A Screening Procedure for the Development of Small-Scale Hydropower (소규모(小規模) 수력발전(水力發電) 개발(開發)을 위한 스크린 방법(方法))

  • Shim, Myung Pil
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.5 no.4
    • /
    • pp.129-139
    • /
    • 1985
  • Small-scale hydropower systems offer several advantages compared to other alternatives as an important source of energy in both developed and developing countries. This study proposes systematic criteria for screening of small-scale hydropower sites to determine their potential for farther study, and demonstrates the general procedure. These criteria are based on the physical characteristics of the sites and their social, environmental and economic aspects. The procedure presented shows great flexibility for screening based on the availability of information and situation at the site.

  • PDF

Introduction of the Best Practices in the Pakistan Gulpur HEPP (파키스탄 Gulpur 수력발전 현장의 Best Practices 소개)

  • JANG, Ock Jae;HONG, Won Pyo;CHAE, Hee Moon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.216-217
    • /
    • 2022
  • Gulpur 수력발전 프로젝트는 전력난을 겪고 있는 파키스탄에 102 MW 규모의 수력발전소를 건설하여 30년 동안 운영 관리한 후 파키스탄 정부로 양도하는 IPP(Independent Power Producing) 형식의 투자사업이다. 남동발전과 DL E&C, 롯데건설이 Sponsor로서 출자한 자본금과, ADB, IFC, K-EXIM 등의 대주단로부터의 차입금을 재원으로 하여 소요 사업비를 조달하고 사업을 개발하였다. DL E&C와 롯데건설이 EPC(Engineering, Procurement, Construction)를 수행하였고, 이산이 Design consultant의 역할을 수행하였다. Gulpur 수력발전 프로젝트의 발전형식은 수로식(run-of-river)으로 201 m3/s의 발전유량과 102 MW의 발전 시설용량을 이용하여 연평균예상발전량은 398 GWh이다. 주요 구조물로는 설계 재현빈도 1년의 유수전환시설(가물막이댐 & 가배수터널)과 콘크리트 중력식댐(H 67 m, L 205 m), 도수터널(D 6.7 m, L 215 m, 2기), 옥외형 발전소 (H 51 m, W 60 m, L 38 m, Kaplan 2기)가 있으며, 2015년 10월 착공하여 2020년 3월 상업발전을 시작하였다. 본 프로젝트는 DL E&C의 첫 번째 EPC 해외수력발전 프로젝트이다. 따라서 프로젝트의 성공적 수행을 위한 경제적 설계, 시공의 효율성 및 안정성 확보 등을 위하여 많은 연구를 수행하는 과정에서 다양한 기술 개선을 이룰 수 있었다. 본고에서는 Gulpur 프로젝트를 통하여 도출된 성공 사례들을 소개 및 공유하고자 한다. 첫 번째로 콘크리트 중력식댐 시공을 위한 유수전환시설의 최적 설계빈도를 산정하였다. 