• Title/Summary/Keyword: 산사태위험지도

Search Result 49, Processing Time 0.036 seconds

Development of a Web-based System for Raster Data Analysis Using Map Algebra (연구는 래스터 데이터의 지도대수 분석을 위한 GRASS 기반의 웹 시스템 개발)

  • Lee, In-Ji;Lee, Yang-Won;Suh, Yong-Cheol
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.18 no.4
    • /
    • pp.131-139
    • /
    • 2010
  • Recent spread of GIS and the increasing demand of spatial data have brought about the development of web GIS. In addition to sharing and mapping spatial data, web GIS is also required to provide spatial analytic functions on the web. The FOSS(free and open source software) can play an important role in developing such a system for web GIS. In this paper, we proposed a web-based system for raster data analysis using map algebra. We employed GRASS as an open source software and implemented the GRASS functionalities on the web using java methods for invocation of server-side commands. Map algebra and AHP were combined for the raster data analysis in our system. For a feasibility test, the landslide susceptibility in South Korea was calculated using rainfall, elevation, slope angle, slope aspect, and soil layers. It is anticipated that our system will be extensible to other web GIS for raster data analysis with GRASS.

Susceptibility Analysis for Rock Slope Hazard Using the Empirical Method (경험론적 방법을 이용한 암반사면재해 취약성 분석)

  • Kim, Jae Min;Choi, Jung Chan
    • The Journal of Engineering Geology
    • /
    • v.24 no.4
    • /
    • pp.473-486
    • /
    • 2014
  • The objective of this study is to produce the rock slope hazard map on the Mt. Hwangryeong located at center of Busan Metropolitan City for evaluating the rock slope hazard susceptibility. The Mt. Hwangryoeng is located between Dongrae and Ilkwang faults and consists of various rocks such as sedimentary rock, andesitic volcanic rock, andesite, gabbro and granitic rocks. Thematic maps were carried out using ArcGIS for Database including the orientations and density of joints, strength of rock constructed through the field survey and results from previous studies. Also, rock slope hazard susceptibility for the Mt. Hwangryoeng area was studied using empirical method through checklists proposed by NDMI (National Disaster Management Institute). Results from using the empirical method indicated that rock slopes are evaluated from very stable to stable, but moderate stability has been partially presented along the edge of the mountain area.

Environmental Interpretation on soil mass movement spot and disaster dangerous site for precautionary measures -in Peong Chang Area- (산사태발생지(山沙汰發生地)와 피해위험지(被害危險地)의 환경학적(環境學的) 해석(解析)과 예방대책(豫防對策) -평창지구(平昌地區)를 중심(中心)으로-)

  • Ma, Sang Kyu
    • Journal of Korean Society of Forest Science
    • /
    • v.45 no.1
    • /
    • pp.11-25
    • /
    • 1979
  • There was much mass movement at many different mountain side of Peong Chang area in Kwangwon province by the influence of heavy rainfall through August/4 5, 1979. This study have done with the fact observed through the field survey and the information of the former researchers. The results are as follows; 1. Heavy rainfall area with more than 200mm per day and more than 60mm per hour as maximum rainfall during past 6 years, are distributed in the western side of the connecting line through Hoeng Seong, Weonju, Yeongdong, Muju, Namweon and Suncheon, and of the southern sea side of KeongsangNam-do. The heavy rain fan reason in the above area seems to be influenced by the mouktam range and moving direction of depression. 2. Peak point of heavy rainfall distribution always happen during the night time and seems to cause directly mass movement and serious damage. 3. Soil mass movement in Peongchang break out from the course sandy loam soil of granite group and the clay soil of lime stone and shale. Earth have moved along the surface of both bedrock or also the hardpan in case of the lime stone area. 4. Infiltration seems to be rapid on the both bedrock soil, the former is by the soil texture and the latter is by the crumb structure, high humus content and dense root system in surface soil. 5. Topographic pattern of mass movement spot is mostly the concave slope at the valley head or at the upper part of middle slope which run-off can easily come together from the surrounding slope. Soil profile of mass movement spot has wet soil in the lime stone area and loose or deep soil in the granite area. 6. Dominant slope degree of the soil mass movement site has steep slope, mostly, more than 25 degree and slope position that start mass movement is mostly in the range of the middle slope line to ridge line. 7. Vegetation status of soil mass movement area are mostly fire field agriculture area, it's abandoned grass land, young plantation made on the fire field poor forest of the erosion control site and non forest land composed mainly grass and shrubs. Very rare earth sliding can be found in the big tree stands but mostly from the thin soil site on the un-weatherd bed rock. 8. Dangerous condition of soil mass movement and land sliding seems to be estimated by the several environmental factors, namely, vegetation cover, slope degree, slope shape and position, bed rock and soil profile characteristics etc. 9. House break down are mostly happen on the following site, namely, colluvial cone and fan, talus, foot area of concave slope and small terrace or colluvial soil between valley and at the small river side Dangerous house from mass movement could be interpreted by the aerial photo with reference of the surrounding site condition of house and village in the mountain area 10. As a counter plan for the prevention of mass movement damage the technics of it's risk diagnosis and the field survey should be done, and the mass movement control of prevention should be started with the goverment support as soon as possible. The precautionary measures of house and village protection from mass movement damage should be made and executed and considered the protecting forest making around the house and village. 11. Dangerous or safety of house and village from mass movement and flood damage will be indentified and informed to the village people of mountain area through the forest extension work. 12. Clear cutting activity on the steep granite site, fire field making on the steep slope, house or village construction on the dangerous site and fuel collection in the eroded forest or the steep forest land should be surely prohibited When making the management plan the mass movement, soil erosion and flood problem will be concidered and also included the prevention method of disaster.

