a polyamide film having a high dissolution resistance property was laminated on modified asphalt sheet, and through testing the dissolution resistance was visually confirmed and quantitative analysis of the polyamide film by SEM-EDX analysis was also used to confirmed the dissolution resistance of the polyamide film.

A Study on the Construction Performance of Curtain Wall Systems Using Fire-Resistant & Light-Weight Inorganic Composite Foam Board (내화성 경량 무기 발포보드를 이용한 커튼월 시스템의 시공성능에 관한 연구)

  • Koo, Young-Ah;Kim, Seong-Eun;Oh, Chang-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.2
    • /
    • pp.127-134
    • /
    • 2014
  • This study had the goal of analyzing the economic feasibility and constructability of a fire resistant curtain wall system using Light-weight Inorganic Composite Foam Board(LI-CFB). LI-CFBs, new materials with excellent fire resistance are being developed for use as the back panel of curtain wall and their fire resistance has already been analyzed through actual tests in earlier studies. In this study, a mock-up test involving the installation of the fire resistant curtain wall system on an actual building was conducted, and the system was compared with a common curtain wall system. This system is applied in the same way as a common curtain wall system. But the cutting LI-CFBs, which are brought from a factory, are used in the system and attached on the frame (mullion and transom). Even though the system requires more working time than the existing system, the LI-CFBs back panels are easy to cut and do not produce dust. Also, the panels are able to be assured the quality by checking damaged parts easily. Besides having a high level of fire resistance, the system's economic feasibility and constructability meets or exceeds those of the existing system.

Study on the Rational Construction Method Using Analysis of the Case Study of PHC Pile Foundation in Song-Do Area (송도지역 내 PHC 말뚝기초 적용사례분석을 통한 적정 시공방법 연구)

  • Lee, Byengho;Lee, Jonghwi;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.3
    • /
    • pp.55-61
    • /
    • 2011
  • Song-Do international city is the area developed in large-scale land reclamation. Song-Do area consists of reclamation layer, sedimentary layer(loose silt, soft clay and sand alternating) and residual layer from the ground surface. Therefore, using pile foundation is inevitable to build structures safely. In this area, driven PHC piles have been generally constructed in terms of environmental and economic conditions. As a result of analyzing 4 sites in Song-Do district 5 and 7 recently, the method of driving pile has many problems because of existence of rigid soil in sedimentary layer and installation of more than 30m piles. In this case, when installing piles by drive after pre-boring up to appropriate depth, the results of constructability analysis were very good. And in the economic efficiency, although 4% of construction cost rose, it was a very slight increase in comparison with improvement of workability. In the case of the stability, more than 70% compared to the allowable stress of piles was satisfied through the load test. As a result, when PHC piles is installed in Song-Do district, the proper construction method is that piles are located at bearing layer after boring rigid sand layer.

Experimental Study on Field Applicability of Tightened Coupler with Two-Way Threading (양방향 나사산 체결방식을 활용한 완전밀착형 커플러의 시공성 분석)

  • Park, U-Yeol;Hong, Seong-Wook;Yang, Jin-Kook;Ko, Suck-Hwa;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.1
    • /
    • pp.87-93
    • /
    • 2014
  • A tightened coupler with two way-threading is suggested to overcome the previous one-way threaded coupler. The experiment and a mock-up test were conducted to analyze the constructability of the suggested coupler. The aim of the mock-up test was to assemble the suggested coupler in horizontal rebar of mat footing and vertical rebar of semi-fabricated column bars. The method using the suggested coupler in semi-fabricated column bars is developed by analyzing the problem of fabricated column bars using the one-way threaded coupler. The result of the mock-up test showed that the time required to assemble the suggested coupler in the horizontal bars is shorter than it is for the one-way threaded coupler. In addition, the method using the suggested coupler in semi-fabricated column bars has advantages such as lower working loads, supporting safe work and strongly tightening the rebar. From these results, it is revealed that the suggested coupler is adequate to use in rebar work in terms of cost, quality and time.

