• Title/Summary/Keyword: 선정평가 항목

Search Result 922, Processing Time 0.034 seconds

A Study on Decisions of Selection Factors in the Fishing Village New-deal 300 Project Using the Analytic Hierarchy Process (계층의사분석 기법을 적용한 어촌뉴딜 300사업의 선정 결정요인 연구)

  • Kim, Dong Min;Kim, Gunwoo
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.28 no.5
    • /
    • pp.692-699
    • /
    • 2022
  • The fishing village new-deal 300 project covers 300 fishing villages and ports for integrated development including reforming backward facilities and utilizing regionally indigenous resources for specialized programs. An analysis was conducted to decide selection factors in the fishing village new-deal 300 project through the expert interview based on AHP(Analytic Hierarchy Process). The results of high-class appraisal items showed that the weights were ranked in the order of the development conditions and basic plan, project effects, project plan, and project execution and management. The project effect obtained 15.57 point in the AHP analysis, whereas the guideline stipulated the point as 6 point for the project effect item, The derived weights for each appraisal item in this study will hereafter be referred in determining the assessment points for the fishing village and port development projects.

A Study on the Effect Range Due to the Dam Operation at the Downstream (댐 운영이 하류하천에 미치는 영향권 범위 설정에 관한 연구)

  • Park, Bong-Jin;Kim, Hyeon-Sik;Jung, Kwan-Sue;Ji, Hong-Ki
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.444-448
    • /
    • 2008
  • 본 연구는 댐이 하류하천에 미치는 영향권 산정을 위한 지표를 선정하고, 계층분석기법을 적용하여 선정된 평가지표의 중요도를 조사하였다. 댐의 영향권을 산정하기 위하여 수리 수문적, 지형적, 환경 생태적, 사회적 영향이라는 4개 지표와 댐계획홍수량 등 38개 평가항목을 선정하였다. 계층분석법을 적용 전문가 집단의 설문조사를 실시하여 4개 지표와 38개 항목의 중요도를 조사하였다. 평가지표는 수리 수문적 영향권이 1순위, 환경 생태적 영향권이 2순위, 지형적 영향권 및 사회적 영향권이 각각 3순위와 4순위 이었으며, 평가항목은 댐설계방류량이 1순위, 하천의 기본 및 계획홍수량이 2순위, 계획홍수량비가 3순위, 유역면적비가 4순위, 하류댐 배수위가 5순위로 조사되었다.

  • PDF

A Case Study on the Evaluation Framework of a New Service Model in the Public Sector: Focusing on the Mobile Application Project (공공기관 지원사업 선정평가 프레임워크 개발 및 적용: 모바일 앱 서비스 지원사업 선정사례 중심)

  • Bae, Junseong;Kim, Eunhee;Koh, Joon
    • Information Systems Review
    • /
    • v.14 no.2
    • /
    • pp.117-140
    • /
    • 2012
  • It is hard, but important to evaluate and select a new service model for the public sector, accompanying unexpectable risk. The purpose of this study is to build and develop the evaluation framework of public projects and to present a project evaluation system which is more rational and methodical. The evaluation framework has been developed by calculating the evaluation criteria and weights resulted from an interview with an expert group and Analytic Hierarchy Process(AHP). Moreover, market-oriented characteristics, technology-oriented characteristics, service development capabilities and policy-oriented characteristics were predominantly chosen as the evaluation items. The re-evaluation of the app development support programs was conducted to check the feasibility as an evaluation system influencing the performance of firms. The result of an evaluation system proposed by this study showed better evaluation performance than previous ones, better predicting the actual business performance. Currently, though the policies of the public sectors and support programs focus on the outcome and performance management, the result of this study shows the importance of project selections. Also, implications of the study are discussed.

  • PDF

An Analysis on the Pre-Feasibility Evaluation Factors of Activation for Welfare Facilities for the Residents in Apartment Building (공동주택 주민복지시설의 활성화를 위한 사전 타당성 평가요인 분석)

  • Kim, Young-Hoon;Kang, Hyun-Wook;Won, Yoo-Man;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.160-167
    • /
    • 2011
  • An Analysis on the Pre-Feasibility Evaluation Factors of Activation for Welfare Facilities for the Residents in Apartment Building. The adapted research method of selected case five apartment building in D new town and carried out questionnaire survey to residents and user for draw items of feasibility evaluation. Drew items of feasibility evaluation classify as Plan section, Design section, and Operation section and evaluate the weight of each section utilizing analytical hierarchy process (AHP). Depending on the purpose and methods. The results of this study are as follows: Such as Plan section, Composition of Program Facility, User Charge Survey, Arrangement of Program Room were analyzed highest. Such as Design section, Arrangement of Program Room, Circulation planning, Educational Equipment were analyzed highest. And such as Operation section, Operation costs, Operation Plan, Review of Program Facility were analyzed highest.

