• Title/Summary/Keyword: 선로조건

Search Result 199, Processing Time 0.024 seconds

Numerical Analysis of Railway Roadbed Stability with Respect to Underground Cavities and Rock Condition: A Case Study of Shafts at Majang Mine (전산해석을 통한 지하 공동 및 암반 조건에 따른 철도지반 안정성 평가: 마장광산 갱도를 대상으로)

  • Jang, Kyunghwan;Lee, Dongwon;Min, Kyungnam;Chung, Chanmook;Yu, Jaehyung;Lee, Gyeseung
    • The Journal of Engineering Geology
    • /
    • v.31 no.3
    • /
    • pp.295-306
    • /
    • 2021
  • This study used numerical modeling to investigate the stability of railway roadbed in areas with various underground cavities and rock conditions associated with mining activities. It compared combined loads from both passenger and freight trains with loads from only passenger trains. Stability was assessed with reference to the Korean government standards for railway subsidence allowance and railway warping repair. Sufficient stability regarding the railway subsidence allowance standard was not achieved when cavities were at depths of <5 m. The criteria for requiring railway warping repair were met when cavities were at depths of <15 m, depending on the rock fracture condition. This study provides the first report on systematic analysis land subsidence related to cavity size and rock fracture conditions associated with mining activities. We expect that this study could serve as an important reference for railway construction in mining areas.

Simulation and Testing of the Effect of Current Collection Performance According to Pre-sag in 400km/h Overhead Contact Lines (400km/h 전차선로에서 사전이도가 집전성능에 미치는 영향에 대한 시뮬레이션 및 시험)

  • Kwon, Sam Young;Cho, Yong Hyeon;Lee, Kiwon;Oh, Hyuck Keun
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.3
    • /
    • pp.288-296
    • /
    • 2016
  • A 400km/h simple catenary system was constructed as a test line in Korea. In the design stage of this system, the pre-sag was one of the engineering issues most focused on. It is known that the pre-sag improves the current collection performance in a certain band of high speed. However, the effect of pre-sag at 400km/h has not yet been established. To grasp a better pre-sag in the 400km/h catenary, we transacted the dynamic performance prediction simulation between catenary and pantograph under conditions of 0 and 1/3000 pre-sag. The level of 0 pre-sag was adapted for the 400km/h catenary design after reviewing predictions. We constituted the 1/3000 pre-sag sample section (about 1km) while constructing the 400km/h catenary test-bed (28km) of 0 pre-sag. With a HEMU-430X train, the contact forces were measured in the test-bed including the pre-sag sample section. In this paper, the predicted and measured dynamic performance values (contact forces) for 0 and 1/3000 pre-sag are described and compared. It is conclusively confirmed by analytical and experimental examination that the non pre-sag showed better dynamic (current collection) performance than that of the 1/3000 pre-sag for the 400km/h catenary system.

The Effect and Countermeasures of the Vertical Track Settlement Caused by Expand and Contract Behavior of the High-Speed Railway Bridge Girder (고속철도 교량 바닥판의 온도신축작용이 궤도처짐에 미치는 영향과 대책에 관한 연구)

  • Kang, Kee Dong
    • Journal of Korean Society of Steel Construction
    • /
    • v.17 no.6 s.79
    • /
    • pp.673-679
    • /
    • 2005
  • According to continuous welded rails on a bridge, temperature changes bring about the expansion of the bridge deck,adding axial forces on the track. Moreover, the ballast on the bridge deck expansion joint is moved due to the bridge deck. The longer the bridge deck is, the greater the influence will be, loosening the ballast, causing track irregularities, and deteriorating passenger comfort. Considering the structure of the bridge itself and tolerance for track irregularities caused by the loosened ballast on the bridge, the maximum length of the deck should be less than 80 m, which is the same as the standard of French railways. In this study, the interaction between the expansion related to the bridge length and the irregularity in the longitudinal level, referring to measurements and maintenance work performed in high-speed railways, was analyzed. This research shows that the installation of a sliding plate or a vertical ballast stopper is not a good option, since it is difficult. On the other hand, the installation of a ZLR fastener or gluing is easy, but its influence is insignificant. In conclusion, switch tie tamping or manual tamping is more effective than other methods of what?