Improvement of Concrete Lining Construction Method in Large Section Tunnel (대단면 터널 라이닝 콘크리트 타설 기법 개선에 관한 연구)

  • Kim, Sang-Whang;Ra, Kyong-woong;Koh, Sung-Yil
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.1
    • /
    • pp.77-86
    • /
    • 2006
  • Although the adverse critisism have been continued that the concrete lining need or not, most tunnel engineer agree that the concrete lining needs to increase the tunnel safety To establish the concrete lining's quality improvement method, we grasp the basic problems in lining construction process and propose the lining construction methods to increase the concrete quality This paper present a reason of initial crack occurrence in the large section tunnel (4 lane wide span tunnel), lining and an improved method for crack minimization in construction process. It is also verified verify that the proposed method can give qualified concrete lining by carrying out the concrete injection model test and the numerical analysis of concrete flow.

  • PDF

A Study of the Demands for Improvements in Speciality Construction Technology (전문건설 업종별 기술 개선을 위한 수요 분석에 관한 연구)

  • Cho, Jaeyong;Lee, Baul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.24-32
    • /
    • 2022
  • In Korea, the productivity of the construction industry is evaluated at a very low level, and the utilization of the elemental technology of the Fourth Industrial Revolution is also very low compared to other industries. In order to solve this problematic situation, it is necessary to identify the demand for technology improvement in the specialty construction industry that is directly in charge of construction in projects. Therefore, this study aims to investigate improving construction competitiveness and the demand for technology improvement in Korea's specialty construction industry. First, the concept and status of classification of the specialized construction industry were identified, and a questionnaire was organized. Second, a survey was conducted on experts construction experts, and the demand for technical improvement of the specialty construction industry was derived by applying AHP and cluster analysis. The results of this study will serve as a practical reference for policy development, R&D direction, and technology development roadmap to enhance construction competitiveness in the future, and ultimately will help to present directions to improve the construction competitiveness of the construction industry.

Analysis of cause and deterioration about using 3-Arch tunnel (공용중인 3-Arch터널의 열화조사 및 원인분석)

  • Lee, Yu-Seok;Park, Sung-Woo;Whang, In-Baek;Shin, Yong-Suk;Kim, Sun-Gon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.1
    • /
    • pp.97-105
    • /
    • 2009
  • This paper studied the cause of the deterioration of the four 3-Arch tunnels built in mid-1990. The common deteriorations of the four 3-Arch tunnels were longitudinal cracks, leakage and efflorescence at the same parts of lining concrete. Three fourths of 3-Arch tunnels, there was high percentage longitudinal cracks and a quarter was low frequency about longitudinal cracks. So the material reviewed to find out the differences between two groups in construction process and analysis was conducted such as non-destructive testing, precise visual survey and safety evaluation of one tunnel which had bad ground condition As the result, the tunnels were safety condition and the primary deterioration occurred during the construction process, namely, problems arrangement of rebar and the effects of the blast at middle tunnel.

Analysis of correlation between shield TBM construction field data and settlement measurement data (쉴드 TBM 시공데이터와 지반침하 계측데이터 간 상관성 분석)

  • Jung, Ye-Rim;Nam, Kyoung-Min;Kim, Han-Eol;Ha, Sang-Gui;Yun, Ji-Seok;Cho, Jae-Eun;Yoo, Han-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.1
    • /
    • pp.79-94
    • /
    • 2022
  • The demand for tunnel construction is increasing as part of underground space development due to urban saturation. The shield TBM method minimizes vibration and noise and minimizes ground deformation that occurs simultaneously with excavation, and shield TBM is generally applied to tunnel construction in urban areas. The importance of urban ground settlement prediction is increasing day by day, and in the case of shield TBM construction, ground deformation is minimized, but ground settlement due to tunnel excavation inevitably occurs. Therefore, in this study, the correlation between shield TBM, which is highly applicable to urban areas, and ground settlement is analyzed to suggest the shield TBM construction factors that have a major effect on ground settlement. Correlation analysis was performed between the shield TBM construction data and ground settlement measurement data collected at the actual site, and the degree of correlation was expressed as a correlation coefficient "r". As a result, the main construction factors of shield TBM affecting ground settlement were thrust force, torque, chamber pressure, backfill pressure and muck discharge. Based on the results of this study, it is expected to contribute to the presentation of judgment criteria for major construction data so that the ground settlement can be predicted and controlled in advance when operating the shield TBM in the future.