Tsunami Fragility Evaluation for Offsite Transformer in Nuclear Power Plants (지진해일에 의한 원자력발전소 소외변압기의 취약도 평가)

  • Kim, Min Kyu;Choi, In-Kil;Kang, Keum Seok
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.22 no.1
    • /
    • pp.18-24
    • /
    • 2010
  • In this study, a tsunami fragility methodology was determined for a probabilistic safety assessment(PSA) induced tsunami event in Nuclear Power Plant(NPP) site. For this purpose, a fragility evaluation method was presented using previous external PSA method. Failure mode and failure criteria about major safety related equipments and structures were determined. Finally, a tsunami fragility assessment was performed for offsite transformer in NPP site. For the fragility evaluation, structural failure like overturning and sliding and functional failure induced by inundation. Through this study, it can be concluded that a functional failure according to inundation height was governed total probability of failure of offsite transformer in NPP.

Failure Cause Analysis for Loss of Off-site Power Test during Normal Full Power Operation On Wolsong-4 NPP (월성원전 4호기 전 출력 운전시 소외전원상실시험 실패 원인분석)

  • Chang, Tae-Hee
    • Proceedings of the KIEE Conference
    • /
    • 2000.07a
    • /
    • pp.175-181
    • /
    • 2000
  • 월성원자력4호기가 '99.06.09일 11:53분 경 전출력 소외전원상실시험시 주발전기 병입차단기 및 기동용변압기 차단기의 트립과 동시에 예상 밖의 13.8Kv 원자로 냉각재펌프모터#3(9.000HP)이 순시과전류 보호계전기(50Y) 동작으로 트립되어 이로 인한 냉각재 저유량으로 원자로 제1정지계통이 동작되고 원자로가 비상정지 되어 동 시험이 실패되었음. 이 비정상적인 고장은 예비디젤발전기의 수동 기동 병입과 터빈 수동 정지 및 주발전기 트립후 적절한 조치로 소내전원은 정상적으로 복구되었음. 이에 대해 냉각재펌프모터#3의 순시과전류 동작 원인을 유도전동기의 전원상실 후 발생되는 잔류전압(Residual Voltage)과 공급 모선전압(Bus Voltage) 측면에서 분석하며, 모터의 회전속도, 위상각, 잔류전압크기 변화 및 신속개방 절체시 냉각재펌프모터의 돌입 기동전류를 계산하고, PSS/E 프로그램을 사용한 간략한 모의 사례로 검증하였으며 이에 대한 재발방지를 위한 대책을 제시함.