To improve the stability of levee structure, it is required to use good quality fill materials, intensive management, appropriate hydraulic structure and construction of cut-off wall. In particular, the most important factor of levee construction technology is to use bed sediment for its safety. In this study, seepage model test and numerical analysis were performed based on a standard section of levee recommended in the river design standard of korea (2005). The results of test and analysis show that most of the bed soil is a sand (SP in USCS), which does not satisfy the permeability criteria for levee materials ($< k=10^{-3}cm/sec$), thus for the safety of levee it is required to adopt a stabilizing method such as good quality soil mixing, water content control.
To deal with the case of a rigid retaining wall built close to a stable rock face with cohesionless backfill, analytical solution methods Proposed by Spangler- Handy and Sokolovskii are modified. The modified solution methods, taking into account different friction angles along the wall and the rock face, can estimate the developed static or dynamic horizontal earth pressures behind vertical retaining walls experiencing various types of outward wall movements. The range of application of each proposed method, which is represented by the ratio of the distance between the wall and the rock face to the height of the wall, is compared with each other and also is examined for different wall friction angles as well as soil friction angles. Further, the result predicted by the modified Spangler - Handy solution method is compared with that from the experimental model test on sand. The comparison shows in general good agreements at various stages of retaining wall rotation about its toe. Finally results of analytical parametric study, together with the design charts, are presented to demonstrate the effects of wall friction angles and horizontal acceleration coefficients.
Forest road (10 Km) constructed for the demonstrational purpose by Forest Work Training Center (F.T.C.) in 1984 was partly damaged through the roadside landside and ditch erosion by the typhoon in 1986. The causes were investigated to apply for protecting against the damage of mountain forest road. The damaging length caused by roadside landside is around 3% out of total length of 10 Km forest road, and mostly coming from the curve road filled up more than 10 m slope length on the concave mountain slope, partly from the foot of fillslope along the ever-following valley and from the both side of fillslope under the outlet of culvert with ever-flowing water. In case of ditch erosion, the big damage at V-type ditch is coming from the overflow of valley water flowing down along the inside slope. Other problem is also showing in the steepness of longitudial gradient, which is felt as a problem in road to be constructed under more than 10 persent of gradient. Other cause of ditch erosion is coming from the bury of sand basin (water collecting wall) by the debris in small diameter culvert zone, namely less than 400mm, in diameter and by the soil mass slumped down from steep wall slope. From above results the causes of F.T.C. model road damage is showing to come from no-following the general guide or little experience to protect against the forest road damage. When improved above mentioned mistakes, F.T.C. Method of mountain forest road type could be developed as a model of Mountain forest road.
This paper holds three objects. The first is to analyze surveys of concerning zone and promotion department. The data were collected through an examination of construction excavated in coastal soft (marine) clay and measurements obtained during excavating construction. The second is to observe the appropriate selection and the application of support system on earth retaining wall in soft clay. Lateral deformation behavior during the excavating construction according to the differences in a soft ground pressuring degree was investigated. The third is to compare the results with those of numerical analysis. Therefore, the purpose of this study is to analyze the characteristics of lateral deformation when soft ground improvement for the expansion of infrastructure in object of study zone has been incompleted. Also, it is to identify the relationship between the degree of consolidation of soft ground and lateral deformation, in a method of displacement quantity in compliance with the numerical analysis and a quatitative analysis. In conclusion, displacement of excavated section after consolidation was fewer 60% averagely than section under consolidation.
Lee, Moon Soo;Lee, Byoung Koo;Jeong, Jin Seob;Kim, Chan Kee
KSCE Journal of Civil and Environmental Engineering Research
/
v.14
no.4
/
pp.977-988
/
1994
In this paper, the comparisons between field measurments and numerical results ware performed for the settlements, lateral displacement in Jinwol interchange works on the Honam express way whose site was improved by sand drain for the constructions of over bridges, piers and abutments. The computer program was developed by coupling Biot's equation with Sekiguchi's elasto-viscoplastic model under plane strain conditions. Steel pipe piles for piers were replaced into the equivalent steel sheet pile wall. The characteristics of behavior for both the soil foundations and the sheet piles wall were investigated with the variation of axial force on the wall, rigidity of the wall, supported condition of sheet pile into hard strata and the location of anchored point.
