• Title/Summary/Keyword: 스마트 빌딩

Search Result 108, Processing Time 0.019 seconds

A Study on the Collaboration Learning Effect of BIM/IPD Through Constructivism Learning Method (구성주의 학습 방법을 통한 BIM/IPD협업 학습효과에 대한 연구)

  • Jin, Juan;Choi, Jungsik;Kim, Inhan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.5
    • /
    • pp.3-16
    • /
    • 2021
  • The purpose of this study is to verify the practical effectiveness of the constructivism education theory in building information modeling (BIM)/integrated project delivery (IPD) collaboration education by determining education methods that are most relevant to collaboration in the interaction process. We propose a BIM training model that enhances students' satisfaction in class and collaboration. We aim to identify interrelationships between BIM collaboration education and constructivism theories, examining constructivism methods in BIM/IPD classes to discern which are the most suitable for improving and enhancing collaboration and the proposed education model.

Design and Implementation of User Pattern based Standby Power Reduction System Applying Zigbee-MQTT in a Smart Building Environment (스마트빌딩 환경에서 Zigbee-MQTT를 이용한 사용자 패턴 기반 대기전력 저감 시스템 설계 및 구현)

  • Jang, Young-Hwan;Lee, Sang-Soon
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.24 no.9
    • /
    • pp.1158-1164
    • /
    • 2020
  • In Korea, the dependence on imported energy is very high, and research to reduce standby power is being conducted based on Zigbee, a low-power technology, to reduce wasted power and improve power efficiency. However, because Zigbee is not an IoT standard protocol and is not network-based, it is necessary to build a network with a separate gateway, and research on standby power is insufficient because the standards for international power consumption of devices are ambiguous. Therefore, in this paper, we applied the IoT standard protocol MQTT to the existing Zigbee technology to build a network network without a separate gateway, and designed and implemented a standby power reduction system that collects standby power degradation and user patterns. As a result of evaluating with the existing system, it was confirmed that about 7.11% of standby power was consumed compared to the existing system.

Active Control for Seismic Response Reduction Using Probabilistic Neural Network (지진하중을 받는 구조물의 능동제어를 위한 확률신경망 이론)

  • Kim, Doo-Kie;Lee, Jong-Jae;Chang, Seong-Kyu;Choi, In-Jung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.11 no.1
    • /
    • pp.103-112
    • /
    • 2007
  • Recently structures become longer and higher because of the developments of new materials and construction techniques. However, such modern structures are susceptible to excessive structural vibrations, which may induce problems of serviceability and structural damages. In this paper we attempt to control structural vibration using the probabilistic neural network(PNN) and the artificial neural network(ANN) based on the training pattern that consist of only the structural state vector and the control force. The state vectors of the structure and control forces made by linear quadratic regulator(LQR) algorithm are used for training pattern of PNN and ANN. The proposed algorithm is applied for the vibration control of the three story shear building under Northridge earthquake. Control results by the proposed PNN and ANN are compared with each other.

A Study on Resolving Shadow Area of LoRa-based Communication for Workplace Safety (작업현장의 안전을 위한 LoRa기반 통신의 음영지역 해소를 위한 연구)

  • Kim, Seungyong;Kim, Dongsik;Hwang, Incheol;Kim, Kyoungsoo;Kim, Gyoungyong
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.2
    • /
    • pp.402-410
    • /
    • 2020
  • Purpose: The purpose of this research is to eliminate communication shadowing loss of the 'smart safety management system'. The 'smart safety management system' can monitor and relay real time data of workers working in high risk workplace (i.e: industrial scene, disaster scene). The data will provide the rescue team the 'golden hour' in their rescue operations. Method: In this research, safety tag was designed and implemented so that it acts as a repeater for the user. Result: In other words, when communication in-between the safety tag and headquarters' communication terminal is jeopardized, the safety tag will act as a repeater-terminal for other safety tags in the area. Conclusion: The research tested if a specific building with communication shadowing loss problem was resolved when safety tags were implemented. Communication shadowing was first identified in-between the safety tag and headquarters' communication terminal. When extra safety tags were deployed in the same situation, the results showed that the communication shadowing loss was resolved. The repeater safety tags could resolve communication shadowing loss of up to three basement levels in this test building.

