• Title/Summary/Keyword: 시공성개선

Search Result 775, Processing Time 0.024 seconds

Enhancing Construction Productivity and Quality Through Waterproofing Equipment Technologies (생산성 및 품질향상을 위한 방수공사의 장비 활용 시공기술)

  • Kim, Han-Sic;Ha, Jung-Soo;Lee, Young-Do
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.4
    • /
    • pp.429-440
    • /
    • 2023
  • This research investigates the deployment of waterproofing technologies in construction, with a specific focus on augmenting worker safety, work environment, and solve the difficulty of securing skilled workers. Implementing liquid waterproofing cement equipment resulted in a remarkable increase in adhesion performance by around 20%, coupled with a twofold acceleration in operational speed. The application of primer spraying apparatus led to a two-fold improvement in both penetration and adhesion performance, concurrently boosting the work speed by approximately the same factor. With urethane spraying equipment, the workload could be reduced to a third for the same layer thickness, adhesion performance enhanced by approximately 1.4 times, and workability improved by about 1.4 to 1.5 times. These findings suggest that such technological interventions can potentially enhance work efficiency, improve the quality of output, and mitigate safety accidents that are commonplace in manual operations. Furthermore, these advancements present promising solutions to the ongoing challenges of sourcing highly-competent workers in the industry.

The Construction Method on the Arch-type Anchor Block by means of Hight-adjustable Auger-crane with Hydraulic Expansion (신축형 오거크레인용 유압식 확장기를 이용한 아치형 전주근가 시공법)

  • Kim, J.S.;Kwon, S.W.;Park, Y.B.;Kwon, S.W.;Mun, S.W.;Cho, S.M.;Kim, D.Y.;Kwon, Y.M.
    • Proceedings of the KIEE Conference
    • /
    • 2008.04b
    • /
    • pp.19-21
    • /
    • 2008
  • 현행 배전선로의 전주근가(1.2m 장방형)는 오거크레인을 이용한 건주공사 완료 후 전주근가 시공을 위한 별도의 인력 또는 백호우 장비가 추가로 투입피어 시공함으로써 인력으로는 공사시간이 장기간 소요되고 백호우장비로는 작업장 환경훼손과 시공원가 상승의 문제점이 있었다. 이러한 문제점을 해소하기 위하여 건주공사에 사용되는 오거크레인의 굴착 직경을 80cm까지 확장 가능한 '신축형 오거크레인용 유압식 확장기'와 원형 굴착공에 시공이 가능한 '아치형 전주근가'를 개발하고 이를 이용한 시공기술을 개발함으로써 동일장소에서 굴착작업이 수반되는 건주작업, 전주근가 매설작업을 가능하게 하여 장비활용성 증대, 작업장 환경개선, 공사기간 단축 및 시공원가 절감 등의 효과가 기대되는 기술을 개발하였다.

  • PDF

고성능 콘크리트의 정의 및 교량 바닥판의 실용화

  • 정원기;이형준
    • Magazine of the Korea Concrete Institute
    • /
    • v.11 no.3
    • /
    • pp.70-84
    • /
    • 1999
  • HPC를 사용한 장기수명 바닥판 콘크리트의 시공에 관한 4가지 접근방법을 제시하였다. Nebraska, New Hampshire, Texas 그리고 Virginia 등 4개주의 프로젝트에서 보면 아래와 같이 여러 가지 유사성을 알 수 있었다. $\cdot$ HPC의 사용은 장기 수명의 교량 바닥판을 건설하기 때문에 life cycle cost와 유지관리비의 감소가 예상된다. $\cdot$ 교량 바닥판에 대한 HPC의 중요성은 더 큰 강도보다는 내구성과 시공성을 일관성있게 양호하게 개선한다는 것이다. $\cdot$ 그 지역의 재료와 기존의 방법을 가능한 최대한 범위로 사용한다. $\cdot$ 많은 실험실 및 현장 시험 배합표가 개발되었고 배합되었다. 성능 특성은 혼합 재료의 형태, 상품 및 배합에 따라 다르게 나타났다. $\cdot$ 향상된 성질을 갖는 균일하고 일관성 있는 제품의 사용에 덧붙여 적절한 시공 기술은 장기 수명의 콘크리트 구조물을 위해서는 필수적이다. $\cdot$ 알카리-골재 반응을 갖고 있는 지역이나 높은 황산염을 갖고 있는 지역과 같이 특별한 문제점이 예상되는 지역에서는 화학적 내구성을 검토하기 위해 별도의 실험이 필요하다. $\cdot$ 현장에서 소요의 성능특성을 얻기 위해서는 시작부터 모든 분야 사이의 원활한 의견 교환과 협력이 요구된다.

A Case Study on the Application of Low Vibration Explosives(LoVEX) in Tunnel Blasting (미진동화약을 적용한 터널발파 사례 연구)

  • Lee, Dong-Hoon;Park, Yun-Seok;Lee, Dong-Hee;Yoo, Joung-Hoon
    • Explosives and Blasting
    • /
    • v.30 no.2
    • /
    • pp.59-65
    • /
    • 2012
  • This study improved constructability and cost efficiency that are disadvantages of existing a mechanical excavation & similar blasting methods(plasma, gel, etc) and introduced cases of development and practical applications of Low vibration explosives(LoVEX) that minimizes blast vibration. The low vibration explosives(LoVEX) is suitable to Type-1 in standard blasting patterns of Ministry of Land, Transport and Maritime Affairs(MLTM) and delay blasting is possible. Moreover, the low vibration explosives improve construction and work efficiency while the level of vibration is reduced to about 60~70% of normal emulsion explosives. Additionally, this study suggested standard blasting patterns, the prediction equation of blasting vibration, and construction methods.

The Development and Application of Low Vibration Explosives(NewFINECKER) (미진동 화약(NewFINECKER) 개발 및 현장 적용에 관한 연구)

  • Park, Yun-Seok;Jeong, Min-Su
    • Explosives and Blasting
    • /
    • v.28 no.1
    • /
    • pp.11-18
    • /
    • 2010
  • This study improved construction and cost efficiency that are disadvantages of existing low vibration crackers(low vibration cracker, plasma, etc) and introduced cases of development and practical applications of Low vibration explosives(NewFINECKER) that minimizes blast vibration. The low vibration explosives(NewFINECKER) is suitable to Type-1 among standard blasting patterns of Ministry of Land, Transport and Maritime Affairs(MLTM) and delay blasting is possible. Moreover, the low vibration explosives improve construction and work efficiency while the level of vibration is shown to be about 60~70% of normal emulsion explosives. Additionally, this study suggested standard blasting patterns, the prediction equation of blasting vibration, and construction methods.

A Study on the Quality Control Effectiveness in the High-rise residential-commercial Complex Building Project (초고층 주상복합건물의 품질관리 효율성에 관한 연구)

  • Kim, Suk-Hoi;Im, Chil-Soon
    • Journal of Korean Association for Spatial Structures
    • /
    • v.7 no.4
    • /
    • pp.79-87
    • /
    • 2007
  • The object of this study is to understand of the effectiveness characteristic in the field work which is controlled by the quality in the high-rise residential-commercial complex building. From the previous study, the quality improvement factors are investigated. Through the structured questionnaire, the opinions of the field engineers(University, Design firms, Construction company) are gathered in the improvement factors of construction phase. Comparing the results of questionnaire with the conception of field engineers, this study helps in revising and improving the quality control system including tangible factors and intangible factors in the frame work of the high-rise residential-commercial complex building project.

  • PDF