• Title/Summary/Keyword: 수자원시설

Search Result 1,372, Processing Time 0.029 seconds

Assessment of the Potential Water Supply Rate of Agricultural Irrigation Facilities Using MODSIM - For Geum River Basin - (MODSIM을 이용한 농업용 수리시설의 용수공급율 평가 - 금강권역을 중심으로 -)

  • Ahn, So-Ra;Park, Geun-Ae;Shin, Young-Ho;Kim, Seong-Joon
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.10
    • /
    • pp.825-843
    • /
    • 2009
  • To prepare for agricultural droughts, the potential discharge to the water supply of irrigation facilities during drought periods is important. Using the MODSIM (Modified SIMYLD) model, water balance networks that consider irrigation facilities were designed for the Geum River Basin, and the potential discharge to the agricultural water supply of irrigation facilities were evaluated by running the model using data for 36 years (1967-2002). It was found that agricultural water deficiencies occurred during the drought years more than in the other years. The agricultural water deficiencies in 1994, 1995, and 2001, the representative drought years, were 745.8 million m$^3$, 661.1 million m$^3$, and 696.8 million m$^3$, respectively. The average potential discharge to the water supply of the sub-basin was 99.1 % in the cases of municipal and industrial water, and 84.4 % in the case of agricultural water. The potential discharge to the water supply in 1994, 1995, and 2001 were 74.8 %, 79.2 %, and 77.9 %, respectively, which are lower than those of the other years' sub-basin average. In the analysis of the contribution of each irrigation facility, the contributions of pumping stations and diversions were calculated as 32.5 %, and of culverts and wells, 4.0 %. During the drought periods, the pumping stations and diversions contributed to a certain level.

Comparison of Rainfall-Runoff Charicteristic from Non-Point Pollution Priority Management Region in the Upstream of Han River Basin (한강상류 비점오염 관리지역의 강우시 유출 특성 비교)

  • Kim, Tae-Yoo;Choi, Yong-Hun;Won, Chul-Hee;Park, Soo-Young;Choi, Joong-Dae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.1253-1257
    • /
    • 2010
  • 강원도 홍천군 내면에 위치한 비점오염 관리지역의 강우시 유출 특성을 파악하고, 비교하기위해 연구를 수행하였다. 2009년 6월부터 2009년 11월까지의 연구기간 중 강우량이 비교적 많은 7회의 강우사상에 대하여 단위면적당 유출량, 유량가중평균농도, 단위면적당 오염부하를 비교하며, 분석하였다. 강우사상별 단위면적당 총 유출량은 저감시설의 설치 유 무에 따라 명확한 경향이 나타나지 않았다. 자운천 유역의 SS, TP의 유량 가중평균농도는 각각 4.0~1440.4 mg/L와 0.024~0.267 mg/L의 범위로 나타났으며, 덕두원 유역의 SS, TP의 유량가중평균농도는 각각 6.2~1001.1 mg/L, 0.039~0.226 mg/L의 범위로 나타났다. 지령골 유역의 SS, TP의 유량가중평균농도는 각각 3.4~1050.6 mg/L, 0.08~0.342 mg/L의 범위로 조사되었다. 10차, 11차, 12차, 26차의 SS 항목에서는 비점오염 저감시설이 설치된 자운천과 덕두원 유역에 비해 다소 높은 것으로 나타났으며, TP는 대부분의 강우사상에서 지령골의 유량가중평균농도가 높았다. 자운천의 강우사상에 따른 SS의 단위면적당 오염부하는 0.24~1,397.85 kg/ha의 범위로 나타났으며, 덕두원과 지령골에서 산정된 SS의 단위면적당 오염부하는 각각 0.06~1,236.78 kg/ha와 0.29~894.81 kg/ha로서 8차와 9차 강우사상을 제외한 나머지 강우사상에서는 비점오염 저감시설이 설치되지 않은 지령골에서 더 많은 양이 발생하였다. TP의 경우 자운천과 덕두원 유역의 단위면적당 TP 오염부하는 각각 0.0006~0.33 kg/ha와 0.0005~0.21 kg/ha의 범위로 나타났으며, 지령골 유역의 강우사상에 따른 단위면적당 오염부하는 0.003~0.29 kg/ha의 범위로서 저감시설이 설치된 자운천과 덕두원 유역보다 높게 나타났다. 단위면적당 오염부하에 기초할 때, 비점오염 저감시설이 설치된 소유역에서 SS와 TP 항목에 대한 저감효과가 나타났다. 하지만 짧은 모니터링 기간과 자료의 부족으로 인해 비교 및 분석의 한계가 있다고 판단된다. 본 연구는 지속적인 모니터링으로 더 많은 자료가 확보될 때 비점오염 저감사업의 효과를 극대화시킬 수 있는 방안을 제시 할 수 있을 것으로 사료된다.

