• Title/Summary/Keyword: 수요-공급 곡선

Search Result 131, Processing Time 0.036 seconds

A Study on the Serial-Parallel Resonant DC/DC Converter for Contactless Power Supply System (비접촉 전원장치에 적용한 직.병렬 공진 DC/DC 컨버터에 관한 연구)

  • Hwang, Gye-Ho;Lee, Bong-Sub;Kim, Dong-Hee
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.5
    • /
    • pp.31-40
    • /
    • 2008
  • Recently, Contactless Power Supply(CPS) system has been broadly studied as a power supply system for Flat Panel Display(FPD) material transfer equipments. In mass production line, CPS systems on material transfer equipment are applied only in the straight sections with single operating vehicle. The formal CPS system was not adequate for curved section nor multiple operating vehicles. Therefore, this paper presents CPS system that consists of straight and curved section with multiple operation vehicles. The circuit topology of CPS system consists of full bridge configured serial-parallel resonant DC/DC converter. The control method for CPS system consists of duty control method on the primary power supply system to maintain constant resonant current. And the secondary power supply systems of multiple vehicles are self controled to maintain constant output voltage. Practically, the test result of dual vehicles on straight and curved section of material transfer equipments were satisfactory, and proved it's applicability on commercial use.

Analysis on Economics and Security of Korean Generating Mix (우리나라 전원믹스의 경제성 및 공급안정성에 관한 연구)

  • Ok, Ki-Youl;Kim, Yong-Joon;Kim, Sang-Ju
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.826-827
    • /
    • 2007
  • 우리나라의 현행 전원믹스는 경제성의 측면에서 상당히 왜곡된 것으로 언급되고 있으며, 전력시장의 기저발전기에 대한 규제상한 가격은 이를 간접적으로 입증하는 근거라 할 수 있다. 균등화 발전원가를 이용하여 장기한계비용을 도출하고, 이를 부하지속곡선에 대입하여 산출한 경제적 전원믹스은 원자력 발전용량의 대폭적인 증가의 필요성을 보여준다. 이는 원전이 기저전원으로 경제성을 가지는 측면이 있지만 무엇보다도 우리나라의 높은 부하율(편평한 부하지속곡선)에 기인하고 있다. 이산화탄소 배출비용의 부과는 원전의 경제적 우위를 확장시키는 반면 전원다변화를 현격하게 축소시키는 결과를 가져와 정책목표간 조율이 필요함을 시사한다. 균등화 발전원가는 전력시장체제의 가격 및 수익에 대한 리스크를 효과적으로 반영하지 못하므로 포트폴리오 이론 및 실물옵션 이론 등을 활용한 경제성 평가방법론의 개발이 향후 과제로 제기된다.

  • PDF

As 공급 조건 변화에 의한 InAs 양자점의 광학적 특성

  • Choe, Yun-Ho;Ryu, Mi-Lee;Jo, Byeong-Gu;Kim, Jin-Su
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 2012.02a
    • /
    • pp.297-297
    • /
    • 2012
  • 양자점은 공간적으로 세 방향 모두 전하의 운동을 제한하는 0차원 구조로 불연속적인 상태 밀도를 가진다. 이런 양자점의 특성은 광통신용 소자, 레이저 다이오드 등과 같은 광학 및 전자 장치에 응용될 수 있기 때문에 많은 주목을 받아 활발히 연구되어 왔다. 본 연구에서는 MBE 장비를 이용하여 GaAs 기판위에 InAs 양자점을 성장시키는 동안 As의 공급을 임의로 차단시켜 양자점 형성 조건을 변화시킨 시료들의 광학적 특성을 Photoluminescence (PL) 와 Time-resolved PL (TRPL) 실험을 이용하여 분석하였다. GaAs (001) 기판 위에 GaAs buffer layer를 $610^{\circ}C$에서 성장한 후, $470^{\circ}C$에서 As 공급 조건 변화에 따른 InAs 양자점을 성장하였다. 양자점을 성장한 후 GaAs cap layer를 $610^{\circ}C$에서 성장하였다. InAs 양자점 시료들은 In을 20초 공급하는 동안 As의 공급과 차단을 각각 1초, 2초, 3초의 일정한 간격으로 반복하였다. 10 K에서 각각의 시료들의 PL을 측정한 결과 As 공급과 차단을 2초씩 반복한 T2시료에서 PL 세기가 가장 좋게 나타났으며, 3초씩 반복한 T3시료에서 가장 나쁘게 나타났다. PL 피크는 공급과 차단을 1초씩 반복한 T1 시료가 1.23 eV, T2 시료가 1.24 eV, T3 시료가 1.26 eV에 나타났으며, As의 차단시간이 증가함에 따라 PL 피크가 높은 에너지로 이동함을 보였다. 발광파장에 따른 PL 소멸은 파장이 증가함에 따라 점차 느려지다가 PL 피크 근처에서 가장 느린 소멸곡선을 보이고, 파장이 더 증가하였을 때 점차 빠르게 소멸하였다. As 공급 조건의 변화에 따라 InAs 양자점의 크기와 밀도, 모양 등이 변하는 것을 Atomic Force Microscope (AFM) image를 통하여 확인하였으며, PL과 TRPL을 이용하여 InAs 양자점의 광학적 특성을 분석하였다.