일반적으로 유수전환시설의 규모는 설계기준에 제시된 설계 재현빈도를 이용하는데, 해외 설계기준에서는 10년, 국내 설계기준에서는 1~2년으로 다르게 제시되어 있는 문제점이 있다. 유수전환시설의 규모는 프로젝트의 경제성에 큰 영향을 미치기 때문에 최적 설계빈도의 결정이 필요하며, 위험도분석기법(Risk Analysis)과 기대화폐가치법(Expected Monetary Value)을 이용하여 유수전환시설의 최적 설계 재현빈도와 이에 영향을 미치는 인자를 분석하였다. 위험도는 몬테카를로 시뮬레이션으로 산정된 가물막이댐 파괴확률과 재현빈도를 이용하여 산정된 가물막이댐 월류확률을 고려하였으며, 비용 및 피해액으로는 유수전환시설의 공사비, 가물막이댐 파괴시의 재건설비용과 지체보상금, 가물막이댐 월류시의 복구비용을 고려하였다. 이에 대한 연구결과로, 유수전환시설의 사용기간과 월류시의 복구비용이 유수전환시설의 설계 재현기간 결정에 가장 큰 영향을 미치는 것으로 나타났고, 특히 월류시의 복구비용이 작을수록 낮은 설계 재현빈도를 선택하는 것이 타당한 것으로 나타났다. 예를 들어, 유수전환시설의 사용기간이 3 ~ 5년, 복구비용이 0.5 ~ 1.0 mil USD 이하인 조건에서 가물막이시설의 최적 설계빈도는 1년 ~ 2년인 것으로 나타났다. 또한, 유수전환시설의 사용기간은 본댐의 규모와 시공기간 등을 고려하여 결정되는 사항으로 설계자가 임의 조정할 수 없지만, 복구비용은 시공 관리자에 따라 결정되는 부분으로, 적극적 홍수 피해 저감 및 복구방안을 마련하는 것이 프로젝트의 경제성을 향상시킬 수 있다는 것을 알 수 있었다. 두 번째로 프로젝트의 경제성 향상, 홍수기 댐 시공시의 안전성 확보를 위하여 홍수 조기경보시스템(Early Warning System)을 개발 및 활용하였다. 수로식(Run-of-river) 수력발전댐은 대부분 산악지역에 위치하기 때문에 국지성 강우 및 급한 지형 경사로 인하여 돌발홍수(flash flood)의 발생 가능성이 높다. 따라서 시공 중 홍수(월류) 발생을 미리 감지하고 현장에 전파할 수 있는, 수로식(Run-of-river) 수력발전댐 현장을 위한 홍수 조기경보시스템이 필요하며, 이를 리스크 인식, 모니터링 및 경보, 전파 및 연락, 반응 능력 향상의 4가지 부분으로 나누어 구축하였다. 리스크 인식 부분에서는 가물막이댐 월류 발생 상황에 대한 위험도, 취약성, 리스크를 제시하였으며, 모니터링 및 경보 부분에서는 상류 측정수위에서 유도된 현장 예상수위와 실제 현장 측정 수위를 대상으로 경보홍수위와 위험홍수위로 나누어 관리하였다. 전파 및 연락 부분에서는 현장 시공 조직을 활용하여 홍수시를 대비한 비상연락체계도(Emergency communication flow chart)를 운영하였으며, 반응 능력 향상을 위해 비상연락체계도의 팀별 Action plan을 상세화 하였다. 세 번째로 현장의 지질특성과 50여 차례 발파시험으로 현장 고유의 발파진동감쇄곡선을 도출하였으며, 이를 통해 현장의 시공성과 콘크리트 품질 확보를 동시에 달성할 수 있는 방안을 제시하였다. 콘크리트댐 공사에서는 제한된 공기 내에 공사를 완료하기 위해 사면부 굴착과 콘크리트 타설이 동시에 수행될 수밖에 없는 문제점을 가지고 있다. 그러나 신규 콘크리트 타설면 근처에서 발파를 수행하는 경우 발파로 발생되는 탄성파가 일정 수준을 초과하게 되면, 콘크리트 양생에 영향을 주게 된다. 따라서 다수의 현장 발파시험을 통해 발파거리와 최대진동속도의 상관관계 즉, 발파진동감쇄곡선을 도출함으로써 현장의 발파진동특성을 도출할 수 있었다. 또한, 기존 연구 논문들을 통해 콘크리트 재령기간 별 안전진동속도를 선정하고, 해당 안전진동속도를 초과하지 않는 범위에서 콘크리트 타설면과 발파위치의 거리에 따라 1회 발파 가능한 장약량을 산정하여 적용하였다. 이와 같은 체계적인 접근을 통해 콘크리트 타설과 발파 작업 동시 수행에 대한 논란을 해소할 수 있었다.