본 연구의 목적은 도시공원 조성시 물리.생태적 여건과 이용을 고려해 건강한 도시공원을 조성하는데 기초자료를 제공하는데 있다. 따라서 본 연구는 서울 서초구 양재시민의 숲(공원)을 대상으로 조성된 공원의 물리.생태적 여건과 이용의 관련성을 조사해 나타난 문제들을 GIS와 설문조사를 통해 분석했다. 조사항목으로 과거토지이용, 현토지이용(성토지역, 동선, 나지, 시설물), 식생(수고, 지하고, 최근색재지, 유실수, 불량식재지), 배수상태, 야간조명, 소음, 이용현황(이용밀도, 이용행태, 접근동선) 등이며 수고+소음, 지하고+이용밀도, 과거토지이용+배수불량, 이용행태+접근동선 등을 중첩해 문제점을 분석했다. 그 결과 본 공원은 식재, 배수, 소음, 이용(주차, 야간이용)등의 문제를 앉고 있으며 이에 대한 해결방안으로는 숲내 공지확보, 수로나 연못설치, 방음벽 설치, 주차장 확보 등이다. 설문조사에서 제안된 시설과 대안으로는 공원주변의 양재 화홰단지와 연계한 화단 및 화훼전시공원(43%), 현공원의 잠재력을 활용한 식물원 혹은 수목원(58%), 과일나무 공원(32%) 등을 들 수 있다. 결과적으로 이공원과 같이 규모가 큰 공원을 조성시에 위와 같은 문제들을 해결하기 위해서는 조성기간중 다양한 문제를 수용할 수 있는 유연한 단계별 계획이 필요할 것이다.
In this study finite element analysis using hyperbolic model was performed to predict the characteristics of stress-strain behaviour on concrete face earth dam (CFED : a tentative name) raised with coarse-grained materials corresponding to the face slab bedding zone of concrete face rockfill dam (CFRD). The results of finite element analysis were compared with field monitoring data, and the comparison showed a good agreement. And, the analysis results including locus of maximum displacement, maximum stress, stress concentration, and irregular load transfer would be used to devise rational field monitoring schemes for construction management and quality control during construction of CFED.
Chun, Byung Sik;Chung, Hyoung Sik;Koh, Yong Il;Lee, Hyoung Soo
KSCE Journal of Civil and Environmental Engineering Research
/
v.11
no.1
/
pp.145-151
/
1991
The final purpose of this study is to examine the uses of coal ash, by-product from thermal power plant as a type of filling-embankment materials and the reuses of ash ponds. In this time, to investigate the dynamic properties, we made the test piece specimen with coal ashes, and obtained the damping ratio. In place(ash pond), the damping property by underground wall was investigated before and after soil improvements. The damping ratio of coal ash test piece specimen of 12% cement is the highest and that of 9% cement or chemical grout, that of 6% cement is in order. In same coal ash test piece, the damping ratio increases with decreasing the void ratio. In conclusion, it could be said that the damping ratio increases with the stiffness of materials. In the ash pond, the damping effect is the most when trench is set through the vibration wave propagation course, and when soil is improved the higher stiffness of the improved soil is, the more damping effect appeared. It is justified to obtain not only the dropping of permeability and the strength increase, but also the damping effect fairly by soil improvements.
The earth pressure acting on underground structure was measured by application of the instrumentation system in the subway construction site constructed by the method of cut-and-cover tunnel. The measured earth pressure was compared with the earth pressure obtained from the existed theoretical equation, and the actual earth pressure diagram acting on the underground structure was investigated. As a result of investigation, the vertical earth pressure is mainly affected by the embankment height, and the lateral earth pressure is significantly affected by whether the existence of earth retaining structures or not. The measured vertical earth pressure is very similar to the theoretical earth pressure proposed by Bierbaumer. The measured lateral earth pressure is closed to the active earth pressure proposed by Rankine rather than the earth pressure at rest. The coefficient of earth pressure in soil deposit layer is about 0.35, and the coefficient in soft rock deposit layer is about 0.21. For design and construction the underground structures, therefore, it is reasonable estimation that the lateral earth pressure acting on structures installed in soil deposit layers is an average value between active earth pressure and earth pressure at rest. In rock deposit layers, the lateral earth pressure acting on structure is an active earth pressure only.
Seo, Min Seok;Lee, Han Hyeong;Hu, Jun Soo;Kim, Soo Keung;Yoo, Young Mi;Lee, Seong Jun
Korean Journal of Heritage: History & Science
/
v.45
no.4
/
pp.114-125
/
2012
The purpose of this study is to analysis chromaticity, granulometry, main chemical composition and mineral crystal structure of wall soils excavated from Poongnatoseong Earthen Castle using color reader, XRD, particla size analyzer. The analysed soils of Poongnatoseong Earthen Castle were yellowish brown and isabella. All samples were sands or sands including silty soil(SW~SC) and showed similar granulometry, chemical composition and mineral crystal structure, which were characteristics of construction materials suitable for modern road or airstrip. As resulting in comparison with 4 factors from chromaticity, granulometry, main chemical composition and mineral crystal structure, we decided that the control soils(PNS) near by Poongnatoseong Earthen Castle were not to be used for the castle wall construction We presumed that there was a huge soil distribution area for the wall construction around Poongnatoseong Earthen Castle. For further study, we will make a comparison analysis all kinds of soil characteristics. And then we can understand correctly about wall soils producing area, construction method, repair method and time of Poongnatoseong Earthen Castle.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.