Fast Contingency Ranking Algorithm of Power Equipment (전력설비의 신속한 상정사고 선택 앨고리즘)

  • 박규홍;정재길
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.12 no.1
    • /
    • pp.20-25
    • /
    • 1998
  • This paper presents an algorithm for contingency ranking using line outage distribution factors(LODF) which are established by generation shift distribution factors(GSDF) from DC load flow solutions. By using the LODF, the line flow can be calculated according to the modification of base load flow if the contingency occur. To obtain faster contingency ranking, only the loading line more than 35[%](60[%] at 154[kV]) is included in the computation of Performance Index(PI). The proposed algorithm has been validated in tests on a 6-bus test system.system.

  • PDF

The circuit design to be power transmission or power distribution using the dual characteristic impedance transmission line (이중 특성 임피던스 전송 선로를 이용한 전력 전송 또는 전력 분배가 가능한 회로 설계)

  • Park, Unghee
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.10
    • /
    • pp.2339-2344
    • /
    • 2014
  • of a microstrip transmission line, this transmission line can operate as the microstrip line or the coplanar line according to open or short connection between the ungrounded copper plane and grounded plane on the base plane. Two different type operation of the transmission line means that one transmission line can have two different characteristic impedances. This paper proposes and fabricates the circuit to be operated 2-ports power transmission line or 2-way power divider with the stable input matching characteristic by using this dual-impedance transmission line. The proposed circuit operates 2-ports power transmission line in case of the coplanar line or 2-way power divider line in case of the microstrip line. The fabricated circuit shows $S_{21}$ > -0.2 dB and $S_{11}$ < -15 dB above 700 MHz when the circuit operates 2-ports power transmission line. And, it is $S_{21}$ > -3.8 dB, $S_{11}$ < -10 dB and $S_{21}/S_{31}$ < ${\pm}0.3dB$ above 700 MHz when the circuit operates 2-way power divider.

An Overload Alleviation Algorithm by Line Switching (선로절환에 의한 과부화 해소 앨고리즘)

  • 박규홍;정재길
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.41 no.5
    • /
    • pp.459-467
    • /
    • 1992
  • This paper presents a new algorithm for the countermeasure to alleviate the line overloads due to contingency without shedding loads in a power system. This method for relieving the line overloads by line switching is based on obtaining the kine outage distribution factors-the linear sensitivity factors, which give the amount of change in the power flow of each line due to the removal of a line in a power system. There factors are made up of the elements of sparse bus reactance matrix and brach reactances. In this paper a fast algorithm and program is presented for obtaining only the required bus reactance elements which corresponds to a non-zero elements of bus admittance matrix, and elements of columns which correspond to two terminal buses of the overloaded(monitored) line. The proposed algorithm has been validated in tests on a 6-bus and the 30-bus test system.

  • PDF