Study on the Behavior of Curved Track in Honam High-Speed Line considering the Running Performanace for HEMU 430-X (HEMU 430-X 주행특성을 고려한 호남고속철도 곡선궤도구조의 거동연구)

  • Kang, Yun-Suk;Um, Ki-Young;Kim, Seog-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.8
    • /
    • pp.4068-4076
    • /
    • 2013
  • The wheel-rail interaction forces are influenced by the velocity of vehicle, wheel load, alignment (curve radius, cant etc). For the safety of track structure, it is required to evaluate the influences for track and influential factors. Recently, the HEMU 430-X, which was developed by Next Generation High-Speed Rail Development R&D Project, achieved 421.4km/h in a test run of Daegu.Busan section of the Gyeongbu high speed rail on March in 2013. In the case of additional speed-up test on Test-Bed Section(Gongju.Jeongeup: KP 100~128km Osong starting point), the analysis of track forces is required for outer rail by the increase of dynamic force and centrifugal force of vehicle. In this paper, the vehicle speed variation on HSL line is evaluated by TPS analysis considering the tractive effort of HEMU 430-X, tested running resistance and alignment of Honam HSR. And the track forces are evaluated by centrifugal force and impact factor on curved track.

Evaluation on the Applicability of the Conventional Roadbed Stiffness for High Speed Concrete Track (일반철도 노반 강성조건에서의 고속철도용 콘크리트 궤도의 적용성 검토)

  • Lee, Jin Wook;Lee, Seong Hyeok;SaGong, Myung;Lyu, Tae Jin
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.1
    • /
    • pp.40-46
    • /
    • 2013
  • Based on Korean railway design standards, the thicknesses of the reinforced roadbeds of conventional and high speed railways are different, and so too, for the size distribution of the ballast particles. Accordingly, considerable cost would be required to increase operating speeds of conventional lines, in particular related to changing from a ballasted track system to a ballastless one. In this study, applicability of a roadbed which supports conventional ballasted track, for use as a ballastless track for a high speed rail line was examined. A reinforced roadbed for a conventional railway is 20cm thick, and the type of material used for a conventional reinforced roadbed is M-40 (crushed gravel for road embankments). A dynamics test was conducted to evaluate the occurrence of the permanent settlement of the track substructure. These results suggest that, without changes to the track substructure, an operational speed of 400km/h is feasible with a ballastless track. This result; however, is from laboratory experiments. Further studies, such as numerical analyses or field validation, are required.

Evaluation of Extremely Low Frequency Magnetic Fields emission Level from High Voltage Transmission Lines (고압 송전선로에서 극저주파 자기장 영향평가 적용에 관한 연구)

  • Jung, Joon Sig;Choi, Sung Ho;Jeon, Hyung Jin;Kim, Yoon Shin;Hong, Seung Cheol
    • Journal of Environmental Impact Assessment
    • /
    • v.23 no.5
    • /
    • pp.353-363
    • /
    • 2014
  • The purpose of this study was to investigated the ELF-MF emission level of various environments such as 258 facilities near located to high voltage transmission lines and 120 high voltage transmission lines, 17 underground cable lines. In addition, ELF-MF reduction rate according to separation distance was calculated by using simulations. An appropriate separation distance showing below 4mG was at least 70m. In the case of the appropriate separation distance for 120 high voltage transmission lines, 154kV required 20m of separation distance and 345kV required 60m of separation distance. The simulation results showed that the appropriate separation distance showing below 4mG was 40m and 60m for overhead 154kV and 345kV respectively. To adjust the worst conditions considering the aspects of environmental impact assessment study and the electric power currents that will increase in the future, the appropriate minimum separation distance for HVTL is judged to be above 70m in this study. Thus, there is a need to establish the greenbelt or buffer zone within 70m so as to create an environment in which the receptors are not exposed and thereby eliminate the risk factors of ELF-MF against humans.

Study for Progress Rate of Standard Deviation of Irregularity Based on Track Properties for the Railway Track Maintenance Cycle Analysis (궤도 유지보수 주기 예측을 위한 구간 특성에 따른 궤도틀림 표준편차 진전정도 분석)

  • Jeong, Min Chul;Kim, Jung Hoon;Lee, Jee Ha;Kang, Yun Suk;Kong, Jung Sik
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.3
    • /
    • pp.31-40
    • /
    • 2012
  • The irregularity of railway track affects not only the comfort of ride such as noise or vibration but also the safety of train operation. For this reason, it is an interesting research area to design a reliable and sustainable railway track system and to analyze the train movement mechanism based on systematic approaches considering reasons of track irregularity possible in a specific local environment. Irregularity data inspected by EM-120, an railway inspection system in Korea includes unavoidable incomplete and erratic information, so it is encountered lots of problem to analyse those data without appropriate pre-data-refining processes. In this research, for the efficient management and maintenance of railway system, progress rate of standard deviation of irregularity is quantified. During the computation, some important components of railways such as rail joint, ballast, roadbed, and fastener have been considered. Probabilistic distributions of irregularity growth with respect to time are computed to predict the remaining service life of railway track and to be adapted for the safety assessment.

