• Title/Summary/Keyword: 소방기록물

Search Result 9, Processing Time 0.024 seconds

A Study on the Management Status of Fire Services Records of Local Government in the Metropolitan Area (광역지방자치단체 소방기록물 관리 현황 분석)

  • Kim, Ye Ji;Lee, Seongsin
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.19 no.3
    • /
    • pp.179-204
    • /
    • 2019
  • The study aims to investigate the management status of fire services records of local government D in the metropolitan area. To achieve this, the study analyzed the data from 2013 to 2017 based on the production, preservation, and disposition processes of records. The findings are as follows: 1) unkept regulations to transfer the records, 2) a lack of understanding of archival objects, 3) reconsideration of the history management of the records appraisal committee, 4) and an on-site update of records. Therefore, this study suggested the following for an effective fire services records management: 1) training for the fire services records management, 2) proper budgeting for the records management, 3) and secured metadata for the history management of records.

An Experimental Study on Fire Performance of Curtain Walls in Super Tall Building (초고층용 커튼월 내화성능 평가를 위한 실험적 연구)

  • Jang, Seung-Bae;Kim, Heoung-Youl;Kim, Hyung-Jun;Lee, Jae-Sung;Cho, Bong-Ho
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2011.04a
    • /
    • pp.345-350
    • /
    • 2011
  • 본 연구에서는 건축물의 초고층화와 대형화로 접목된 커튼월을 모델로 선정하여 알루미늄과 스틸 커튼월의 성능 비교를 위한 화재실험을 실시하였다. 화재실험은 $3m{\times}3m$ 규모의 알루미늄과 스틸 재질로 제작하여, 차염성, 차열성, 방열성, 변위, 커튼월 파괴를 측정하였다. 실험결과 알루미늄커튼월의 차염성은 12분, 차열성은 6분, 방열성은 26분을 기록하였고 스틸커튼월의 차염성은 10분, 차열성은 6분, 방열성은 14분을 기록하였다.

  • PDF

An Experimental Study on the Cooling of Unburned Surface due to Water Droplet (물액적에 의한 미연소면의 냉각에 관한 실험적 연구)

  • 방창훈;김정수;예용택
    • Fire Science and Engineering
    • /
    • v.14 no.3
    • /
    • pp.13-18
    • /
    • 2000
  • The objective of the present work is to examine the cooling characteristics of water droplet on the unburned surface. The hot solid surface material used brass, carbon steel and copper at temperature ranging from 70 to $116^{\circ}$. the droplet size is from 2.4 mm to 3.0 mm. The CCD camera was used to record the evaporation histories of the droplets. and the evaporation time of the droplet on the hot solid surface could be determined by using frame-by-frame analysis of the video records. It is found that during the droplet evaporation process for copper the temperature remains nearly constant, whereas for carbon steel the temperature continuously decreases about $1^{\circ}$. During the droplet evaporation process on the hot solid surface, regardless of solid materials, nondimensional droplet volume decreases nondimensional evaporation time increases.

  • PDF

An Approach to Urban Planning System for Disaster Prevention through Location/Allocation of EMS(Emergency Medical Service) - Focused on Optimum Location of Safety Centers in Jinju - (응급의료서비스 입지/배분을 통한 도시방재시스템의 도시계획적 접근 - 진주시 안전센터의 최적입지를 중심으로 -)