  • PDF

A Critical Review of Waterfront Maintenance Plan for Urban Development - Focused on Waterfront Development - (도시개발에 따른 친수공간 정비계획의 재고찰 - 워터프론트개발 사례를 중심으로 -)

  • Choi, Jin-Do;Park, Sung-Je;Ryu, Si-Saeng
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.965-969
    • /
    • 2012
  • 도시의 개발을 통한 발전방향은 지역별 기술력을 바탕으로 시대의 흐름과 문화, 경제, 도시정책 등에 따라 다양하다. 특히, 워터프론트는 도시와 가장 근접한 친수공간으로 단어자체에 도시'라는 개념이 포함되어 있다. 즉 도시가 큰 강이나 바다, 호수 등과 접하고 있는 공간을 말한다. 우리나라는 도시계획차원에서 도시 수변공간(urban waterfront)으로 설정하고, 레크레이션, 공원, 경관형성, 환경오염 저감, 정서함양, 생산 등의 다양한 기능을 갖고 있는 매우 공공성이 높은 도시지역의 주요 공간지역으로 의미를 부여하고 있다. 그러나 워터프론트를 개발계획을 수립하는 과정에서 교통계획, 홍수 등의 재해시설, 환경 등에 대한 평가가 제대로 이루어지지 않고 있으며(한국일보, 2011), 개발 계획 추진은 주민 공감대 형성, 사업타당성 검토 없는 '밀어부치기식' 개발 지상주의로 전락하고 있다. 따라서 본 연구는 국내 워터프론트 개발사업 계획을 추진하고 있는 지역으로 인천 송도지역과 부산의 수산시장으로 유명한 자갈치시장 일대의 개발계획, 마산 도시재생지구의 항만 재개발계획 사례를 분석하여 개발계획의 문제점과 언론상에 비춰지는 개발의 현 실태, 지역개발의 효과 등에 대한 시사점을 도출하였다. 사례지역을 비롯한 대부분의 기존 워터프론트 개발은 경제성을 위해 규모가 큰 상업시설 위주로 개발이 이루어지고 있으며, 주거시설이나 문화시설을 비롯한 다양한 시설의 구성이 부족한 특수성을 갖추어 가고 있다. 또한, 기존의 유휴공간을 재개발하면서 도시와의 관계를 제대로 설정하지 못하여 도시와 분리된 폐쇄공간으로 개발이 이루어지고 있으며, 도시구조에 통합되지 못하고 있는 실정이다. 무엇보다 워터프론트 개발사업에 관계된 여러 집단들, 즉 중앙정부, 지방자치단체, 개발주체, 시민 등 이들 사이에 합의 도출의 어려움이 많아 좋은 계획안이 무산되거나 사업이 지체 혹은 중단되는 사례가 많았다. 워터프론트 개발에 대한 지역민사회의 충분한 공감대가 결코 형성되지 않았음에도 오히려 요식적 여론수렴 절차를 강조하고 있으며, 친환경적 도시개발이라는 사업의 목적과 맞지 않는 계획이 많았다. 특히, 관련 사업 중 항만재개발사업에는 막대한 초기 투자비가 소요되어 재개발사업을 위한 자금의 확보가 어려운 경우가 많이 있었으며, 도시의 장기발전계획과 통합된 장기적인 개발전략이 필요한데 이를 소홀히 하는 경우가 있었다. 본 연구를 통해 기존 워터프론트 개발계획의 문제점과 향후 정비계획이 추구해야 하는 친수구역의 관리방법, 주민참여 방안의 대안제시가 이루어 질 수 있었으며, 이를 바탕으로 국내 친수공간 정비계획을 재 고찰 할 수 있는 기회가 되었으면 한다.

