• Title/Summary/Keyword: 선체 용접

Search Result 96, Processing Time 0.034 seconds

A Study on the Distortion Control for the Penetration Weldments of Pressure Hull (압력 선체 관통구 용접부의 변형 제어에 관한 연구)

  • Kim Ha Geun;Lee Hui Tae
    • Proceedings of the KWS Conference
    • /
    • v.43
    • /
    • pp.254-256
    • /
    • 2004
  • The purpose of this study is to establish the control method of angular distortion at the weldment of the pressure hull penetration. In order to do it, comprehensive experiment and FEA were performed to evaluate the distortion behavior for the weldment of HY-100. Based on the results, a proper deposit sequence for the both sides X groove penetration weldment was established. In addition, a proper welding sequence was proposed by evaluation of bending restraint intensity with size and position of pressure hull penetration.

  • PDF

선체 모델정보를 이용한 가시화 프로그램 개발

  • 최범효;오성권;은선효;임정대
    • Bulletin of the Society of Naval Architects of Korea
    • /
    • v.42 no.3 s.145
    • /
    • pp.36-39
    • /
    • 2005
  • 현재 당사가 보유하고 있는 조선 전용 CAD시스템은 모델링을 통해 도면제작 기능까지 일관하게 제공하고 있지만 시뮬레이션이나 3D 가시화를 위한 시스템이 부재한 실정이다. 이에 상용 기술인 VRML을 이용하여 선박 블록 및 ASSY별 형상을 가시화 하고, 그 형상정보에 생산에 필요한 정보를 포함하여 쉽게 Navigation 및 Walkthrough가 가능하다. 이런 가시화 기술을 기간 ERP 시스템과 접목하여 용접로봇 시스템을 개발하였고, 공정 스케줄에 따라 용접로봇 시스템에 필요한 형상정보를 생성해 용접 NC Data를 생성한다.

  • PDF

Development of a New Climbing Mechanism for Inter-Block Welding in Shipbuilding (선체 블록내 용접을 위한 새로운 승월 메커니즘 개발)

  • 정원지;김기정;김성현;박명환;신기수
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2004.10a
    • /
    • pp.434-437
    • /
    • 2004
  • This paper presents the development of a new climbing mechanism for inter-block welding in Shipbuilding. The climbing mechanism is that it is career type of robot that can pass over block interval for welding of interblock in shipbuilding. The point part of mechanism is that move ballscrew. The Ballscrew`s capacity account and dynamic analysis of leg part are achieved through this paper. Force and torque analysis were achieved by simulation. This can have strong point in side of cost-cutting and welding amount of work than existent method.

  • PDF

안벽 방충재의 개선에 관한 연구(1)

  • Sin, Yong-Ju;Jeong, Tae-Gwon
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2011.06a
    • /
    • pp.355-358
    • /
    • 2011
  • 방충재(fender)는 항만에서 선박의 안전한 접이안, 계류, 안벽 보호를 하기 위하여 설치된 중요한 안벽 시설 중 하나이다. 기존의 고무 방충재는 접안력에 의한 초기 변형 28% 정도에서 가장 높은 반력이 발생하기 때문에 선박과 안벽에 지속적인 힘을 주기 때문에 안벽 및 선체에 손상을 주고 있다. 이는 잔교식이나 중력식 부두에서도 나타나는 현상이다. 또 선체의 용접 비드에 의하여 방충재 훼손으로 보수 유지비가 증가하고 안벽에 앵커로 고정된 고무 펜더는 유연성이 떨어져 선박 충격에 의한 쉽게 떨어지고 패널패드도 탈락된다. 이 연구에서는 초기 반력이 적은 에어 펜더 혹은 폼 펜더를 제안한다.

  • PDF

A Study on the Prediction and Control of Welding Deformations of Ship Hull Blocks (선체 블록의 용접변형 예측 및 제어를 위한 연구)

  • C.D. Jang;C.H. Lee
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.37 no.2
    • /
    • pp.127-136
    • /
    • 2000
  • Welding deformations reduce the accuracy of ship hull blocks and decrease the productivity due to correction work. Preparing an error-minimizing guide at the design stage will lead to a high quality as well as high productivity. And a precise method to predict the weld deformation is an essential part of it. This paper proposes an efficient method to predict complicated weld deformations based on the inherent strain theory combined with the finite element method. The inherent strain is determined by the highest temperature and the degree of restraint. In order to calculate the inherent strain exactly, it is considered that the degree of restraint becomes different according to the fabrication stages in real structures. A simulation of a stiffened plate shows the applicability of this method to simple ship hull blocks.