  • Choi, Jin Do;Kim, Yeong;Kim, Sung Duk
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.112-112
    • /
    • 2011
  • 오늘날 우리 사회의 생활과 문화의 질이 향상됨에 따라 공공 및 개인의 안전과 건강에 대한 관심이 증대되고 있다. 특히, 재난과 비상사태는 생명에 대한 희생뿐만 아니라 훨씬 더 심각한 경제적인 결과를 초래한다. 이러한 응급사태에 개비하여 적절히 준비되지 않았거나 재난의 예방 및 완화시킬 방법을 가지고 있지 못한다면 도시의 발전적인 프로젝트는 예고 없이 도시를 강타하는 재난 및 비상사태에 의해 무산되고 만다. 이러한 여건 하에 재난과 응급사고를 효율적으로 대처하는 응급처치와 서비스에 대한 급격한 관심과 함께 일정한 결정적 대응시간 내에 각종사고와 재해로부터 방어할 수 있는 공공서비스에 대한 필요성이 크게 증가되었다. 본 연구에서는 신고, 응급구조, 환자이송 등 도시의 병원 전 단계 의료환경에 대해서 조사하였다. 본 연구의 목적은 반응시간과 출동거리를 분석함으로써, 응급사고에 즉시 응급구조서비스를 제공하기 위해 안전센터(119센터)의 최적 입지를 확인하는 것이다. 이를 위해서 사고발생, 반응시간, 출동거리 등을 응급의료 활동과 관련된 연구논문, 대상지 전역의 소방기록물과 출동일지 등의 통계자료를 활용하여 신속한 응급의료 서비스를 위한 패턴을 분석 하였다. 또한 응급구조대의 조직과 활동의 분석을 통해 응급의료시설의 최적 입지설정을 위한 제도적 개선대안을 마련해 보았다. 대상지 연구를 위해, 구조활동 및 소방서비스의 최근 통계자료의 조사를 통해 진주시의 모든 119센터의 입지와 응급의료서비스 및 사고발생 현황을 나타내었다. 자료 분석을 위해서 SPSS14.0을 사용하였으며, 지역의 특성 분포, 안전센터별 대응시간, 이송시간 등을 소방 GPS시스템과 입지할당모형 중 Center Point Model(CPM)을 적용하였다. 결과적으로 본 연구를 통해 대상지역의 119안전센터의 서비스 질이 나쁜 지역을 지리학적인 관점에서 최적 입지/배분 패턴의 설정을 통해 확인할 수 있었으며, 이를 통해 미래 응급의료서비스의 효율적인 입지/배분을 통해 공공 및 개인의 안전과 건강에 기여할 수 있을 것으로 기대된다.

  • PDF

Firefighters' Exposures to Polynuclear Aromatic Hydrocarbons and Volatile Organic Compounds by Tasks in Some Fire Scenes in Korea (일부 화재현장에서 소방공무원의 직무별 다핵방향족탄화수소 및 휘발성유기화합물 노출평가)

  • Jin, Suhyun;Byun, Hyaejeong;Kang, Taesun
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.29 no.4
    • /
    • pp.477-487
    • /
    • 2019
  • Objectives: Firefighters are known to be exposed to a variety of toxic substances, but little information is available on the exposure profile of firefighting activities. The aims of this study were to conduct exposure monitoring of toxic chemicals at fire scenes, to compare the concentrations of respective chemicals among firefighting tasks, and to assess the main factors influencing the concentrations of chemicals. Methods: Researchers performed sampling at firefighting scenes during four weeks in 2013. At the scene, we collected samples based on firefighters' own activities and examined the situation and scale of the accident. Collected samples were classified into three categories, including fire extinguishing and overhaul, and were analyzed in the laboratory according to respective analysis methods. Results: A total of fourteen fire activity events were surveyed: five fire extinguishing, six overhaul, and three fire investigations. Although no substance exceeded the ACGIH TLV, PAHs were detected in every sample. Naphthalene ranged from 0.24 to 279.13 mg/㎥ (median 49.6 mg/㎥) and benzo(a)pyrene was detected in one overhaul case at 10.85 ㎍/㎥. Benzene (0.01-12.2 ppm) was detected in every task and exceeded the ACGIH TLV. No significant difference in concentrations between tasks was shown. Conclusions: These results indicate that all firefighting tasks generated various hazardous combustion products, including possible carcinogens.

An Experimental Study on the Fire Risk of a Firewood Boiler (화목보일러 화재위험성에 관한 실험적 연구)

  • Lee, Sung-Ryong
    • Fire Science and Engineering
    • /
    • v.29 no.3
    • /
    • pp.37-42
    • /
    • 2015
  • In this study, experiments were carried out to evaluate the fire risk of a firewood boiler, which is mainly used as a winter heating apparatus in rural areas. The ambient temperatures of the combustion chamber and the duct were measured. The fire risk of tar inside the duct was also investigated. The temperature decreased less than $40^{\circ}C$ in the region more than 40 cm from the combustion chamber. Fire- flakes were scattered in the range of less than 60 cm from the combustion chamber. The temperature inside the rose to above $600^{\circ}C$. At 2 m from the boiler body, the temperature inside the duct was increased to about $420^{\circ}C$. The ignition temperature of tar was about $398^{\circ}C$. The temperatures of the boiler and duct surface were above $300^{\circ}C$. Combustible material ignited when it contacted the boiler surface or duct surface.