  • PDF

Cost Allocation of River Water Quality Management Considering Development in Upper Basin and Total Pollution Load Management System (상류지역 개발과 오염총량관리제를 고려한 하천수질관리 비용분담 방안)

  • Yeo, Kyu-Dong;Kim, Gil-Ho;Jung, Young-Hun;Lee, Sang-Won
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.822-822
    • /
    • 2012
  • 본 연구는 상류의 개발행위와 더불어 현재 수질관리의 기준이 되는 오염총량관리제를 대상으로 '규모의 경제'의 논리를 따른다는 가정 하에, 지자체간에 협조를 통해 비용을 절감하여 서로 혜택을 볼 수 있도록 상 하류 지자체와 중앙정부 등 관련 당사자들 간의 비용배분 방안을 도출하는 것을 목적으로 하였다. 이를 위해서 광주광역시에 위치한 평동산업단지와 영본B, 영본C를 대상으로 광주, 전남, 중앙정부를 이해당사자로 하여 협조적 상황 하에서 대상 비용배분 문제를 정의하였고, 협조적 게임이론에 근거한 SCRB법 및 샤플리법을 적용하여 비용배분 결과를 제시하였다. 우선 광주와 전남이 각각 삭감해야 할 오염량을 산정하고, 해당 삭감량 만큼 처리하기 위한 하수처리시설의 규모를 설정하였다. 또한 하수처리시설의 건설비와 하수관거 공사비, 유지관리비를 산정하였으며, 하수처리시설의 내용연수인 20년간의 총비용을 2010년 현재가치 기준으로 산정하였다. 상 하류 지자체가 공동으로 대처할 경우 20년간 총비용은 416,311.8 백만원, 개별로 대처할 경우 464,439.6 백만원이며, 공동 대처가 42,359.3 백만원이 절감되므로 양 지자체 모두 협조적 게임에 응할 기본배경은 성립되었다. SCRB법에 의한 지자체별 비용배분율을 산정 결과, 광주 74.24%, 전남 25.76%로 산정되었으며, 2001~2010년 하수도 세입현황을 기준으로 중앙정부의 지원 비율은 10년간 최소 23.98%, 평균 29.22%, 최대 34.17%로, 각각의 비율별로 중앙정부, 광주, 전남의 비용분담액을 도출하였다. 본 논문에서는 개략적으로 비용을 산정하였으나 오염총량관리 사업은 막대한 예산을 필요로 하기 때문에 실제로 두 지자체가 협조하여 비용배분을 하게 된다면 하수처리시설의 수질개선효과, 하수처리시설 위치선정, 사업비용 등을 세밀하게 분석해야 할 것이다. 본 논문은 오염총량관리제에서 제시하는 목표수질을 대상으로 하였으나, 지자체의 정책에 따라 친수활동 증대와 생태 자연환경 개선 등과 같은 수질개선에 따른 간접적인 효과를 고려하여 오염 총량관리제의 목표수질보다 더 나은 수질을 원할 수도 있을 것이다. 협조적 게임의 상황을 복잡하게 하여 해결 가능성이 낮아질 수 있으나, 수질개선에 의한 다양한 효과를 편익으로 산정할 수 있다면 이를 협조적 게임에 적용하여 전반적인 수질개선에 대한 지자체의 적극적 활동을 유도할 수도 있을 것이다.

  • PDF

The Study of the Influence on Long Term Streamflow Caused by Artificial Storage Facilities Based on SWAT Modeling Process (SWAT모형을 이용한 인공저류시설물의 하류장기유출 영향분석 기법에 관한 연구)

  • Shin, Hyun-Suk;Kang, Du-Kee
    • Journal of Korea Water Resources Association
    • /
    • v.39 no.3 s.164
    • /
    • pp.227-240
    • /
    • 2006
  • In the several decades, various storage facilities have been developed and operated to supply water resource, flood control or environmental preservation etc. Then, how those man-maid storage facilities affect on the downstream water and environment and how the hydrologists can evaluate those features for water resources problem-solving are high-concentrated problems in this field. Most large watersheds in Korea contain various types of artificial facilities such dams, reservoirs, in-land ponds, wetlands etc. But the study to develop the technology for achieving the effect of the variances and properties of the long term streamflow caused by the artificial storage facilities have been on the simple watershed models and experimental modeling in the real fields. In this paper, we introduce the procedure and methods to consider the above problems based on continuous and semi-distributed featured SWAT model. At the first, we describe the elements and mechanisms of storage facilities in SWAT model to see how we can apply that in proper and appropriate manner for real field problems. Then, we applied the process to a sample watershed, Taewha River basin which covers the most of Ulsan region. Specially, we concentrate on our effort to the effect of upper reservoirs on down stream long term flows based on various scenario basis. The result was described and analysed in spacial and temporal variations on that basin using the precise manner.

