BIM-based Repair&Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 프로세스)

  • Park, Jieun;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.31-38
    • /
    • 2016
  • In a construction project, the portion for maintenance costs for a building is considerable compared to the initial construction cost. As such, Life Cycle Cost (LCC) analysis is being increasingly utilized to assess the design value of engineering work in Korea. Additionally, the Public Procurement Service in Korea announced that it will be mandatory for all domestic construction projects to adopt BIM. Furthermore, the paradigm for architectural design has shifted from 2D to 3D, and to BIM, which includes a data management system. Within this background, however, there is currently no adequate BIM-based LCC analysis software and the requirements of cost estimation for repair and replacement cost for a building is not completely adequate in BIM tools such as Revit and Archicad. Therefore, this study suggests a process of cost estimation for repair and replacement (R&R) cost based on IFC data. First, we analyzed existing R&R criteria and defined BIM-based requirements when calculating R&R costs. These requirements were extracted from relevant IFC data. Subsequently, this was saved to a database and a BIM-based database was built for R&R cost estimation. Finally, this database was connected with external databases such as R&R Criteria DB and Cost Information DB to calculate R&R costs. This process is expected to improve upon the traditional process of cost estimation of R&R cost by applying a BIM model. The proposed process can contribute to a further standardizing of BIM-based LCC analysis thru application to initial construction costs, energy costs, and other maintenance costs.

Suggestion of an Automatic BIM-based Repair & Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 자동화방안 제시)

  • Park, Ji-Eun;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.87-88
    • /
    • 2016
  • In order to assess the design value of engineering work from the point of view of LCC (Life Cycle Cost) in Korea, it is mandatory for all construction works that the total construction costs are over 10 billion won. The LCC includes initial construction costs, maintenance & operation costs, energy costs, end-of-life costs, and so on. Among these, the portion for maintenance & operation costs for a building is sizeable, as compared to the initial construction costs. Furthermore, the paradigm for construction industry has rapidly shifted from 2D to BIM, which includes design planning and data management. However, the study of BIM-based LCC analysis is not adequate today, even though all domestic construction projects ordered by the Public Procurement Service have to adopt BIM. Therefore, this study suggests a methodology of BIM-based LCC analysis that is particularly focused on repair and replacement (R&R) cost. For this purpose, we defined requirements of calculating R&R cost and extracted X from the relevant IFC data. Thereafter, we input them to the ontology of calculating the initial construction costs to obtain an objective output. Finally, in order to automatically calculate R&R cost, mapping with R&R criteria was performed. We expect that our methodology will contribute to more efficiently calculate R&R cost and, furthermore, that this methodology will be applicable to all range of total LCC. Thus, the proposed process of automatic BIM-based LCC analysis will contribute to making LCC analysis more fast and accurate than it is at present.

  • PDF

A Life Cycle Cost Case Analysis on the Build-Transfer-Lease(BTL) Projects of School (학교 임대형민자사업(BTL)의 LCC 사례 분석)

  • Cho, Seung-Yun;Ahn, Jang-Won;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.145-150
    • /
    • 2007
  • This study is a LCC case analysis on the school one of the BTL projects which is constructed by private organizations and rented to government. According to the RFP to make out documents, it is performed the case analysis based on the results of LCC calculation about maintenance & conservation costs; repairing costs and replacement costs. It is analyzed LCC on maintenance & conservation costs for 20 years(rent period) and 65 years(life cycle). As a result of LCC analysis, about more than 50% of total LCC are architectural works and the rest of them are machinery works, electric works, and civil works in the order. And it is also suggested some problems and their solutions to perform LCC analysis on the current BTL projects of school.

  • PDF

An Uncertainty Analysis of Calculating Life Cycle Maintenance and Energy Costs for Technical Proposals (기술제안입찰을 위한 유지관리 및 에너지 비용 산출방식의 불확실성 분석)

  • Chung, Sung Young;Kim, Sean Hay
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.3-9
    • /
    • 2018
  • Although Life Cycle Cost (LCC) must be evaluated by experts, sometimes it may not allow a sufficient time for even the experienced LCC expert to make rational decisions. Therefore, it often ends with relatively comparing the final numbers. We have broken down 110 technical proposals that are actually bade and accepted for large construction projects, and then have analyzed the uncertainty of Maintenance and Energy (M&E) cost during building life cycle, which turns out be the most volatile factor in uncertainty of LCC. Also we suggest "Value Engineering Index (VEI)" - the reduced M&E cost that is normalized by the reduced first cost. It is analyzed that the most uncertain factors of the M&E cost include repair and replacement term differing from each project, duplicated repair and replacement, non-standard repair items, and site-specific energy cost. Eventually we propose a VEI population with a mean of 1.38 and a standard deviation of 1.19, which is obtained by individually and exclusively applying the uncertain factors of the M&E cost to the 35 standard sample of technical proposals. The LCC evaluators may be able to use the VEI population as the benchmark to select the technical proposal with the most reasonable LCC among many others in two suggested manners; the one is to deterministically calculate the probability of single VEIs, and the other is to stochastically calculate the probability of the VEIs where uncertainty is quantified.

A Study on the LCC Analysis of an Office Building HVAC System (오피스빌딩 냉난방시스템의 수명주기비용 분석에 관한 연구 : 흡수식 냉온수 유닛의 설치 유형을 중심으로 한 사례연구)

  • Park, Moon-Sun;Shin, Hyeong-Sik;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.112-121
    • /
    • 2006
  • The purpose of this study is to execute economical analysis for two types of office building HVAC system using LCC technique : single vs, separated HVAC(equal partition installation, unequal partition installation) system. The research method of this study includes the case analysis and questionnaire surveys. The results of this study are as follows: (1) LCCs of 3 types of HVAC system are estimated and the most economical one is investigated as single HVAC system, (2) In this case study, the single HVAC system was investigated as 34% lower in LCC during 15 years per $100m^2$ compared to equal partition installation, as 41% compared to unequal partition installation.