  • PDF

Analysis of Burst Detection Based on Adjustable Sampling Interval (가변적 샘플링 기반한 누수탐지 분석)

  • Kim, Seong Won;Jeong, An Chul;Jung, Kwan Sue
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.292-292
    • /
    • 2015
  • 최근 상수관망의 물 공급 과정에서 여러 가지 원인으로 인해 물의 손실에 따른 비용손실이 발생하고 있다. 급수시스템의 경우에는 파열 및 누수발생과 관련되어 사용되는 비용은 분실되는 물의 직적비용, 급수시스템 수리에 따른 공사비용, 공급중지와 관련된 사회적 비용이 있다. 파열 및 누수를 신속하게 감지하는 것은 물 손실에 의해 발생하는 직접 및 간접비용을 줄일 수 있다. 그러나 국내의 경우 정기적으로 매년 1회 시행되는 상수관로에 대한 누수탐지작업으로 신속한 감지 및 즉각적인 대처를 할 수 없는 실정이다. 본 연구에서는 수도관에서 발생되는 파열 및 누수를 탐지하기 위하여 블록 유입부에 설치된 유량계의 샘플링 간격의 영향에 대한 연구를 실시하였다. 적응칼만필터 알고리즘을 이용한 가변 샘플링 간격은 최대 최소 샘플링 간격과 정규화된 잔차의 상한값과 하한값 도입하여 제시하였다. 샘플링 간격의 효과를 강조하기 위해 사인 곡선, 사다리꼴 파열, 불규칙 잡음으로 구성된 가상의 유량 데이터로 알고리즘에 대한 검증실험을 진행하였고 실험 결과 샘플링 간격이 길수록 긴 시간 동안 누수 및 파열에 대한 작은 잔차를 발생시켰다. 모의실험결과 샘플링 주기를 변경함으로써 분석에 필요한 유량 데이터의 샘플수를 크게 줄일 수 있었다.

  • PDF

A Study on the Plasma Characterization of Semiconductor Bridge (반도체 브릿지의 플라즈마 특성 연구)

  • 이응조;장석태;장승교
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.2 no.2
    • /
    • pp.1-13
    • /
    • 1998
  • When driven with a short (less than 30$\mu\textrm{s}$) low-energy pulse, the semiconductor bridge(SCB) produces a hot plasma that ignites explosive. The shape of plasma was observed using ultra high speed camera, the generation and the duration time of plasma were estimated by analyzing the ultra high speed camera image. The more energy supplied, the sooner the formation of the plasma was, and the size of the plasma was increased in proportion. The voltage variation of the bridge was measured and analyzed by comparing with the ultra high speed camera image.