Prioritizing the target watersheds for permeable pavement to reduce flood damage in urban watersheds considering future climate scenarios (미래 기후 시나리오를 고려한 도시 유역 홍수 피해 저감을 위한 투수성 포장 시설 대상 유역 우선순위 선정)

  • Chae, Seung Taek;Song, Young Hoon;Lee, Joowon;Chung, Eun-Sung
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.2
    • /
    • pp.159-170
    • /
    • 2022
  • As the severity of water-related disasters increases in urban watersheds due to climate change, reducing flood damage in urban watersheds is one of the important issues. This study focuses on prioritizing the optimal site for permeable pavement to maximize the efficiency of reducing flood damage in urban watersheds in the future climate environment using multi-criteria decision making techniques. The Mokgamcheon watershed which is considerably urbanized than in the past was selected for the study area and its 27 sub-watersheds were considered as candidate sites. Six General Circulation Model (GCM) of Coupled Model Intercomparison Project 6(CMIP6) according to two Shared Socioeconomic Pathway (SSP) scenarios were used to estimate future monthly precipitation for the study area. The Driving force-Pressure-State-Impact-Response (DPSIR) framework was used to select the water quantity evaluation criteria for prioritizing permeable pavement, and the study area was modeled using ArcGIS and Storm Water Management Model (SWMM). For the values corresponding to the evaluation criteria based on the DPSIR framework, data from national statistics and long-term runoff simulation value of SWMM according to future monthly precipitation were used. Finally, the priority for permeable pavement was determined using the Fuzzy TOPSIS and Minimax regret method. The high priorities were concentrated in the downstream sub-watersheds where urbanization was more progressed and densely populated than the upstream watersheds.

Study on Air Entrainment Occurred to Intake Facility of Circular Multi Stage Cylinder Gate (원형 다단 실린더 게이트 형식의 취수시설에서 발생하는 공기연행에 대한 연구)

  • Jang, Yong;Oh, Jun Oh
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.150-150
    • /
    • 2020
  • 본 연구에서는 수리모형실험을 통하여 원형 다단 실린더 게이트 형식의 취수시설에서 발생하는 공기연행을 분석하였다. 수리모형실험의 원형은 경상북도 청도군에 위치한 운문댐의 "운문댐 안전성 강화사업"에서 계획되고 있는 신설취수탑을 기준으로 상사법칙은 Froude상사법칙을 적용하고 1/20의 모형 축척을 가지는 취수탑의 국부모형에 하류단 수위를 고려하기 위해 유량조절시설을 설치하여 실험을 실시하였다. 실험조건은 크게 두 가지로 구분하였으며, 수면으로부터 유입구 상단부까지의 거리 ∆h1(m)과 유입부 저수지 저류 수위와 하류단 유량조절시설간의 수위차인 ∆h2(m)이며, ∆h1에 대한 조건은 0.01m~0.06m로 0.01m 간격으로 6가지, ∆h2에 대한 조건은 0.10m~1.70m로 0.20m간격으로 9가지로 이를 조합하여 총 54개 CASE에 대해 진행하였다. 실험결과 공기연행 발생 시 그에 따른 영향을 평가하기 위해 발생 정도에 따라 미발생(Not Occur), 간헐적(Intermittent), 빈번한(Frequent), 지속적(Continuation), 공기 폭발(Air Explosion)로 분류하였으며, 각 공기연행 발생 시 취수유량의 감소율 및 영향을 분석한 결과 간헐적 공기연행 발생 시 최대 약 3.75%의 취수유량 감소, 빈번한 공기연행 발생 시 취수유량은 전체적으로 10%, 최대 약 13.19% 감소하였으며, 지속적 공기연행 발생 시 발생 이후 ∆h2증가에 의한 취수유량의 증가가 거의 이루어지지 않으며, 최대 56.25%의 취수유량이 감소, 공기 폭발 발생 시 취수유량의 영향은 지속적 발생과 비슷하나 관내 공기 포집 후 유입구로 방출 시 관에 강한 충격을 주어 안정성에도 큰 영향을 미칠 것으로 판단되어, 이에 안정성 및 취수유량 감소율을 고려하여 빈번, 지속, 공기 폭발 발생 영역에서의 취수는 적합하지 않으며, 공기연행 미발생 및 간헐적 발생 영역에서의 취수 시 목표 취수유량이 1.00~4.00(㎥/s)일 때 ∆h1= 0.40m 이상, 4.00~9.30(㎥/s) 일 때 ∆h1= 0.60m 이상, 9.30~9.53(㎥/s) 일 때 ∆h1=0.80m 이상, 9.53~9.65(㎥/s) 일 때 ∆h1= 1.00m 이상에서 취수유량 감소율 3.75% 이내로 취수유량의 확보가 가능하다. 이러한 결과는 원형 다단 실린더 게이트 형식의 취수시설에 대해 취수 시 수면와류에 의한 Air Core와 그에 따른 공기연행의 발생 조건과 영향을 수리모형실험을 통해 확인함으로써 실제 운용 시 보다 안정적이고 효율적인 운용에 대한 자료로 활용될 수 있을 것으로 판단되며, 추가로 수치해석을 통한 비교 및 공기연행과 관내 공기포집 정도에 대한 연구를 통해 보다 정확한 자료제시가 가능할 것으로 판단된다.