A study on the Effect of Electricity Environment Interference for Very High Voltage 345kV T/L (초고압 345kV T/L으로 인한 전기 환경 장해 영향에 대한 연구)

  • Yim, Hwang-bin;Ko, Nam-gyu
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.1 no.3
    • /
    • pp.9-16
    • /
    • 2008
  • We centrally study effect of very high voltage 345kV T/L which is set up at residential area (Yangyang~Donghae in Gangwon-do) to broadcasting radio wave and human body. First, to compare predicted result of radio wave disturbance, we set 7 area 13 point and divide broadcasting quality, electric and magnetic fields in T/L process. Result of estimation, we confirm that when receiving broadcasting radio wave, broadcasting quality's difference is generated by topographic property of near receiving point. also through result of electric fields and broadcasting quality and their comparison, we judge that high voltage T/L is barely affect receive of broadcasting radio wave. To judge effect of magnetic fields to human body, we analyze magnetic fields in variable area and condition. as a result, magnetic fields of every area has 1.8mG(WHO international standard amount is 833mG). So It is proved that magnetic fields of 345kV Yangyang~Donghae area has slight, tiny effect to human body.

  • PDF

A Study on Operation Method of Protection Device for LVDC Distribution Feeder in Light Rail System (경전철용 LVDC 배전계통의 보호기기 운용 방안에 관한 연구)

  • Kang, Min-Kwan;Choi, Sung Sik;Lee, Hu-Dong;Kim, Gi-Yung;Rho, Dae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.4
    • /
    • pp.25-34
    • /
    • 2019
  • Recently, when a fault occurs at a long-distance point in a LVDC (low voltage direct current) distribution feeder in a light rail system, the magnitude of the current can decrease to less than that of the load current of a light rail system. Therefore, proper protection coordination method to distinguish a fault current from a load current is required. To overcome these problems, this paper proposes an optimal algorithm of protection devices for a LVDC distribution feeder in a light rail system. In other words, based on the characteristics of the fault current for ground resistance and fault location, this paper proposes an optimal operation algorithm of a selective relay to properly identify the fault current compared to the load current in a light rail system. In addition, this paper modelled the distribution system including AC/DC converter using a PSCAD/EMTDC S/W and from the simulation results for a real light rail system, the proposed algorithm was found to be a useful and practical tool to correctly identify the fault current and load current.

Analysis on the Rainfall Driven Slope Failure Adjacent to a Railway : Flume Tests (강우로 인한 철도 연변사면의 활동분석 : 실내모형실험)

  • SaGong Myung;Kim Min-Seok;Kim Soo-Sam;Lee In-Yong
    • Journal of the Korean Geotechnical Society
    • /
    • v.22 no.5
    • /
    • pp.83-91
    • /
    • 2006
  • Recently, the intensive rainstorm possibly induced by global warming plays a key role on the instability of railway adjacent slopes. The instability of slopes results as covering and loss of railway lines induced by slided soil mass. According to the site investigation on the failed slopes triggered by rainfall, low types of slope failure were observed: shallow, intermediate, gully erosion, and soil-rock interface failures. The observation reveals the different characteristics of slope failure depending on the thickness of soil layer, morphological features of slope, etc. Based upon the observations, flume tests were conducted to analyze the sliding mechanism of each failure. The variables of flume test are soil layer thickness, rainfall intensity, and morphology of slope under the constant condition of the percentage of fine, initial soil moisture content, slope angle and compaction energy. Test results show that shallow failure was mostly observed from the surface of the slope and caused by the soil erosion; in addition, compared to the other types of failure, the occurrence of initial erosion is late, however, the development of erosion is fast. In gully erosion failure, the collected water from the water catchment area helps erosion of the upper soil layer and transfer of residual corestone, which impedes the erosion process once the upper soil layers are eroded and corestone are exposed. The soil-rock interface failure shows the most fast initial erosion process among the failure types. Interestingly, the common feature observed from the different types of failure was the occurrence of the initial deformation near the toe of slopes which implies the existence of surbsurface flow along the downslope direction.