  • PDF

Application of Linear Tracking to the Multi-reservours System Operation in Han River for Hydro-power Maximization (한강수계 복합 저수지 시스템의 최적 수력발전 운영을 위한 LINEAR TRACKING의 적용)

  • Yu, Ju-Hwan;Kim, Jae-Han;Jeong, Gwan-Su
    • Journal of Korea Water Resources Association
    • /
    • v.32 no.5
    • /
    • pp.579-591
    • /
    • 1999
  • The operation of a reservoir system is necessary for establishing the operation rule as well as designing the reservoirs for water resources planning or management. Increasingly complex water resource systems require more advanced operation techniques. As a result, various techniques have been introduced and applied until now. In this study Linear Tracking model based on optimal control theory is applied to the operation of the largest scale multi-reservoir system in the Han river and its applicability proved. This system normally supplies the water resources required downstream for hydro-power and plays a role in satisfying the water demand of the Capital region. For the optimal use of the water resources the Linear Tracking model is designed with the objective to maximize the hydro-power energy subject to the water supply demand. The multi-reservoir system includes the seven main reservoirs in IIan river such as Hwachon, Soyanggang, Chunchon, Uiam, Cheongpyong, Chungju and Paldang. These reservoirs have been monthly operated for the past 21 years. Operation results are analyzed with respect to both hydro"power energy and water supply. Additionally the efficiency of the technique is assessed.sessed.

  • PDF

Estimation of Water Current Energy Potential for Multipurpose Dam Outlet (다목적댐 방수로의 수류에너지 잠재량 산정)

  • Park, Wansoon;Lee, Chulhyung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.208.2-208.2
    • /
    • 2011
  • 기존의 수력발전방식은 물의 위치에너지를 이용하므로 적합한 입지가 제한된다. 그러나 수류에너지를 이용한 발전방식은 기존의 수력발전과는 달리 물의 운동에너지를 이용하기 때문에 입지에 제한이 적으며, 물은 밀도가 크기 때문에 작은 유속으로도 많은 에너지를 생산할 수 있고,댐을 필요로 하지 않으므로 하천생태계 및 환경에 영향을 주지 않는 장점이 있다. 따라서 하천 뿐 아니라 기존 물관련시설의 미활용 방류수를 이용할 수 있으므로 수력잠재량이 매우 크다. 본 연구에서는 다목적댐 방수로의 수류에너지 잠재량 산정을 위하여 유역면적이 $2,285km^2$ 이고 연평균 방류량이 약 $29,389m^3/s$ 인 남강댐을 선정하였다. 분석결과 남강 다목적댐의 방수로를 이용한 수류에너지 잠재량은 연간 약 639,685.35kWh로 산정되었다. 향후 하천생태계와 환경에 영향을 주지않는 재생에너지원으로서의 수류에너지 이용은 미활용에너지의 적극 활용 측면과 미래전력 수요에 대한 중요한 원천으로써 재고되어야 할 것이다.

  • PDF

Estimation of Water Current Energy Potential for Multiple Purpose Dam (다목적댐을 이용한 수류에너지 잠재량 산정)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.621-621
    • /
    • 2012
  • 기존의 수력발전방식은 물의 위치에너지를 이용하므로 적합한 입지가 제한된다. 그러나 수류에너지를 이용한 발전방식은 기존의 수력발전과는 달리 물의 운동에너지를 이용하기 때문에 입지에 제한이 적으며, 물은 밀도가 크기 때문에 작은 유속으로도 많은 에너지를 생산할 수 있고,댐을 필요로 하지 않으므로 하천생태계 및 환경에 영향을 주지 않는 장점이 있다. 따라서 하천 뿐 아니라 기존 물관련시설의 미활용 방류수를 이용할 수 있으므로 수력잠재량이 매우 크다. 본 연구에서는 다목적댐 방수로의 수류에너지잠재량 산정을 위하여 유역면적이 $6,648km^2$이고 연평균 방류량이 약 $66.770m^3/s$인 충주댐을 선정하였다. 분석결과 충주 다목적댐의 방수로를 이용한 수류에너지 잠재량은 연간 약 373,687kWh로 산정되었다. 향후 하천생태계와 환경에 영향을 주지않는 재생에너지원으로서의 수류에너지 이용은 미활용 에너지의 적극 활용 측면과 미래전력 수요에 대한 중요한 원천으로써 재고되어야 할 것이다.

