• Title/Summary/Keyword: 선제적 안전관리

Search Result 96, Processing Time 0.027 seconds

산업보건세미나 종합토론 발표자료1 - 유해 폐기물 취급 근로자의 선제적 건강관리방안

  • Jo, Gi-Hong
    • 월간산업보건
    • /
    • s.327
    • /
    • pp.63-66
    • /
    • 2015
  • 협회는 '제48회 산업안전보건강조주간'을 맞이하여 "유해 폐기물 취급 근로자의 선제적 건강관리 방안"을 주제로 세미나를 개최했다. 주제발표 자료는 협회에서 배포한 자료집이나 안전보건공단에서 제작한 CD에 수록되어 있다. 종합토론 자료는 토론자의 수정을 거쳐 '산업보건'에 게재하기로 했다.

  • PDF

Smart Disaster Safety Management System for Social Security (사회안전을 위한 스마트 재난안전관리 시스템)

  • Kang, Heau-jo
    • Journal of Digital Contents Society
    • /
    • v.18 no.1
    • /
    • pp.225-229
    • /
    • 2017
  • In this paper, various units of industrial disaster safety threats as well as local and national facilities unit real-time detection and prevention refer to the corresponding system goes into disaster management preparedness, prevention, response recovery of phase I systematic ICT skills that can be managed more efficiently. In addition, the immediate disaster prevention and preparedness for early forecasting preemptive damage scale and high-tech information exchange technology to overcome the limitations of a human disaster in the field against the analysis and strategy of preemptive disaster safety management with smart risk management and prevention in response and recovery and the scene quickly and efficient mutual cooperation and effective collaboration and cooperation of the Community Center social security presented a smart disaster safety management system.

A Study on the Improvement of Aviation Safety Management System through Analysis of Legal System and Data Status (법제도 및 데이터 현황 분석을 통한 항공안전관리시스템 개선방안 연구)

  • Hae-yoon Byeon;Hyun-Jin Jeong
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.105-116
    • /
    • 2023
  • Purpose: The purpose of this study is to present the preemptive prevention and improvement measures for aviation safety management by examining the current status of the aviation industry and the operation system of the aviation safety management system and identifying the shortcomings of the currently operating aviation safety management system. Method: A plan to improve aviation safety management was proposed through an analysis of recent incidents and accidents, current status of domestic laws, and analysis of overseas operating institutions and safety management systems. Result: Through the recent aircraft safety-related incidents, deficiencies of currently operating aviation safety management, and response cases of advanced countries in overseas aviation, improvement points in terms of management systems and laws and preventive aviation safety management plans were derived. Conclusion: The method for improving aviation safety management was presented based on the technique using data, and it should be materialized through additional related research.

준해양사고 데이터분석을 통한 VTS중심의 해양안전관리체제

  • Hong, Seok-In;Gang, Gwon-Hong;Lee, Yong-Eun;Kim, Jin-Hui;Park, Jong-Su
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2013.06a
    • /
    • pp.385-387
    • /
    • 2013
  • 기존의 해양사고 데이터에 기반한 해양안전관리체제에서 준해양사고 중심의 데이터 분석을 통하여 보다 선제적인 해양사고 예방시스템 구축에 대하여 고찰하는 한편, 인천VTS의 사례로 준해양사고 데이터 기반의 해양안전관리체제를 살펴보고, 그 중심에서 VTS의 기능을 확장할 수 있는 방안에 대하여 총체적으로 연구함

  • PDF

Establishment of KST's Mid to Long-Term Strategy for Stable Operation of Maritime Traffic Safety Assesment (진단제도 안정적 운영 및 고도화를 위한 공단의 중장기 대응전략 수립)

  • Kim, Bu-Young;Bak, Jeong-Dae
    • Journal of Korea Ship Safrty Technology Authority
    • /
    • s.34
    • /
    • pp.46-53
    • /
    • 2013
  • 본 연구는 능동적이고 선제적인 진단제도의 안정적 효율적 관리를 위하여 진단제도상공단의 중장기 대응전략을 수립하고자 한다. 특히, 현재 진단제도의 운영현황, 문제점 분석을 통하여 진단제도의 개선방안을 도출하고 의견수렴을 통한 개선방안에 따른 공단 대응전략을 수립하여 국내유일의 진단제도 전문기관 역할수행 및 수익모델 발굴을 위한 로드맵으로서 활용하고자 한다.

  • PDF

Development of Site Management System for Temporary Facility Construction Using Back Analysis (역해석을 이용한 가시설공사 현장관리 시스템 개발)

  • Yun, Youngman
    • Journal of the Society of Disaster Information
    • /
    • v.15 no.4
    • /
    • pp.570-577
    • /
    • 2019
  • Purpose: The purpose of this study is to develop a system that enables quick on-site response using real-time decision-making by sharing the results of measurement and management performed in the field for safe temporary construction. Method: It is possible to take preemptive responses during construction by identifying the safety factors of construction conditions from measurement results and determining the risk factors such as soil properties and variability of climate change that can occur during construction by simultaneously using the back analysis method reflected in the measurement system and structural review. Result: we developed a back analysis algorithm of the SUNEX program to cope with the discrepancies between the design results and measured results due to inconsistency between site conditions and design properties, unexpected loads, and outdoor environment. The process of matching the measurement result with the analysis result can be confirmed in the safety management system. Conclusion: Gateway was used to communicate with real-time measurement results and safety management system program. It was made possible to preemptively respond to risk factors that may occur in the field.

