• Title/Summary/Keyword: 숏크리트응력

Search Result 58, Processing Time 0.021 seconds

Effect of utilizing pressurized ring beam system in modern rock TBM: I. Numerical study (현대식 Rock TBM에서 가압형 링빔의 효과 연구: I. 수치해석적 연구)

  • Kwak, Yun-Suk;Kang, Gi-Don;Kim, Do-Hoon;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.1
    • /
    • pp.55-77
    • /
    • 2012
  • A Modern Rock TBM is a tunnel excavation method combining the conventional tunnelling method with the mechanized tunnelling method. It is a hybrid system that excavates a tunnel with TBM and supports the ground by ring beam, wire mesh, rock bolt, shotcrete, i.e., conventional tunnelling method. In the Modern Rock TBM, a ring beam is similar to a steel rib in NATM in the way that uses H-beam. But using a ring beam is more effective than a steel rib because it is installed in a closed-circle. Therefore, improving the performance of the ring beam is a key factor for achieving tunnel stability. In this respect, this study introduces a pressurized ring beam that might be functioning more effectively by confining convergence during tunnel excavation. In order to verify the effect of the pressurized ring beam, a three-dimensional numerical analysis was conducted. The numerical analysis confirms an increase in the minimum principal stress and reduction in the plastic strain that triggers excessive displacement. The analysis result also indicates a decrease in the relative displacement occurring after installing the ring beam, and expansion in spacing between the ring beams.

Effects of Excavation Methods on Tunnel Deformation Behavior - A Numerical Investigation (굴착공법이 터널변위 거동에 미치는 영향 - 수치해석 연구)

  • Yoo, Chung-Sik;Kim, Joo-Mi;Kim, Sun-Bin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.4
    • /
    • pp.289-305
    • /
    • 2006
  • This paper presents the effect of excavating methods on tunnel behavior. As part of this study, it is preliminarily focused on the comparison of two different excavation methods, center diaphram (CD) method and ringcut (RC) method. Especially, the purpose of this research is to study the behavioral mechanism of two tunnels which share the same construction environment but different excavating method. Two numerical analysis models with the same tunnel section and material properties are compared in this study, and they are analyzed by 3D finite element analysis. In each model, face stability, crown displacement, ground settlement, and shotcrete-lining stress are computed, then the general behavior of CD method and RC method is studied. The results indicate that the CD method tends to be effective in controlling tunnel displacement while the RC method is more effective in controlling ground settlement. Design implications of the findings from this study are discussed.

The effect of curvature at the bottom of a soft ground tunnel by numerical analysis (수치해석에 의한 연약지반 터널의 바닥부 곡률의 영향 분석)

  • You, Kwangho;Kim, Kangsan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.2
    • /
    • pp.107-118
    • /
    • 2021
  • Due to the acceleration of road construction, the number and extension of tunnels are increasing every year. A lot of research has been done on the collapse of tunnels, but research on the invert heaving is insufficient. Therefore, in this study, a sensitivity analysis was performed using a geotechnical general-purpose program to analyze the effect of the invert curvature of a tunnel excavated on the soft ground. As a result, it was quantitatively confirmed that the stability of a tunnel was increased as the curvature of the tunnel invert was increased so that the safety factor was calculated to be large regardless of the ground conditions and the thickness of the support. In addition, it was confirmed that the stability of the tunnel was increased by reducing the convergence of the tunnel and the maximum bending stress supported by shotcrete. Therefore, when a tunnel is excavated on soft ground, it is believed that applying a curvature to the invert will increase the stability of the tunnel.

Assessment of tunnel stability according to height of embankment by numerical analysis (수치해석을 통한 성토 높이에 따른 터널 안정성 평가 연구)

  • Lee, Kang-Hyun;Lee, Sangrae;Kim, Nag-Young
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.1
    • /
    • pp.37-45
    • /
    • 2021
  • The construction of the tunnel portal should be careful because cover depth is shallow and it is difficult to exhibit the arching effect. Tunnel stability may be reduced with additional embankment above the portal of tunnel. In this study, in order to examine the stability of the tunnel according to additional embankment above the portal of tunnel, numerical analysis was performed while changing the ground conditions and height of embankment. As a result of the numerical analysis, it was found that the allowable flexural compressive stress of shotcrete and allowable axial force of rockbolts were exceeded when the height of additional embankment was 12 m in rock mass rating V. When considering the displacement, the range of the plastic region and the behavior of the support materials, the tunnel stability seems to be greatly reduced if the height of additional embankment above the portal of tunnel exceeds 10 m.

