Exposure Characteristics to Noise Among Tunnel Construction Workers (터널공사현장 근로자의 소음노출 특성 평가)

  • Kim, Kab Bae;Jang, Jae-Kil
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.23 no.9
    • /
    • pp.831-840
    • /
    • 2013
  • The noise levels of workers in tunnel sites are likely to be high because tunneling work places are confined space. However, research on the noise exposure levels of tunneling workers have not been performed intensively due to restricted accessibility to tunnel construction sites. The aim of this study is to evaluate the noise exposure levels for workers engaged in tunneling work sites. Noise dosimeters were used for monitoring workers' noise exposure level in 5 tunneling work sites in accordance with the Notification of the Ministry of Labor. Among 5 tunneling work sites, 4 of them used NATM tunneling method and 1 work site used shield TBM tunneling method. The average noise exposure levels of NATM tunneling workers was 81.1 dB(A) and 15.4 % of the workers' noise level were exposed more than 90 dB(A) which is the exposure limit value. In Shield TBM tunneling method, 4.3 % of the workers were exposed more than 90 dB(A) of noise level, the average noise exposure levels of TBM tunneling workers was 84.1 dB(A).

Dynamic Numerical Modeling of Subsea Railway Tunnel Based on Geotechnical Conditions and Seismic Waves (지반조건과 지진파를 고려한 해저철도 터널의 동적 수치 모델링)

  • Kwak, Chang-Won;Yoo, Mintaek
    • Journal of the Korean Geotechnical Society
    • /
    • v.38 no.11
    • /
    • pp.69-86
    • /
    • 2022
  • The railway is widely used to transport passengers and freight due to its punctuality and large transport capacity. The recent remarkable development in construction technology enables various subsea railway tunnels for continent-continent or continent-island connectivity. In Korea, design and construction experience is primarily based on the successful completion of the Boryeong subsea tunnel (2021) and the Gadeok subsea tunnel (2010). However, frequent earthquakes with diverse magnitudes, globally induced and continuously increased the awareness of seismic risks and the frequency of domestic earthquakes. The effect of an earthquake on the subsea tunnel is very complicated. However, ground conditions and seismic waves are considered the main factors. This study simulated four ground types of 3-dimensional numerical models, such as soil, rock, composite, and fractured zone, to analyze the effect of ground type and seismic wave. A virtual subsea railway shield tunnel considering external water pressure was modeled. Further, three different seismic waves with long-term, short-term, and both periods were studied. The dynamic analyses by finite difference method were performed to investigate the displacement and stress characteristics. Consequently, the long-term period wave exhibited a predominant lateral displacement response in soil and the short-term period wave in rock. The artificial wave, which had both periodic characteristics, demonstrated predominant in the fractured zone. The effect of an earthquake is more noticeable in the stress of the tunnel segment than in displacement because of confining effect of ground and structural elements in the shield tunnel. 

A study on Gap Parameter and Influence Area of Ground Settlement Using Back Analysis Constructed by Shield TBM with Shallow Depth (천층터널 쉴드TBM에서 역해석을 이용한 Gap Parameter 및 지표침하 영향범위에 대한 연구)

  • Koh, Sung-Yil;Kwon, Sung-Ju;Hwang, Chang-Hee;Kim, Sang-In;Choo, Seok-Yeon
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1509-1518
    • /
    • 2011
  • Shield TBM tunneling method has been getting the spotlight for urban tunneling. It can be minimized the civil complaint during construction and possible safe tunneling. But the settlement has occurred inevitably due to characteristics of shield TBM equipment. For this reason, the civil complaint can occur in urban areas when tunnel with shallow depth passes through neighboring building or residential area. In this study, the occurrence factors of settlement according to shield TBM tunneling and the tendency of ground settlement by strata condition had analyzed. It is suggested that the practical settlement estimation method and minimizing method of ground settlement under simultaneous backfill grouting condition through measurement results and back analysis data using gap parameter.

  • PDF

Determination of a large shield TBM for a tunnel under the Han river in the Bundang railway (분당선 철도 한강 하저터널에서 대구경 쉴드장비 선정)

  • Kim, Yong-Il;Kim, Dong-Hyun;Cho, Sang-Kook
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.569-578
    • /
    • 2003
  • In this paper a determination of the optimal excavation method and machine type for a tunnel under the Han river between the Sungsoo-dong, Sungdong-Gu and the Chungdaw-dong, Kangnam-Gu in the Bundang railway. The geological investigation results show that some fractured zones exist locally under the northern boundary of the Han river bed, but the other regions consist mostly of hard rocks of good quality in the tunnel excavation level. Also, a hign water pressure of $5kgf/cm^2$ and a flash inflow of river water due to old boring holes are expected during tunnel excavation. A EPB shield TBM is selected as a optimal excavation machine for the Han river tunnel considering the geological and ,site conditions.

  • PDF

A Study of the Large Diameter Shield TBM Excavation for Subway Tunnels (지하철 터널에 적용된 대구경 쉴드 TBM의 굴착성능 연구 분석)

  • Lee, Seong-Won;Kang, Moon-Gu
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1500-1505
    • /
    • 2010
  • The objective of this study is controlling of the large diameter Shield TBM excavation for subway tunnels. In this paper, it will focus on the selection of Shield TBM and the problems of excavation due to unusual abrasion of the Disk Cutters and the distorted Cutter Mounts, in mixed layer of soil in below and hard rock in above, and in rock layer. And also, it will be discussed that the type of ground improvement to change and repair the Disk Cutters and the distorted Cutter Mounts, Advance Rate, Cutter Torque, etc. The results of this study will be using controlling of the excavation in various large diameter Shield TBM for subway tunnels.