A Study on Site Selection for Floating Architecture (플로팅 건축물 입지선정에 관한 연구)

  • Lee, Han-Seok;Gang, Yeong-Hun
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2011.06a
    • /
    • pp.209-210
    • /
    • 2011
  • 최근 다양한 수해양공간개발계획에 있어 플로팅 건축물 도입에 대하여 긍정적인 관심이 증가하고 있다. 플로팅 건축물은 수상에 부유식 구조체 형식으로 조성되는 거주용 시설로 육역의 일반 건축물과 비교하여 수역에 위치하는 점과 구조체가 부체인 점에서 그 특성이 있다. 이러한 플로팅 건축물의 건설을 위해서는 플로팅 건축물 특성에 따른 장단점을 파악하여 적당한 입지를 찾는 것이 가장 중요하다. 본 연구에서는 플로팅 건축물 입지선정을 위해 고려해야하는 다양한 전제조건을 검토하여 플로팅 건축물 입지평가항목을 도출하고 전문가 설문조사를 통하여 각 평가항목별 가중치를 설정하여 플로팅 건축물 입지평가기준을 제시하였으며 입지평가기준을 바탕으로 전남과 전북지역을 대상으로 플로팅 건축물 입지를 선정하였다.

  • PDF

A Study on the Evaluation Management of Public Housing Architectural Competition using BIM (공공 공동주택의 BIM적용 설계 경기 평가관리에 한 연구 - BIM적용 가능 평가항목 선정을 중심으로 -)

  • Min, Byoung-Jik;Lim, Jae-Bok;Kim, Ju-Hyung;Seo, Jong-Won;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.2 no.2
    • /
    • pp.1-9
    • /
    • 2012
  • In Korea, recently, efforts have been made to introduce BIM(Building Information Modeling) to housing complex projects. However, there have been several problems including excessive competition for building design and outcome-oriented evaluation due to a lack of clear evaluation criteria and poorly organized management process. Under this circumstance, the study surveyed opinions of project managers and conducted a pilot test to improve evaluation criteria of BIM-based design for housing complexes. The objective is to assess the level of BIM technology and its applicability, and to propose a list of reasonable evaluation criteria for better project management. First, the study examined the current condition of evaluation on the BIM-based housing complexes, and identified 15 preliminary items that might be suitable for application of BIM. Second, the study conducted a pilot test for the 15 items to determine their suitability for the level of BIM technology, clarity of the calculation process, and the extent of fulfilling information quality, and short-listed eight items for application of BIM. In particular, in the design concept stage, mostly 3D visual images and area-related items are suitable for BIM-based evaluation. Accordingly, formerly used items such as project cost, energy and environmental analysis, building structure, and facilities were deemed more relevant to the subsequent stages of basic design and its implementation.

(D)Analysis of the 8th Heat Treatment Technic Contest (제 8회 열처리기술 경기대회 분석 (II) -금형열처리 부문-)

  • Hong, Yeong-Hwan
    • Journal of the Korean Society for Heat Treatment
    • /
    • v.15 no.1
    • /
    • pp.25-28
    • /
    • 2002
  • 그동안 열처리기술 경기대회는 열처리공업 협동조합의 주관으로 치루어졌었는데, 올해에는 처음으로 한국열처리공학회에서 주관하여 치루게 되었다. 경기종목과 경기요령은 기존의 방법을 거의 그대로 사용하였고, 평가항목과 심사기준도 일부 변경하기는 하였지만 대부분 그대로 적용하였다. 경기종목 선정과 분석결과에 대하여 일부 논란이 있었지만 현실적으로 주어진 여건하에서 국내 열처리업체의 기술수준을 평가할 종목선정에 제한적일 수 밖에 없었으나, 앞으로 새로운 종목의 발굴도 필요하리라 사료된다. 또한 평가항목의 심사기준도 좀더 면밀히 검토하여 업체의 기술수준이 드러나도록 심사기준의 설정이 요구된다. 비록 완전하게 치루어진 경기대회라고 평가할 수는 없지만 그래도 객관적이고도 공평한 분석으로 평가가 이루어지도록 노력하였고, 차후로는 더욱 섬세하고 객관적인 평가항목으로 공정한 평가가 이루어지도록 배전의 노력을 기울여야 할 것으로 사료된다. 끝으로 이러한 열처리기술 경기대회를 통하여 국내열처리업계의 기술수준이 조금이나마 제고되는 기회가 되길 바라며, 열처리업계의 적극적인 참여를 바라마지 않는다.