Deformation analysis of shallow tunneling with unconsolidated soil using nonlinear numerical modeling (비선형 수치모델링을 이용한 미고결 지반 저토피 터널의 변형해석)

  • Lee, Jae-Ho;Kim, Young-Su;Yoo, Ji-Hyeung;Jeong, Yun-Young
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.2
    • /
    • pp.105-116
    • /
    • 2010
  • The estimation of surface settlement, ground behavior and tunnel displacement are the main factors in urban tunnel design with shallow depth and unconsolidated soil. On deformation analysis of shallow tunnel, it is important to identify possible deformation mechanism of shear bands developing from tunnel shoulder to the ground surface. This paper investigated the effects of key design parameter affecting deformation behavior by numerical analysis using nonlinear model incorporating the reduction of shear stiffness and strength parameters with the increment of the maximum shear strain after the initiation of plastic yielding. Numerical parametric studies are carried out to consider the reduction of shear stiffness and strength parameters, horizontal stress ratio, cohesion and shotcrete thickness.

A Study on the Assessment of Safety Factor of Tunnels (터널의 안전율 평가 기법에 관한 연구)

  • 박종원;박연준;유광호;이상돈
    • Tunnel and Underground Space
    • /
    • v.14 no.5
    • /
    • pp.327-338
    • /
    • 2004
  • The purpose of this research is to establish a concept of the factor of safety of tunnels which is a quantitative estimate of the stability of tunnels. Based on this concept, a numerical technique which calculates the factor of safety of tunnels was developed. To obtain the safety factor of a tunnel, the strength reduction technique in which a series of analyses are repeated with reduced ground strength until the tunnel collapses were employed. With this technique, the failure plane, as well as the factor of safety, can be obtained without prescribing the trial failure plane. Analyses were conducted with FLA $C^{2D}$(ver3.3), a geotechnical analysis program which is based on the finite difference method. From the result, the location of plastic zones, the maximum convergence and the maximum stress generated in the support system were also analyzed. The result shows that factors of safety are higher for the 1st and 2nd rock classes, and lower for the lower rock classes. Furthermore, factor of safety is higher when $K_{0}$ =0.5 compared to at in case of $K_{0}$ =2.0. Through this research, it is found that the factor of safety defined in this research can be used as a good quantitative index representing the stability of tunnels. Also, close examination of the results can help adjustment of the quantity and location of additional supports.s.

A numerical study on the analysis of behavior characteristics of inclined tunnel considering the optimum direction of steel rib (강지보재 최적 설치방향을 고려한 경사터널의 거동특성에 대한 수치해석적 연구)

  • Park, Sang-Chan;Kim, Sung-Soo;Shin, Young-Wan;Shin, Hyu-Soung;Kim, Young-Geun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.3
    • /
    • pp.245-256
    • /
    • 2008
  • The steel rib, one of the main support of tunnel, plays a very important role to stabilize tunnel excavation surface until shotcrete or rockbolt starts to perform a supporting function. In general, a steel rib at the horizontal funnel is being installed in the direction of gravity which is known favorable in terms of constructability and stability. However, as the direction of principal stress at the inclined tunnel wall is different from that of gravity, the optimum direction of steel rib could be different from that at the horizontal tunnel. In this study, a numerical method was used to analyze the direction of force that would develope displacement at the inclined tunnel surface, and that direction could be the optimum direction of steel rib. The support efficiency of steel rib could be maximized when the steel rib was installed to resist the displacement of the tunnel. Three directions which were recommended for the inclined tunnels in the Korea Tunnel Design Standard were used for the numerical models of steel rib direction. In conclusion, the results show that all displacement angle of the models are almost perpendicular to the tunnel surface regardless of face angle. So if the steel rib would be installed perpendicular to the inclined tunnel surface, the support efficiency of steel rib could be maximized.

  • PDF

Application of the convergence-confinement method of tunnel design to rock masses (암반 터널에서의 시공단계를 고려한 암반-지보 거동특성 곡선적용에 관한 연구)

  • Lee, Du-Wha;Choo, Seok-Yean;Lim, Sang-Bin;Park, Young-Jin;Ahn, Sung-Joo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.2
    • /
    • pp.143-153
    • /
    • 2002
  • Convergence Confinement Method (CCM) makes a more simple judgement in a ground-support reaction than numerical method. Also this method is good for the applicability of construction feedback and the analysis of field measurement. However, there has been little research with respect to the application of CCM in tunnel construction. One of the problems in CCM is a decision of the time to support installation. To decide a reasonable supporting installation time, support characteristic curve and displacement characteristic curve considering construction stage are proposed. In addition, to predict displacement distribution ratio and load distribution ratio, the time dependent support reaction curve is used. Finally, through a comparison of the result between CCM and numerical analysis, the trust of this study is proved and the practical application is proposed to control resonable tunnel construction management.

  • PDF