  • PDF

A Study on Backfill Injection of Shield Tunnelling (쉴드터널에서의 뒷채움주입에 관한 연구)

  • 민덕기;백진욱
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1995.10a
    • /
    • pp.201-210
    • /
    • 1995
  • In Resent years, urban tunnels have been more deeply constructed due to the congestion of buried steuctures. In such conditions, the shield method has become one of the popular urban tunnelling method by reason of several characteristics ; safety of construction, mimium environmental damage, and workbility. In tunnelling, the space which is tail-void are created between the ground and the other face of the primary lining. in other to reduce the ground seformation, it is important backfilling in tail-void. In this paper, the result of an experimental investigation undertaken to evaluate the physical and mechanical propeties of grouts composed of various mixtures of backfill materials. And the backfill injection model test was carried out considering the effects of tail-void.

  • PDF

Boulder Detection Methods and its Compensation for Obstruction in sonft Ground Tunnels by Shielded TBM (연약지반 쉴드 터널 굴착시 전석장애물 탐지방법 및 보상문제)

  • Jee Warren-Wangryul;Ha Sang-Gui
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.1 s.32
    • /
    • pp.110-117
    • /
    • 2006
  • Boulder detection methods and its compensation is discussed with consideration of boulder conditions in soft ground tunneling by shielded TBM. For analysis of proper compensation methods for boulder obstruction, its removal costs and cases on eight projects are presented. Compensation for boulder obstruction removal by volume or weight is not practical for most tunneling situation, but compensation by crew time is probably the most equitable method. If boulders are anticipated on project, boulder removal plan must be considered with proper equipment selection.

Pre-grouting for CHI of EPB shield TBM in difficult grounds: a case study of Daegok-Sosa railway tunnel (복합지반 EPB TBM 커터교체를 위한 그라우팅 수행 사례)

  • Kang, Sung-Wook;Chang, Jaehoon;Lee, Jae-Won;Kim, Dae-Young;Shin, Young-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.5
    • /
    • pp.281-302
    • /
    • 2021
  • Railway projects have been consistently increasing in Korea. In relation to this trend, the mechanized tunneling using Tunnel Boring Machine (TBM) is preferably applied for mining urban areas and passing under rivers. The TBM tunneling under difficult grounds like mixed faces with high water pressure could require ground improvements for stable TBM advance or safe cutter head intervention (CHI). In this study, pre-grouting works for CHI in Daegok-Sosa railway project are presented in terms of the grouting zone design, the executions and the results, the lessons learned from the experience. It should be mentioned that the grouting from inside TBM was carried out several times and turned out to be inefficient in the project. Therefore, grouting experiences from the surface are highlighted in this study. Jet grouting was implemented on CHI points on land, while permeation grouting off shore in the Han River, which mostly allow to access the cutter head of TBM in free air with stable faces. The results of CHI works have been analyzed and the lesson learned are suggested.

An experimental study for water tightness of segment under high water pressure (고수압 조건에서의 세그먼트 방수성능평가에 대한 실험적 연구)

  • Choo, Seok-Yean;Park, Young-Jin;Kim, Dong-Hyun;Kim, Yong-Il;Lee, Du-Wha;Cho, Sang-Kook
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.4
    • /
    • pp.361-370
    • /
    • 2003
  • In this study, the performance of water tightness of water expansional sealing material and gasket was evaluated. The water tightness test was performed varying the type of inner pressure condition, for which the water expansional sealing material was inundated for 5 days to evaluate the ability of water tightness. In order to carry out this test, we made use of two types of water expansional sealing material; general type and combined type with non-expansional rubber. In the case of gasket, EPDM gasket and complex gasket sticked to the water expansional sealing material were applied. The performance of water tightness depended on the construction defect and the deformation of segment. The construction defect and segment deformation were generally expressed by gap and offset of the construction joint. The results, of tests showed that the performance of water tightness was largely influenced by the gap between segments. Management criteria of gap and offset were proposed.

  • PDF

Investigation of Prior Technology and Development Case for Consecutive Excavation Technique of Shield TBM (연속굴착 쉴드 TBM 기술 관련 해외기술 및 개발사례 조사)

  • Mun-Gyu Kim;Jung-Woo Cho;Hyeong-seog Cha
    • Tunnel and Underground Space
    • /
    • v.33 no.5
    • /
    • pp.299-311
    • /
    • 2023
  • Continuous excavation technologies are developed to improve the excavation rate of shield TBM. Continuous excavation is a technology that provides thrust to segments, excluding being installed one, to reduce tunneling downtime. This paper investigated the prior technology related to continuous excavation segments. The main technology was classified into helical segment, honeycomb segment, and conventional segment methods. The helical segment method has not been applied in actual construction yet, and the honeycomb segment method has not succeeded in commercialization. The continuous excavation method using conventional segments has been successfully demonstrated. The thrust force and operation method of the thrust jacks for the semi-continuous technology were analyzed. Continuous excavation TBM research is also progressing in Korea, and through the analysis of successful cases, the need to develop independent continuous excavation methods has been identified.