• Title/Summary/Keyword: 숏크리트

Search Result 342, Processing Time 0.021 seconds

A study on the stability analysis for grouting reinforcement in a subsea tunnel (해저터널에서의 그라우팅 보강을 위한 안정성 연구)

  • You, Kwang-Ho;Kim, Eun-Hye
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.2
    • /
    • pp.145-155
    • /
    • 2010
  • Recently interest in subsea tunnels is increasing nationwide and the construction of a subsea tunnel is taking place. For the stability of such a subsea tunnel, grouting is necessary for the water barrier and reinforcement of the tunnel. In this study, therefore, it was investigated how the grouting reinforcement had an effect on the stability of a subsea tunnel located in a great depth. To this end, Hydro-mechanical coupled analyses were performed for a sensitivity analysis in terms of different grouting range, rock class, shotcrete thickness, coefficient of lateral earth pressure, grouting thickness, and pumping existence for the rock classes I, III, and V. FLAC-2D ver. 5.0 was used for the numerical analyses. It was came to the conclusion that the effect of the increased water pressure due to the water barrier of the grouting should be considered as well as the strength improved effect in designing grouting reinforcement of subsea tunnels.

Prediction of Long-term Behavior of Tunnel in the Presence of Geological Anomalies (지질이상대가 존재하는 구간에서의 터널의 장기거동 예측)

  • Hoki Ban;Heesu Kim;Jungkuk Kim;Donggyou Kim
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.8
    • /
    • pp.13-20
    • /
    • 2023
  • Tunnelling through the geological anomalies has widely known to have many difficulties such as bottom heave, crack of lining, squeezing and so on. To stabilize the tunnel during the construction or after construction, various reinforcing methods have been introduced and applied such as micropiling at the bottom of tunnel to prevent the bottom heave. In this study, long-term behavior of tunnel in the presence of geological anomalies was predicted using numerical analyses. To this end, material properties for swelling rock model capable of representing the rock swelling behavior was obtained using matching process with measured data to validate the adopted model. After the model validation, simulations were performed to predict the long-term behavior of tunnel in the geological anomalies.

Evaluation of Fire-induced Damage to Structural Members in Tunnels (화재에 의한 터널구조물 시공재료의 손상 평가)

  • Chang, Soo-Ho;Choi, Soon-Wook;Kwon, Jong-Wook;Bae, Gyu-Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3C
    • /
    • pp.219-228
    • /
    • 2006
  • In this study, a series of fire tests was carried out to evaluate fire-induced damage to structural members in tunnels. From the tests, the loss amount of concrete materials under the RWS scenario was slightly bigger than under the RABT fire scenario. Especially under the RWS fire scenario where the maximum temperature is over $1,200^{\circ}C$, the loss of concrete materials was mainly induced by melting. Generally, the loss of materials in reinforced concrete was slightly smaller than that in unreinforced concrete. Depending upon an applied fire scenario, fire-induced damage to shotcrete was quite different. From the realtime investigation of a specimen surface by a digital camcorder, it was proved that the material loss under the RABT fire scenario was mainly induced by spalling. However, it was also revealed that although fire-induced damage in the initial heating stage under the RWS was so close to that under the RABT, the material loss under the RWS at the later stage after 50 minutes elapsed since fire initiation was induced not by spalling but by melting.

Performance Evaluation of High Strength Lattice Girder by Structural Analyses and Field Measurements (구조해석과 현장계측에 의한 고강도 격자지보재의 성능 평가)

  • Lee, Jeo-Won;Min, Kyong-Nam;Jeong, Ji-Wook;Roh, Byoung-Kuk;Lee, Sang-Jin;Ahn, Tae-Bong;Kang, Seong-Seung
    • The Journal of Engineering Geology
    • /
    • v.30 no.3
    • /
    • pp.237-251
    • /
    • 2020
  • This study examined structural analysis of supports in tunnel and displacement and underground stress of tunnel by measurement, in order to evaluate the performance of high-strength lattice girders developed as a substitute for H-profiles. According to the three-dimensional nonlinear structural analysis results of the tunnel support, the load and displacement relationship between the H-profiles and the high-strength lattice girders showed almost the same behavior, and the maximum load of the high-strength lattice girders were 1.0 to 1.2 times greater than the H-profiles. By the results of the three-dimensional tunnel cross-section analysis of the supports, the axial force was occurred largely in the lower left and right sides of the tunnel, and showed a similar trend to the field test values. In the results of the measurement of the roof settlement and rod extension, the final displacement of the steel arch rib (H-profile) and high-strength lattice girder section in tunnel was converged to a constant value without significant difference within the first management standard of 23.5 mm. According to the results of underground displacement measurement, the final change amount of the two support sections showed a slight displacement change, but converged to a constant value within the first management standard of 10 mm. By the results of measurement of shotcrete stress and steel arch rib stress, the final change amount of the two support sections showed a slight stress change, but converged to a constant value within the first management standard of 81.1 kg/㎠ and 54.2 tonf.