Site Suitability Analysis Using Theory of Games (게임이론을 이용한 적지분석)

  • Lee, Sang-Sin;Lee, Sang-Il
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.275-279
    • /
    • 2005
  • 수자원 개발에 있어 중요한 문제 중의 하나는 개발가능지의 선택과 후보지가 복수일 때 개발 우선순위를 결정하는 것이라 할 수 있다. 이러한 문제 해결을 위하여 적지분석을 실시한다. 적지분석 과정은 크게 기초 조사 및 자료수집, 예비후보지의 선정, 대안평가, 입지선정의 :t단계로 구분되는데 여기서 2-3단계인 예비후보지 선정과 대안평가 단계가 적지분석 기법이 적용되어야 할 과정이다. 기존의 의사결정 방법론들은 각 대안의 우선순위를 위해 각 항목들에 대한 가중치나 확률치를 이용한 수치적 계산에 의한 방법들이 대부분이며, 또한, 각 후보지에 대해서 동일한 항목에 대한 정보를 요구하게 되어 한 후보지이라도 정보가 없는 경우 우선순위를 위한 계산과정에서 제외하거나 결정자의 경험 등에 의한 추정 값을 사용할 수밖에 없다. 이러한 이유로 본 연구에서는 입지선정에서 대상 후보지의 인자비교를 위한 항목의 자료 유무에 관계없이 적지분석이 가능하도록 게임이론을 적용하여 수자원 개발 가능 후보지를 도출하기 위한 기본모형을 개발하였다.

  • PDF

Alternative Evaluation Technique for the High-rise Building Structural System (초고층 건물 구조시스템의 대안평가기법)

  • Kim, Yeong-Min;Lee, Dong-Woo;Lee, Han-Joo;Lee, Sang-Joo
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.243-246
    • /
    • 2010
  • 본 연구에서는 초고층 건물의 구조시스템에 대한 다양한 대안으로부터 각 대안의 성능을 합리적으로 평가하는 방법을 연구하였다. 이를 위해 우선, 대안평가를 위한 평가항목과 각 평가항목별 평가기준을 도출하고, 도출된 기준에 따라 평가결과를 산정하는 방법을 제안하였다. 그리고 평가항목간의 관계와 평가항목의 중요도를 산정하고, 퍼지적분을 이용하여 평가결과를 종합화하는 방안을 제안하였다. 평가항목은 크게 세가지로 이에는 구조성능, 경제성, 공기가 있다. 대안에 대한 평가는 예비평가, 본평가, 실시평가의 세 단계로 이루어지며, 각각 보수적인 관점에서와 낙관적인 관점에서의 평가를 실시하고 주어진 평가결과를 바탕으로 최종적으로는 엔지니어가 대안을 선정하는 방향으로 평가를 진행한다.

  • PDF

Weight setting of major environmental assessment items using Analytical Hierarchy Process - Case for the selection of railroad route - (계층분석법을 통한 환경영향평가 중점항목의 가중치 설정 - 철도사업 노선선정을 대상으로 -)

  • Lee, Minjoo;Kim, Minkyung;Lee, Sangdon
    • Journal of Environmental Impact Assessment
    • /
    • v.23 no.6
    • /
    • pp.517-526
    • /
    • 2014
  • This paper performed studies on a guide for an environmental assessment necessary to select railroad route optimally, and presented techniques for an environmental friendly route selection using AHP(Analytical Hierarchy Process) as an objective method. The AHP is an approach to decision making that involves multiple choice criteria into a hierarchy and assessing the relative importance of each criterion, and determining an overall ranking of the alternatives. For the purpose of this study, we established the weight and the order of major environmental assessment items based on the survey of experts. The results of the weight by AHP were in order of Fauna & Flora, Topography & Geology, Nature Environmental Assets, Noise & Vibration, Water Quality, Landscape and Air Quality indicating natural environment should be in priority. To develop the more efficient environmental friendly route selection systems, it is necessary to consider economical, technical, and social aspects in addition to environmental consideration.