  • PDF

Implementation of Thermal-Hydraulic Models into a Power Plant Simulation Tool (발전소 시뮬레이션 툴을 위한 열수력 모델 구현)

  • 손기헌
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1998.10a
    • /
    • pp.95-99
    • /
    • 1998
  • 한전 전력연구원은 발전소의 복잡한 계통을 효과적으로 시뮬레이션하는 GUI(Graphical User Interface)에 기반을 둔 시뮬레이션 툴(PowerSim)을 독자적으로 개발하였다. 본 논문에서는 열교환기, 펌프, 밸브, 탱크등의 구성요소에 적합한 열수력 모델을 개발하고, 이 모델을 ORCAD로부터 생성된 Netlist의 연결정보에 맞게 연결하여 발전계통을 시뮬레이션하는 과정을 서술하였다. 또한, 발전계통의 열수력현상을 지배하는 질량, 운동량, 에너지 보존 방정식을 실시간에서 풀 수 있는 알고리즘을 제시하였다.

  • PDF

Data analysis for Simulator of hydro turbine-governor (수력 터빈제어시스템 모의제어기 구성을 위한 데이터 분석)

  • 정창기
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1999.10a
    • /
    • pp.243-246
    • /
    • 1999
  • 국내에 설치되어 있는 수력발전설비의 많은 부분이 노후화되고 있으며 디지털 시스템의 발전으로 발전소의 제어시스템도 디지털시스템으로 설비개체가 많이 시행되고 있다. 특히 부가가치가 높고 연구개발이 미진한 터빈 조속기 제어시스템 분야의 국산화가 시급한 실정이다. 본 논문에서는 수력발전소 수차제어를 디지털 제어시스템으로 개발하기 위하여 기본 자료로서의 각 운전 단계별로 데이터를 취득하고 분석하여 제시하였다.

  • PDF

Estimation of Annual Power Generation by Long-Term Runoff Simulation for Potential Dam Development Site in North Korea (북한지역 댐 개발 가능유역에 대한 장기유출 모의를 통한 연간발생전력량 추정)

  • Kwon, Minsung;Ahn, Jae-Hyun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2018.05a
    • /
    • pp.196-196
    • /
    • 2018
  • 북한의 에너지 공급은 석탄과 수력 위주로 구성되어 있지만, 수력이 북한 발전량의 약 63%를 차지할 만큼 비중이 높다. 북한은 지리적으로 수력발전 개발에 많은 이점을 가지고 있는 만큼 북한 수자원 개발 사업에 진출하거나, 통일을 대비하기 위해 댐 개발 가능지역에 대한 검토가 필요하다. 본 연구에서는 댐 개발이 가능한 북한지역의 33개 유역에 대해 SWAT 모형을 활용하여 장기유출 모의를 수행하였다. 북한지역에 대한 직접적인 자료 획득이 어려운 현실에서 장기유출 모의를 위해 수치표고자료는 일본우주항공연구개발기구(JAXA)에서 제공하는 30 m DEM을 활용하였으며, 기상자료는 북한이 세계기상기구(WMO)에 제공한 자료를 이용하였고, 토지이용 및 토양 자료는 WaterBase에서 제공하는 자료를 활용하였다. 1988년부터 2017년 까지 30년간의 일 유출량을 모의하였으며, 연간발전가능량 계산을 위한 사용수량은 해당 유역의 풍수량을 사용하였으며, 수차효율과 발전기효율의 합성효율은 댐 설계기준에서 제시한 계획단계의 85%를 적용하였다. 유효낙차와 발전능률은 기존 연구에서 제시한 92%와 66%를 적용하였다. 본 연구에서 추정한 북한 지역의 개발 가능한 댐의 연간발생전력량은 향후 수자원분야의 북한 진출을 위한 기초자료로 활용될 수 있을 것이다.

  • PDF