A preliminary numerical analysis on the behaviour of tunnel under construction in fracture zone considering seismic load (지진 하중을 고려한 단층파쇄대에서의 시공 중 터널 거동 분석에 관한 수치해석적 연구)

  • Oh, Dong-Wook;Hong, Soon-Kyo;Kim, Dae-Kon;Lee, Yong-Joo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.2
    • /
    • pp.279-299
    • /
    • 2019
  • Recently occurred earthquake Gyeongju and Pohang served as a momentum to remind that Korean peninsular is not a safety zone from earthquake anymore. The importance of seismic design, therefore, have been realized and researches regarding design response spectrum have been actively carried out by many researchers and engineers. Current tunnel seismic design method is conducted to check safety of tunnel structure by dynamic numerical analysis with condition of completed lining installation, so, it is impossible to consider safety of tunnel behavior under construction. In this study, therefore, dynamic numerical analysis considering seismic wave propagations has been performed after back analysis using results from field monitoring of tunnel under construction in fractured zone and 1st reinforcement (shotcrete, rockbolt) behaviour are analyzed. Waves are classified by period characteristic (short and long). As a result, the difference depending on period characteristic is minor, and increasements of displacement are obtained at crown displacement due to seismic wave is 28~31%, 14~16% at left side of tunnel in the fractured zone, 13~27% at right side of tunnel in the bed rock, respectively. In case of shotcrete axial force is increased 113~115% at tunnel crown, 102% at left side, 106~110% at right side, respectively. Displacement and axial force of rockbolts which are selected by type of anchored grounds (only fractured zone, fractured zone and bed rock, only bedrock) are analyzed, as a result, rockbolt which is anchored to fractured zone and bed rock at the same time are weaker than any other case.

R&D Review on the Gap Fill of an Engineered Barrier for an HLW Repository (고준위폐기물처분장 공학적방벽의 갭채움재 기술현황)

  • Lee, Jae Owan;Choi, Young-Chul;Kim, Jin-Seop;Choi, Heui-Joo
    • Tunnel and Underground Space
    • /
    • v.24 no.6
    • /
    • pp.405-417
    • /
    • 2014
  • In a high-level waste repository, the gap fill of the engineered barrier is an important component that influences the performance of the buffer and backfill. This paper reviewed the overseas status of R&D on the gap fill used engineered barriers, through which the concept of the gap fill, manufacturing techniques, pellet-molding characteristics, and emplacement techniques were summarized. The concept of a gap fill differs for each country depending on its disposal type and concept. Bentonite has been considered a major material of a gap fill, and clay as an inert filler. Gap fill was used in the form of pellets, granules, or a pellet-granule blend. Pellets are manufactured through one of the following techniques: static compaction, roller compression, or extrusion-cutting. Among these techniques, countries have focused on developing advanced technologies of roller compression and extrusion-cutting techniques for industrial pellet production. The dry density and integrity of the pellet are sensitive to water content, constituent material, manufacturing technique, and pellet size, and are less sensitive to the pressure applied during the manufacturing. For the emplacement of the gap fill, pouring, pouring and tamping, and pouring with vibration techniques were used in the buffer gap of the vertical deposition hole; blowing through the use of shotcrete technology and auger placement and compaction techniques have been used in the gap of horizontal deposition hole and tunnel. However, these emplacement techniques are still technically at the beginning stage, and thus additional research and development are expected to be needed.

Preparation of shotcrete coarse aggregate with low grade clay and coal ash (저급 점토와 석탄회를 이용한 숏크리트용 골재의 제조)

  • Kim, Kyung-Nam;Jung, Hee-Su;Park, Hyun
    • Journal of the Korean Crystal Growth and Crystal Technology
    • /
    • v.20 no.3
    • /
    • pp.147-152
    • /
    • 2010
  • In this study, the artificial coarse aggregate was manufactured by using coal ash and low grade clay. The characteristics of a coal ash-clay system were investigated using XRD, XRF, TG-DTA, SEM and Dilatometer with various coal ash contents. The chemical compositions are the fly ash, bottom ash and clay, $Al_2O_3$ are 28.5 wt%, 32.4 wt% and 18.1 wt%, and $SiO_2$ are 33.0 wt%, 53.7 wt% and 68.4 wt% in weight ratio, respectively. The shrinkage of specimens started at around $850^{\circ}C$ and changed little up to $1100^{\circ}C$, but increased markedly at above $1100^{\circ}C$. The shrinkage rate is strongly related to the decarbonization amount of coal ash. At the sintering temperature $1150^{\circ}C$, it was found that quartz, mullite, anorthite and albite phase exist in all specimens. It was found that bottom-clay system specimen sintered at $1150^{\circ}C$ had a good compressive strength of 87.5 kg/$cm^2$, and the compressive strength of bottom-clay specimen was higher than that of fly-clay system specimen. The reusability of coal ash as a raw material in the process of shotcrete resources such as artifical coarse aggregate is highly expected.

