• Title/Summary/Keyword: 선박 오수

Search Result 23, Processing Time 0.018 seconds

Shipboard sewage treatment using Membrane Sequence Batch Reactor (MSBR을 이용한 크루즈선 오·폐수 처리 장치)

  • Kim, In-Soo;Lee, Eon-Sung;Oh, Yeom-Jae;Kim, Eog-Jo
    • Journal of Navigation and Port Research
    • /
    • v.34 no.5
    • /
    • pp.383-388
    • /
    • 2010
  • Lab scale experiment study was carried out for biological process development on cruise. SBR(Sequence Batch Reactor), MBR(Membrane Bioreactor), and MSBR(Membrane Sequence Batch Reactor) system were investigated for practical application on shipboard sewage treatment. From the results it was suggested that MSBR system might be suitable process for cruise in terms of pollutant removal efficiency, maintenance and special environmental conditions of cruise. About 99% of BOD, 98% of COD and 99% of SS were removed in MSBR system. In addition, about 76% of total nitrogen was reduced and the total phosphorus reduction averaged 59%.

Advanced Treatment of Shipboard Sewage by SBR Process with BM (BM 미생물제제를 이용한 크루즈선 오·폐수 고도처리)

  • Kim, In-Soo;Chang, Jae-Soo;Lee, Eon-Sung;Koh, Sung-Cheol
    • Journal of Navigation and Port Research
    • /
    • v.36 no.8
    • /
    • pp.643-649
    • /
    • 2012
  • Lab scale experiment study was carried out for biological treatment process development in cruise. SBR(Sequence Batch Reactor) process with BM(Beneficial Microorganisms) was investigated for practical application on shipboard sewage treatment. From the results it was suggested that SBR process with BM might be a suitable process for advanced cruise sewage treatment in terms of decrease in T-N and T-P, maintenance of useful microorganisms and control of sludge bulking. By adding BM to SBR system, about 40% of EPS in sludge was increased, about 74% of total nitrogen was reduced and the total phosphorus reduction averaged 75%.

Feasibility Study of a Shipboard Sewage Treatment Plant (Sequencing Batch Reactor and Membrane Bioreactor) in Accordance with MARPOL 73/78, Focusing Mostly on Nutrients (T-N and T-P) (MARPOL 73/78의 기준에 따른 선박오수 처리 장치(SBR 및 MBR 복합공정)의 사용 가능성 평가 : 영양염류 위주 (T-N 및 T-P))

  • Jung, Jin-Hee;Youn, Young-Nae;Choi, Young-Ik
    • Journal of Environmental Science International
    • /
    • v.25 no.9
    • /
    • pp.1233-1239
    • /
    • 2016
  • This study aimed to evaluate changes in the TN and TP removal efficiencies, depending on whether or not a settling process is applied, in a sequencing batch reactor (SBR) process with a membrane bioreactor (MBR). Nutrient removal was considered in terms of developing an advanced water treatment system for ships in accordance with water quality standards set forth by 227(64). For these purposes, the TN and TP concentrations in the inflow and outflow water were measured to calculate the TN and TP removal efficiencies, depending on whether or not a settling process was used. Water discharged from a bathroom, which was constructed for the experiment, was used as the raw water. The experiment that included a settling process was conducted twice, and the operating conditions were: aeration for 90 min, settling for 30 min, agitation for 15 min, and settling for 15 min for one experiment; and aeration for 150 min, settling for 45 min, agitation for 15 min, and settling for 15 min in the other. Operating conditions for the experiment that did not include a settling process were: aeration for 180 min and agitation for 60 min. The concentration of the mixed liquor suspended solids (MLSS) in the reactor was 3,500 mg/L, while the aeration rate was 121 L/min and the water production rate was 1.5 L/min. For the two experiments where a settling process was applied, the average TN removal efficiencies were 44.39% and 41.05%, and the average TP removal efficiencies were 47.85% and 46.04%. For the experiment in which a settling process was not applied, the average TN removal efficiency was 65.51%, and the average TP removal efficiency was 52.51%. Although the final nutrient levels did not satisfy the water quality standards of MEPC 227(64), the TN and TP removal efficiencies were higher when a settling process was not applied.