  • PDF

A Study on Water Demand Forecasting Methods Applicable to Developing Country (개발도상국에 적용 가능한 물수요 예측 방법 연구)

  • Sung-Uk Kim;Kye-Won Jun;Wan-Seop Pi;Jong-Ho Choi
    • Journal of Korean Society of Disaster and Security
    • /
    • v.16 no.4
    • /
    • pp.75-84
    • /
    • 2023
  • Many developing countries face challenges in estimating long-term discharge due to the lack of hydrological data for water supply planning, making it difficult to establish a rational water supply plan for decision-making on water distribution. The study area, the Bandung region in Indonesia, is experiencing rapid urbanization and population concentration, leading to a severe shortage of freshwater. The absence of water reservoir prediction methods has resulted in a water supply rate of approximately 20%. In this study, we aimed to propose an approach for predicting water reservoirs in developing countries by analyzing water safety and potential water supply using the MODSIM (Modified SIMYLD) network model. To assess the suitability of the MODSIM model, we applied the unit hydrograph method to calculate long-term discharge based on 19 years of discharge data (2002-2020) from the Pataruman observation station. The analysis confirmed alignment with the existing monthly optimal operation curve. The analysis of power plant capacity revealed a difference of approximately 0.30% to 0.50%, and the water intake safety at the Pataruman point showed 1.64% for Q95% flow and 0.47% for Q355 flow higher. Operational efficiency, compared to the existing reservoir optimal operation curve, was measured at around 1%, confirming the potential of using the MODSIM network model for water supply evaluation and the need for water supply facilities.

Estimation of Reservoir Area and Capacity Curve Equation using UAV Photogrammetry (무인항공기 사진측량에 의한 저수면적과 저수량 곡선식 산정)

  • Lee, Geun Sang;Choi, Yun Woong;Lee, Suk Bae;Kim, Seok Gu
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.24 no.3
    • /
    • pp.93-101
    • /
    • 2016
  • Reservoir area and reservoir capacity must be evaluated for reservoir management such a water supply, water-purity control and so on. In this paper, the reservoir area and reservoir capacity according to the level of storage range of water(149~156 El.m) could be calculated by using TIN data model of study area, Gyoyeon reservoir, TIN data model was made of DSM which was created by using UAV and GCP survey. From the results of applying the various functions to reservoir area and capacity, reservoir area and reservoir capacity according to the level of storage range of water showed the highest coefficient of determination of 0.97 in fourth-order polynomial, and 0.99 in second-order polynomial, respectively. Thus, it could be expected the efficient reservoir management by estimating reservoir area and capacity curve equation through UAV photogrammetry.

Long-term Prediction of Dam Sedimentation Using Sluicing Efficiency Curve and Dam Operation Technique (배사비 효율곡선 및 댐 운영기법을 이용한 퇴사량 장기 예측)

  • Lee, Gwang-Man
    • Journal of Korea Water Resources Association
    • /
    • v.31 no.1
    • /
    • pp.95-103
    • /
    • 1998
  • Dam sediment can be predicted from the two methods: the one is a physical analysis based on the hydrjulic mechanism and the other is an empirical approach using observed data as a design factor. The former can be used to estimate short-term phenomena by mathematical methods. the latter can be used for deriving long-term design parameters such as dead storage calculation. Monthly reservoir operation is possible with the sluicing efficiency curve based on empirical data. The optimal sediment management can be carried out using the information variable which traces deposit sediments corresponding to the reservoir storage. The idea can provide an optimal operation strategy to save effective storage varying with time. This study presents a methodology for the long-term sediment prediction using sluicing efficiency curve. An application is conducted for estimating accumulated sedment deposit and water supply capability ofr the Fenhe dam in the Yellow rever of China.

  • PDF

River Discharge Measurement and Analysis for Nakdong-River Basin in 2006 (2006년 낙동강 유량측정 및 유출특성 분석)