Microseismic Monitoring for KAERI Underground Research Tunnel (KURT 미소진동 모니터링)

  • Kim, Kyung-Su;Bae, Dae-Seok;Koh, Yong-Kwon;Kim, Jung-Yul
    • The Journal of Engineering Geology
    • /
    • v.19 no.2
    • /
    • pp.139-144
    • /
    • 2009
  • The microseismic monitoring system with wide range of frequency has been operating in real time and it is remotely monitored at indoor and on-site for one year. This system was constructed and established in order to secure the safe and effective operation of the KAERI Underground Research Tunnel(KURT). For one year monitoring work, total 14 events were recorded in the vicinity of the KURT, and the majority of events are regarded as ultramicroseismic earthquake and artificial impacts around the tunnel. The major event is the magnitude 3.4 earthquake which was centered around Gongju city, Chungnam Province. It means that there is no significant evidence of high frequency microseismic event, which is associated with fracture initiation and/or propagation in the rock mass and shotcrete. Three components sensor was applied in order to analyze and define the direction of vibration as well as an epicenter of microseismic origin, and also properly designed and installed in a small borehole. This monitoring system is able to predict the location and timing of fracturing of rock mass and rock fall around an undreground openings as well as analysis on safety of various kinds of engineering structures such as nuclear facilities and other structures.

Monitoring System of Rock Mass Displacement and Temperature Variation for KURT using Optical Sensor Cable (광섬유센서케이블을 이용한 지하연구시설의 지반변위 및 온도변화 감시시스템 구축)

  • Kim, Kyung-Su;Bae, Dae-Seok;Koh, Yong-Kwon;Kim, Jung-Yul
    • The Journal of Engineering Geology
    • /
    • v.19 no.1
    • /
    • pp.63-70
    • /
    • 2009
  • The optical fiber cable acting as a sensor was embedded in the underground research tunnel and portal area in order to monitor their stability and the spatial temperature variation. This system includes two types of sensing function to monitor the distributed strain and temperature along the line, where sensor cable is installed, not a point sensing. According to the results of one year monitoring around the KURT, there is no significant displacement or movement at the tunnel wall and portal slope. However, it would be able to aware of some phenomena as an advance notice at the tunnel wall which indicates the fracturing in rockmass and shotcrete fragmentation before rock falls accidently as well as movement of earth slope. The measurement resolution for rock mass displacement is 1 mm per 1 m and it covers 30 km length with every 1m interval in minimum. In temperature, the cable measures the range of $-160{\sim}600^{\circ}C$ with $0.01^{\circ}C$ resolution according to the cable types. This means that it would be applicable to monitoring system for the safe operation of various kinds of facilities having static and/or dynamic characteristics, such as chemical plant, pipeline, rail, huge building, long and slim structures, bridge, subway and marine vessel. etc.

Assessment and Damage Reduction Strategy of Acid Rock Drainage in Highway Construction Site: ○○ Highway Construction Site (고속도로 건설현장의 산성배수 발생개연성평가 및 피해저감대책: ○○고속도로건설현장)

  • Lee, Jin-Soo;Kim, Jae Gon;Park, Jeong-Sik;Chon, Chul-Min;Nam, In-Hyun
    • Economic and Environmental Geology
    • /
    • v.46 no.5
    • /
    • pp.411-424
    • /
    • 2013
  • Assessment and damage reduction strategy of acidic rock drainage were conducted in a section of ${\bigcirc}{\bigcirc}$ highway construction site. The geology of the studied section consists of Icheonri sandstone and intermediate to acidic volcanic rocks. Sulfides occur as a disseminated type in sandstone and volcanics which were altered by the hydrothermal solution of granite intrusion. Volcanics and sandstone with a high content of sulfide were classified as a potentially acid rock drainage(ARD) forming rock. The drainage originated from those rocks may acidify and contaminate the surrounding area during the highway construction. Therefore, the drainage should be treated before it is discharged. A slope landslide hazard due to the ARD was also expected and the coating technology was recommended for the reduction of ARD generation as a preemptive measure before reinforcement work for enhancing slope stability such as shotcrete and anchor. According to the ARD risk analysis, those rocks should not be used as cement aggregate, but only to be used as a bank fill material of a filling-up system that allows minimal contact with rainfall and groundwater.