A Study on the Evacuation Performance Review for the Office Buildings (업무용 빌딩의 피난 성능 검토에 관한 연구)

  • 오혁진;백승태;김우석;이수경
    • Fire Science and Engineering
    • /
    • v.17 no.3
    • /
    • pp.1-6
    • /
    • 2003
  • In this study, it reviewed about evacuation performance of a specified Office Building. assessment tools is FAST 3.1.7 (Estimation of Flash Over, Estimation of Layer Height Down Flow Time), SIMULEX 32-bit (Estimation of Evacuation Time), JASMINE 3.25d. (Smoke Flow Assessment of a specified time) Result from Fire Scenario # 1, Flash Over is not generated in Compartment. Evacuation Time is estimated 25.2 sec by SIMULEX 32-bit. layer height until this time (25.2 sec) was estimated 2.4 m by FAST 3.1.7. After ignition until this time (25.2 sec), smoke was not release to the a corridor. In consequence, We concluded that people in building are completing the safe evacuation without the damage of smoke. Result from Fire Scenario # 1, Flash Over generated 6 min 33.2 sec in Compartment. Evacuation Time is estimated 1 min 25.5 sec by SIMULEX 32-bit. layer height down flow time is 1 min 40.8 sec by FAST 3.1.7 and 5 min 23 sec by theoretical calculation. Also, total building evacuation time was estimated 2 min 26.6 sec. After ignition until this time (2 min 26.6 sec), smoke released to the a corridor but it amount was few little. Therefore, generated smoke in compartment not effected to the people in buildings.

A Study on the Fire Prevention Activities and Suppression Measures of Utility-Pipe Conduit (지하공동구 화재예방활동 및 진압대책에 관한 연구)

  • Lee, Jung-Il
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.10 no.4
    • /
    • pp.63-68
    • /
    • 2010
  • Utility-Pipe Conduit is, Housing and city effectively accommodate what they absolutely need power, communications, gas, pipeline, water supply, drainage, energy facilities etc, according to expansion of urban infrastructure are derived, several ways to solve problems in, collection facilities in place are maintained and managed facility. If Utility-Pipe Conduit is damaged, as well as national security, because their impact on society as a whole, by introducing large vulnerability in the fire prevention activities and suppression measures and disaster for our situation by introducing measures, comprehensive analysis of the fire risk, it shall establish fire prevention activities and suppression through analysis of Utility-Pipe Conduit design, institutional issues, the problem of fire protection facilities, fire spread phenomenon etc. Because of Utility-Pipe Conduit is an enclosed place, so incomplete combustion due to lack of oxygen supply that there are problem such dark smoke, carbon monoxide etc, toxic combustion products and heat generation and visual impairment is an issue difficult to enter. As well as fire prevention activities, the fire In light of the particularity of the under ground than above ground fire, so this phenomenon is weak fire fighting that fire to become effective fire fighting tactics, basically it is necessary difficulty softening, non-burn softening and prevent combustion expansion of the cable is installed on the Utility-Pipe Conduit, having to considering the specificity of the response command system and relevant organizations to establish an on-site, Structural identification and other information gathering required to record of Response agencies, keep air conditioning system 24 hours and strengthening Virtual Total Training of Response agen

A Study on the Characteristics Assessment and Fabrication of Distribution Board according to KEMC Standards (KEMC 규정에 의한 분전반의 제작 및 특성 평가에 관한 연구)

  • Lee, Byung-Seol;Choi, Chung-Seog
    • Fire Science and Engineering
    • /
    • v.31 no.3
    • /
    • pp.63-72
    • /
    • 2017
  • This study fabricated a low-voltage 10 circuit distribution board based on the KEMC (Korea Electrical Manufacturers Cooperative) 2102-610 standard and performed a characteristics assessment of the developed 10 circuit distribution board to secure product stability. The developed 10 circuit distribution board is designed to have the characteristics of insulation materials, as well as resistance to corrosion ultraviolet radiation and mechanical impact. The developed distribution board is fabricated to have an appropriate protection class of enclosure, electric shock prevention and protection circuits, switchgear and its components, internal electrical circuits and connectors, external conduct terminal, insulation characteristics, temperature rise test, heat resistance, etc. The developed 10 circuit distribution board consists of a single phase circuit and 3-phase circuits. It is possible to measure in real time the leakage current generated from the load distribution line by installing a sensor module at the load side of each of the branched switchgears. In addition, it is possible to increase a circuit according to the use and purpose of the load and to also manage and check the load in real time. Temperature rise tests were performed on the developed 10 circuit distribution board at 18 places including the inlet connection, main circuit and distribution circuit bus bars and bus bar supports, etc. The highest temperature of $65.3^{\circ}C$ was measured at the R-Phase of the connection of the MCCB power supply for the branch circuit bus bar and a temperature rise of $61.6^{\circ}C$ was measured at the T-Phase of the load side. When applying thermal stress to an MCCB for 6 hours at $180^{\circ}C$ using a heat resistant experimental device, it was found that the actuator lever was transformed and moved in the tripped state.