  • PDF

A Study of the Arc Stabilization for Tandem EGW (탄뎀 EGW 기법의 아크 안정화 연구)

  • Hong, Tae-Min;Park, Jong-Min;Kim, Jin-Yong;Huh, Man-Joo
    • Proceedings of the KWS Conference
    • /
    • 2009.11a
    • /
    • pp.15-15
    • /
    • 2009
  • 최근 컨테이너선은 점차 대형화되고 있으며, 이에 따라 선체의 외판 상부의 철판 두께도 최대 80mm 까지 설계되고 있다. 블록 외판의 수직 맞대기 용접의 경우 고능률 용접기법인 Electro Gas Weldig(이하 EGW)이 적용되고 있으나, 극 후판의 경우, 기존의 한 개의 전극만으로는 적용 가능한 두께 범위의 한계가 있어 수직 맞대기 용접의 용접생산을 향상시키기 위해 2개의 전극을 사용하는 탄뎀 EGW 기법에 의한 시공법이 고려되었다. 탄뎀 EGW 기법의 시공법에 관한 보고서는 국내외에서 많이 발표되어져 왔다. 하지만 실선 적용에 있어 두께 80mm, 길이 2M 이상의 철판을 안정적으로 용접하기 위한 장애요소는 용접 중 적절한 슬래그의 배출 조절이다. 두개의 용접 와이어를 동시에 공급할 때 발생하는 슬래그를 균형있게 배출하지 못하는 경우 용융, 금속 상부에 적층되는 슬래그의 양이 증가하게 되고, 아크는 불안해져서 전극팁에의 슬래그 부착, 전극 팁의 발열 등에 의한 요인들이 송급을 불안하게 하여 연속 용접이 어려워진다. 본 연구에서는 탄뎀 EGW 기법을 실제로 현업에 적용하기 위해서는 안정적인 슬래그 배출에 착안하여 동당금의 형상에 따라 슬래그의 배출 성능을 확인하고 형상별 전류, 전압 파형을 측정하고, 파형 결과에 따라 아크 안정성을 평가함으로서 탄뎀 EGW 용접기법에 적정한 동당금을 설계한 결과를 소개하고자 하였다.

  • PDF

A study on welding connection's fatigue analysis through numerical and experimental approaches (용접이음부의 피로강도 해석을 위한 수치해석과 실험과의 비교연구)

  • 조규남;하우일
    • Computational Structural Engineering
    • /
    • v.6 no.3
    • /
    • pp.113-123
    • /
    • 1993
  • Most of the ship structures and offshore structures are constructed through the welding and they are always subjected to variable loads. In this study, fatigue and stress concentration of the various types of welding connections due to the variable loads are investigated by using numerical approach, and comparisons between numerical analysis and experiments are performed. Fillet weld, full penetration weld and partial penetration weld characteristics are studied by using parameters such as penetration length, welding leg length, size and penetration angle. Based on this study, it is suggested that the fillet welding can be replaced with the penetration welding in some cases. The results of this study can be used as guidelines for actual welding problems in the shipyards.

  • PDF

STEP Ship Model 개발 동향

  • 김용대
    • Proceedings of the CALSEC Conference
    • /
    • 1997.11a
    • /
    • pp.347-354
    • /
    • 1997
  • 많은 사람들이 다가오는 21세기는 정보화의 시대라고 말한다. 그러면 10년 후의 조선소 모습은 오늘날과 어떻게 달라질까\ulcorner 아마도 주요치수를 정하고 선형설계, 구획배치, 선체설계 및 의장설계 등의 설계과정을 거친 다음 철판을 잘라내고 다시 용접하여 부품을 만들고 그것들을 조립한 다음, 각종 기자재들을 설치하여 배를 만드는, 조선공학적인 측면에서의 전통적인 업무흐름은 크게 달라지지 않을 것이다.(중략)

  • PDF