  • PDF

Backflow Flow Analysis of Street Inlet drain using Fluent Model (빗물받이 연결관 역류 흐름 해석을 위한 Fluent 모형 적용)

  • Lee, Min Sung;Kim, Jung Soo;Yoo, In Gi;Yoo, Kyu Min
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.245-245
    • /
    • 2022
  • 최근 국내 기후변화에 따른 국지성 집중호우로 인한 시간당 강우량의 증가로 도로부 유출량의 증가와 배수관거에서의 내수배제 불량에 따른 도심지 내수침수 피해가 증가함에 따라 이를 해결하기 위한 우수유출저감시설이 설치되고 있다. 그러나 대단위의 지하 저류시설의 지속적인 설치는 과밀화된 도심지에서 설치 지하공간의 구조적인 한계 및 적정 설치 위치의 미확보 등의 다양한 문제가 발생하여 저류시설의 침수저감 효과에 대한 추가적이고 새로운 저류시설에 대한 연구가 필요한 실정이다. 이에 내수 침수 저감 및 배수 능력 향상을 위한 도로 배수시설과 연계된 도로 측구부 저류시스템 구축이 필요하다. 이를 위해 역류 방지 및 노면수 저류 빗물받이에 적용되는 부력식 역류차단장치를 개발하였으며, 역류차단장치의 최적 형상 개발을 위해서 기존 빗물받이 연결관과의 통수능 비교 및 분석이 필요한 실정이다. 따라서 본 연구에서는 기존 빗물받이 연결관 및 연결관 내에 역류차단장치가 적용된 역류차단 빗물받이의 흐름분석을 위해 Fluent 모형을 이용하여 3차원 수치모의를 수행하였다. 수치모의 구성으로는 전체 형상을 40×50cm의 빗물받이 유입부와 50×50cm의 빗물받이로 결정하고 격자는 빗물받이 내부의 복잡한 3차원 흐름을 모의하기 위해 1.2~2mm 크기로 생성하였다. 다상유동 해석을 위해 VOF(Volume of Fluid)방법을 적용하였고, 수치해석 방법으로는 비정상류, 난류 모형으로는 SST k-𝜔모형을 적용하였다. 해석조건으로는 김정수(2021) 등이 제시한 4차선 기준 설계빈도별(5~30년) 빗물받이 유입유량을 산정하여 빗물받이 유입조건으로 선정하였으며, 빗물받이와 연결관에서의 통수능력 분석 조건으로는 빗물받이에 기존 연결관이 부착된 조건과 연결관 내에 역류차단장치가 설치되어 역류차단장치가 개방된 조건에서의 통수능을 비교하였으며, 역류상황을 가정한 연결관에서의 통수능을 비교하기 위하여 역류차단장치의 개폐정도를 15도(통수단면 33%감소) 닫힌 상태 및 30도(통수단면 67% 감소) 닫힌 상태 조건을 대상으로 빗물받이와 연결관에서의 흐름을 모의하였다. 수치모의 결과 역류차단장치의 계폐조건에 상관없이 5년 빈도유입량 조건에서는 완전 배수가 되었으며, 개폐조건 15도에서는 10년 빈도의 유입량에서는 완전 배수가 되었으나 20년 빈도 이상의 유입량 조건에서 빗물받이 유입부로의 역류가 발생하였으며, 개폐조건 30도에서는 5년 빈도 이상 유입량 조건에서 빗물받이 유입부로 역류가 발생하는 것으로 나타났다. 특히, 30년 빈도 이상의 유입량부터는 빗물받이 연결관 내에 역류차단장치 개페조건과 관계없이 빗물받이 유입부로의 역류로 인한 도로 침수가 발생하기 때문에 유휴공간인 도로 측구부를 저류공간으로 활용할 수 있는 도로 측구부 저류시스템의 구축은 필수적이라고 판단되며, 유량 조건에 따른 빗물받이 내부 와 흐름과 유출부에서의 유속 변화 특성을 확인하였다. 그러므로 측구 저류조 개발 형상과 연결한 3차원 흐름의 구현 및 분석에 Fluent 모형의 적용이 가능하다고 판단된다.