정책 - 제2차('17~'21년) 원자력안전종합계획

  • 한국원자력산업회의
    • Nuclear industry
    • /
    • v.36 no.12
    • /
    • pp.2-10
    • /
    • 2016
  • 원자력안전위원회는 12월 8일 제62회 원자력안전위원회를 개최하고, '제2차('17~'21년) 원자력안전종합계획안'에 대한 심의를 거쳐 동 계획을 확정하였다. 제2차 종합계획은 '국민이 공감하는 원자력 안전, 방사선 위험으로부터 안전한 사회'를 비전으로 원자력, 방사선 및 핵안보 등 분야별 안전 강화를 위한 7대 전략 21개 중점 추진 과제를 포함하고 있다. 주요 내용은 ${\triangle}$정상 운전부터 중대사고까지 원전의 안전 관리 강화, ${\triangle}$정보 공개 소통을 통한 투명성 제고, ${\triangle}$해체 사용후핵연료 등 원자력산업의 후행주기 안전 관리 체계 구축, ${\triangle}$지진 등 재난대비 및 방사능 비상 대응 체계의 실효성 제고, ${\triangle}$핵안보 핵비확산체제의 국제사회 선도, ${\triangle}$환경 변화에 대응한 선제적 방사선 안전 관리, ${\triangle}$R&D, 인력 양성, 국제 협력 인프라 확충 등이다. 원자력안전종합계획은 "원자력안전법"에 근거하여 5년 단위로 수립되는 원자력 및 방사선 안전 관련 최상위 국가 계획이다.

  • PDF

Build on Integrated Operation·Management System of Disaster Management Regulations (방재심의제도 통합 운영·관리 체계 구축)

  • Jung, Do Joon;Joo, Jae Seung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.644-644
    • /
    • 2015
  • 최근 국가적 차원에서 자연재해대책법에 근거한 여러 방재심의제도를 운영하고 있다. 그 중 최상위 계획인 풍수해저감종합계획을 통하여 저감대책을 마련하고, 위험지구에 대한 대책과 사업을 시행중에 있다. 그러나 방재업무를 진행하는 중앙부처와 지자체, 방재대행업체자 등에서는 심의보고서간의 자료공유와 접근성이 미약하고 잦은 담당자 변경으로 인한 심의보고서 보관과 관리가 힘든 실정이다. 또한 제도간의 연계와 환류기능이 미흡하여 제도별로 산재되어 있는 부분이 많으므로 통합적으로 관리할 수 있는 운영체계가 필요하다. 따라서 본 연구에서는 풍수해 방재심의제도를 통합적으로 운영하고 관리하기 위한 시스템을 구축하는 것이 최종 목표이며, 이를 위해 우선적으로 풍수해저감종합계획 수립제도를 시범적으로 적용하여 운영 관리할 수 있는 시스템 기반을 마련하였다. 또한, 향후에 있을 방재심의제도별 통합적인 운영을 위해 선제적으로 재해위험지구 정비사업과 구성항목의 데이터 연계성을 분석하였으며, 이를 바탕으로 제도별 연계 시스템을 설계하여 제시하였다.

  • PDF

Deriving AR Technologies and Contents to Establish a Safety Management System in Railway Infrastructure (철도 인프라 안전 관리 시스템 구축을 위한 AR 기술 및 콘텐츠 도출)

  • Jeon, Hae-In;Yu, Young-Su;Koo, Bon-Sang;Seo, Hyeong-Lyel;Kim, Ji-Hwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.3
    • /
    • pp.427-438
    • /
    • 2022
  • With the recent growing importance over safety management the need for advanced and technical approaches for on-site safety inspection methods has increased. Railway construction is subject to its own particular set of temporal and spatial challenges due to its unique facilities and equipment. This study aimed to investigate the field characteristics of railway infrastructure and improve the conventional field safety management methods by identifying the most appropriate features of AR technology. Group interviews and surveys were conducted with field safety experts to derive the major problems and inspection needs. Subsequently, various features of AR, such as BIM model projection, and remote conferencing, were investigated to determine their applicability to address safety issues. As a result, four problems in the current safety management process, such as 'lack of time due to the conventional inspection method and inspection of areas that are difficult to access', and three major inspection types, such as 'observance of work procedures, status of installation, adequate dimensional spacing', were identified to be improved when adopting AR based techniques. Furthermore, AR technology utilizing plans to solve safety inspection problems and effectively manage major inspection types were proposed, and a follow up survey was conducted with the same field safety experts to derive the priority of technology development.