A Study on Benefit/Cost Analysis of Form Work Methods for High-rise Residential Buildings (고층 주거건축물 거푸집의 편익/비용 분석에 관한 연구)

  • Kim, Jae-Yeob;Kim, Jae-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.4
    • /
    • pp.49-57
    • /
    • 2010
  • Selecting an appropriate formwork to fit the construction of a high-rise building is an important factor that can influence the success or failure of a construction. Currently, however, the reality is that in domestic high-rise building construction, the selection of an appropriate formwork with consideration of the characteristics of the formwork has not been done in a reasonable manner. To select formwork in a systematic and reasonable fashion, comprehensive consideration is required that must not only include the aspect of construction costs, but also air, quality, safety, and environmental issues. Therefore, this study aims to rationalize the selection process of formwork by applying the scientific method of Analytic Hierarchy Process (AHP) to the selection process of formwork, in terms of construction costs, quality and safety. To do this, the researcher investigated the current status of formwork being used in high-rise residential building construction. Then, based on the results of this investigation, the researcher selected an alternative for the formwork, and taking construction experts as the subjects of this study, conducted a survey on the applicability of the formwork as well as the priority of management thereof when selecting formwork. It is judged that the results of this research will contribute a more scientific and reasonable decision-making process than the existing non-scientific method in selecting formwork for high-rise residential building construction.

A study on platform-based preliminary design guidelines associated with the behaviour of piles to adjacent tunnelling (터널근접시공에 의한 말뚝의 거동을 고려한 플랫폼 기반의 예비 설계 가이드라인에 대한 연구)

  • Jeon, Young-Jin;Lee, Gyu-Seol;Lee, Jae-Cheol;Batbuyan, Chinzorig;Lee, Cheol-Ju
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.2
    • /
    • pp.129-151
    • /
    • 2022
  • In the current work, a series of three-dimensional finite element analyses have been carried out to understand the behaviour of piles when the adjacent tunnelling passes underneath grouped piles with a reinforced pile cap. In the current study, the numerical analysis studied the computed results regarding the ground reinforcement condition between the tunnel and pile foundation. In addition, several key issues, such as the pile settlements, the axial pile forces, the shear stresses and the relative displacements have been thoroughly analysed, and the IoT platform based preliminary design guidelines were also presented. The pile head settlements of the nearest pile from the tunnel without the ground reinforcement increased by about 70% compared to the farthest pile from the tunnel with the maximum level of reinforcement. The quality management factor data of the piles were provided as API (Application Programming Interface) of various forms by the collection and refinement. Hence it has been shown that it would be important to provide the appropriate API by defining the each of data flow process when the data were created. The behaviour of the grouped piles with the pile cap, depending on the amount of ground reinforcement, has been extensively analysed, and the IoT platform regarding the quality management of piles has been suggested.