  • PDF

Numerical Analysis of Flow around Bridge Pier using FLOW-3D (FLOW-3D를 이용한 교각주변 흐름의 수치해석)

  • Kim, Chang-Sung;Kang, Joon-Gu;Yeo, Woon-Kwang
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.953-958
    • /
    • 2005
  • 최근 들어 다양한 산업에서 3차원 수치해석을 이용하는 영역이 넓혀지고 있다. 국내에서도 3차원 수치해석을 이용하여 댐이나 정수처리시설 설계 등 수리분야에 적용하였고, 점점 그 이용이 확대되고 있다. 특히 교량 및 수제 등의 수공구조물로 인한 주변 흐름형상은 2차원 해석이 불가능하여 현재 수리모형실험을 통한 해석이 주를 이루고 있다. 이에 본 연구에서는 현재 3차원 수치해석에 많이 이용되는 상용모델인 FLOW-3D를 이용하여 3차원 흐름에 대한 수치해석을 수행하였으며 수리모형 결과와 비교하여 적용성을 검토하였다. 그 결과 모의 및 실험결과 수리모형과 수치모의 결과는 서로 비슷한 흐름양상을 보이고 있었다. 또한 조도계수(Roughness)를 매개변수로 하여 다양한 상태에서의 FLOW-3D의 민감도를 검토하였으나 실제 흐름과는 상이함을 보였다 또한 다양한 난류모형을 적용하여 그 결과를 실제 흐름과 비교해보았다. 그 결과 3차원모형에서는 교각 후면부와 좌, 우측면부에서의 흐름이 실제 수리 모형과는 상이한 결과를 보이는데 이는 FLOW-3D의 벽 경계 및 와류에 대한 난류모델에 따른 수치해석적인 차이로 사료된다.

  • PDF

Preparation of the Inundation Map Using 1-Dimensional Pond Model (1차원 Pond모형을 이용한 예상침수지도 작성)

  • Yoon Jae Young;Moon Young Ju;Jang Su Hyung;Yoon Yong Nam
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.163-167
    • /
    • 2005
  • 하천변 저지대를 HEC-RAS의 저류지(Storage) 기능을 사용하여 모형화 하고 자연배수시설과 배수펌프장을 모의할 수 있는 기능에 의해 하도와 연결한 후 1차원 부정류해석을 수행하였다. 그 결과 유역에서 저지대로 유입한 홍수량과 저지대에서 하천으로 배제되는 홍수량의 차이를 산정하여 내수침수를 유발하는 저류량과 침수위을 결정할 수 있었으며, 이렇게 결정된 저류지의 시간대별 침수위를 저지대의 표고와 비교함으로써 침수지역을 식별하고 침수심별로 상이한 형태의 시각정보로 변환하여 시간대별 침수심별 예상침수지도를 작성하였다. 본 모형을 삽교천 유역에 적용한 결과 실제 발생한 홍수사상의 특성을 잘 재현하여 상기한 정보들이 충분한 활용가치가 있는 것으로 평가되었다.

  • PDF