A Study on Competency Evaluation and Improvement Plan of Electrical Construction Management Using Importance-Performance Analysis (IPA를 활용한 전기공사 건설사업관리 역량 평가 및 개선방안 연구)

  • Kim, Seungbeum;Byun, Jeongyoon;Kim, Juhyung;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.103-112
    • /
    • 2014
  • Since recent construction projects become larger and complicated, the level of difficulty of management skill is rising, and the risk is increasing accordingly so the necessity of improving management skill of projects is increasing. In order to solve this problem, Construction Management system was preferentially introduced in construction projects but in case of domestic construction industry, separate contracts by business boundary are being made so the actual state is that the function of the Construction Management system is not properly operated over the overall projects. The partial operation of Construction Management system like this may impose many restrictions on converged and combined projects such as smart grid and intelligent buildings etc. in the future. For improvement of management skill of domestic construction projects, the competence of project management skill by work areas that can overcome heterogeneity of the current project management skill shall be secured, and any factor that impedes cooperation ability shall be found and that shall be solved. Therefore, the difference of work competency of project management system of construction and electrical construction is to be analyzed by utilizing IPA model in this study, and a plan to introduce the project management system of electrical construction for efficient operation of projects is to be looked into.

A Time Slot Assignment Scheme for Sensor Data Compression (센서 데이터의 압축을 위한 시간 슬롯 할당 기법)

  • Yeo, Myung-Ho;Kim, Hak-Sin;Park, Hyoung-Soon;Yoo, Jae-Soo
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.15 no.11
    • /
    • pp.846-850
    • /
    • 2009
  • Recently, wireless sensor networks have found their way into a wide variety of applications and systems with vastly varying requirements and characteristics such as environmental monitoring, smart spaces, medical applications, and precision agriculture. The sensor nodes are battery powered. Therefore, the energy is the most precious resource of a wireless sensor network since periodically replacing the battery of the nodes in large scale deployments is infeasible. Energy efficient mechanisms for gathering sensor readings are indispensable to prolong the lifetime of a sensor network as long as possible. There are two energy-efficient approaches to prolong the network lifetime in sensor networks. One is the compression scheme to reduce the size of sensor readings. When the communication conflict is occurred between two sensor nodes, the sender must try to retransmit its reading. The other is the MAC protocol to prevent the communication conflict. In this paper, we propose a novel approaches to reduce the size of the sensor readings in the MAC layer. The proposed scheme compresses sensor readings by allocating the time slots of the TDMA schedule to them dynamically. We also present a mathematical model to predict latency from collecting the sensor readings as the compression ratio is changed. In the simulation result, our proposed scheme reduces the communication cost by about 52% over the existing scheme.

Independent I/O Relay Class Design Using Modbus Protocol for Embedded Systems

  • Kim, Ki-Su;Lee, Jong-Chan
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.6
    • /
    • pp.1-8
    • /
    • 2020
  • Communication between system modules is applied using the Modbus protocol in industrial sites including smart factories, industrial drones, building energy management systems, PLCs, ships, trains, and airplanes. The existing Modbus was used for serial communication, but the recent Modbus protocol is used for TCP/IP communication.The Modbus protocol supports RTU, TCP and ASCII, and implements and uses protocols in embedded systems. However, the transmission I/O devices for RTU, TCP, and ASCII-based protocols may differ. For example, RTU and ASCII communications transmit on a serial-based communication protocol, but in some cases, Ethernet TCP/IP transmission is required. In particular, since the C language (object-oriented) is used in embedded systems, the complexity of source code related to I/O registers increases. In this study, we designed software that can logically separate I/O functions from embedded devices, and designed the execution logic of each instance requiring I/O processing through a delegate class instance with Modbus RTU, TCP, and ASCII protocol generation. We designed and experimented with software that can separate communication I/O processing and logical execution logic for each instance.

BIM Mesh Optimization Algorithm Using K-Nearest Neighbors for Augmented Reality Visualization (증강현실 시각화를 위해 K-최근접 이웃을 사용한 BIM 메쉬 경량화 알고리즘)

  • Pa, Pa Win Aung;Lee, Donghwan;Park, Jooyoung;Cho, Mingeon;Park, Seunghee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.2
    • /
    • pp.249-256
    • /
    • 2022
  • Various studies are being actively conducted to show that the real-time visualization technology that combines BIM (Building Information Modeling) and AR (Augmented Reality) helps to increase construction management decision-making and processing efficiency. However, when large-capacity BIM data is projected into AR, there are various limitations such as data transmission and connection problems and the image cut-off issue. To improve the high efficiency of visualizing, a mesh optimization algorithm based on the k-nearest neighbors (KNN) classification framework to reconstruct BIM data is proposed in place of existing mesh optimization methods that are complicated and cannot adequately handle meshes with numerous boundaries of the 3D models. In the proposed algorithm, our target BIM model is optimized with the Unity C# code based on triangle centroid concepts and classified using the KNN. As a result, the algorithm can check the number of mesh vertices and triangles before and after optimization of the entire model and each structure. In addition, it is able to optimize the mesh vertices of the original model by approximately 56 % and the triangles by about 42 %. Moreover, compared to the original model, the optimized model shows no visual differences in the model elements and information, meaning that high-performance visualization can be expected when using AR devices.