  • Lee, Ki-Sung;Kim, Ji-Chan;Song, In-Ryeol;Kim, Hyoung-Seop;Jung, Sung-Won
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.1808-1813
    • /
    • 2007
  • 하천유량은 수자원계획, 댐개발, 용수공급, 하천수질관리 등에 필요한 수자원 기본자료로서 정확도에 따라 국가 수자원계획이 좌우될 수 있는 중요한 자료이다. 본 연구는 낙동강 유역을 대상으로 7개 지점에 대한 2006년의 수문관측 자료 및 유량측정성과를 이용하여 유출특성을 분석하였다. 2006년도 낙동강 유역의 유량측정 지점 중 낙동강 본류에 해당하는 7개 지점에 대한 현장 유량측정 수행결과와 유량측정성과에 대한 수리특성 분석, 불확실도 분석 및 수위-유량관계곡선식을 개발하여 유량을 산정하였다. 산정된 유량에 대한 상 하류 유출 검토, 댐방류량과의 비교, 연유출률 검토, 주요 호우사상별 직접 유출률 검토, 평 저수시 동시유량 검토 등을 통하여 각 지점의 최종 유량을 확정하였다. 산정된 유출률은 대체로 양호한 결과를 보였으며, 부분적으로 계기수위가 불안정했던 지점들을 제외한 나머지 지점들의 유출률은 그 지점들의 특성을 감안할 경우 비교적 안정적인 범위 내의 유출특성을 보였다. 2005년도 유출률과 비교해 보면 전체적으로 다소 높게 나타났으나, 올해 장기간 집중된 강우 특성을 고려한다면 적절한 유출범위를 보인 것으로 판단된다. 향후 전문인력에 의한 현장 측정과 일상적인 검증과정을 통해서 정밀한 유량측정성과를 확보한다면, 보다 신뢰성있는 유량자료를 생산할 수 있을 것이며, 효과적인 치수 및 이수계획의 수립 등 수자원 개발을 위한 기반을 마련할 수 있을 것이다.

  • PDF

A study on the Upstream and downstream relationships through water balance analysis in the Mangyeong River basin (만경강 유역의 물수지 분석을 통한 상하류 관계 검토)

  • Jung Hoon Lee;Jun Su Park;Seung Hyun Kim;Jae Il Lee
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.283-283
    • /
    • 2023
  • 만경강은 전라북도 북부를 남서쪽으로 흐르는 하천으로 유로연장 80.86km, 유역면적 1,504.35km2에 이르며 유로는 영산강에 이어 6번째, 유역면적은 안성천, 삽교천에 이어 8번째에 해당하는 하천이다. 만경강은 금강, 동진강 등과 함께 호남평야의 중앙을 서쪽으로 흐르며 호남평야에 농업용수를 공급하고, 전주시와 완주군, 김제시에 공업용수를 공급하는 중요한 하천 중 하나이다. 만경강 상류에는 대아저수지, 경천저수지 등 다수의 농업용 저수지가 설치되어 있으며, 농업용수 공급을 위한 다수의 취입보와 양수장이 설치·운용되고 있다. 만경강 중상류에서 위치한 취입보 중 가장 큰 비중을 차지하고 있는 것은 완주군(오성교)관측소와 완주군(용봉교)관측소 사이에 위치한 어우 취입보로 최대 허가량은 약 10m3/s이며, 연간 취수량은 약 1억 4천만톤이다. 어우 취입보에서 취수한 용수는 대간 도수로를 통해 새만금간척지까지 농업용수를 공급한 후 완주군(삼례교)관측소 하류에 위치한 비비정 배수갑문을 통하여 만경강으로 회귀한다. 어우 취입보의 영향으로 인하여 만경강 중상류에 위치한 3개의 관측소(완주군(오성교), 완주군(용봉교), 완주군(하리교))는 비정상적인 상하류 관계가 발생하고 있다. 만경강은 이와 같은 다수의 취입보와 양수장 운영으로 상하류 역전이 발생하고 있으나, 유역 내 물수지 분석을 통해 실제 취수량 등을 고려할 경우 농번기에도 정상적인 상하류 관계가 발생하는 것을 확인할 수 있다. 따라서 본 연구에서는 만경강에 위치한 저수지 3개소(경천저수지, 용담댐, 대아저수지)의 방류량과 고산정수장의 회귀수 자료, 어우 취입보에 설치된 자동유량자료 및 취입보(7개소)의 허가량과 취수량 자료를 확보하여 물수지 분석을 실시하였다. 또한, 만경강 중상류에 위치한 관측소의 2022년 개발된 수위-유량관계곡선식을 활용하여 환산유량을 산정하였으며 물수지 분석을 실시하여 상하류 검토와 누가유출 및 유출률을 검토한 결과 상하류 관계가 비교적 안정적인 것으로 확인되었다.

  • PDF