  • PDF

Development of Integrated Management System for Steep Slope Prevention and Management (급경사지 방재 및 관리를 위한 급경사지정보 통합관리시스템 개발)

  • Lee, Kyungchul;Jang, Yonggu;Song, Jihye;Kang, Injoon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.9
    • /
    • pp.77-85
    • /
    • 2014
  • Recently, the National Emergency Management Agency of Korea has been operating the National Disaster Management System. Nevertheless, there are numerous difficulties in systematic controlling the steep slope DB promptly, because the system's functions in input and control for steep slope information are merely simple. Futhermore, the hazard degrees of steep slope lands nowadays have risen suddenly in accordance with the increase rate of large scale landslides such as the landslide cases of Umyeonmountain, Chuncheon province and others or sever rain storm cases. these lead to rapid increases in frequencies of nature disasters nationally. therefore, it is needed to develop the GIS-based integrated management system for steep slope information in order to manage disasters in advance or high-degree control. This study shows the national GIS-based integrated management system to prevent the disasters that caused by steep slope lands. The integrated management system developed in this study consists of surface information input modules, realtime DB liaison modules of integrated underground information, V-world background map-based GIS, integrated management system for steep slope information user modules, realtime liaison interface modules designed for utilizing steep slope information. Also, tests about stability of data storage, system stability and consistency of processing speed were performed.

GIS-based Debris Flow Risk Assessment (GIS 기반 토석류 위험도 평가)

  • Lee, Hanna;Kim, Gihong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.139-147
    • /
    • 2023
  • As heavy precipitation rates have increased due to climate change, the risk of landslides has also become greater. Studies in the field of disaster risk assessment predominantly focus on evaluating intrinsic importance represented by the use or role of facilities. This work, however, focused on evaluating risks according to the external conditions of facilities, which were presented via debris flow simulation. A random walk model (RWM) was partially improved and used for the debris flow simulation. The existing RWM algorithm contained the problem of the simulation results being overly concentrated on the maximum slope line. To improve the model, the center cell height was adjusted and the inertia application method was modified. Facility information was collected from a digital topographic map layer. The risk level of each object was evaluated by combining the simulation result and the digital topographic map layer. A risk assessment technique suitable for the polygon and polyline layers was applied, respectively. Finally, by combining the evaluated risk with the attribute table of the layer, a system was prepared that could create a list of objects expected to be damaged, derive various statistics, and express the risk of each facility on a map. In short, we used an easy-to-understand simulation algorithm and proposed a technique to express detailed risk information on a map. This work will aid in the user-friendly development of a debris flow risk assessment system.

Standards of private sector for debris flow hydraulic model experiment (토석류 수리모형실험 단체표준 제정 현황)

  • Eun Cheul Jang;Byeong Wook Lee;Dongwoo Ko;Jae-Seon Yoon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.7-7
    • /
    • 2023
  • 국내뿐만 아니라 세계적으로도 산사태 발생에 따른 토석류 피해가 빈번하게 발생하고 있으나 아직 토석류 거동에 대한 물리적인 특성을 규명하고, 실험 등을 통한 면밀한 검토가 안 되었다. 토석류는 집중호우 시 토사 내 함수량의 증가로 인해 또는 지진, 화산 발생 시 지각 변동으로 인해 사면의 저항력이 약화되어 발생한다. 이러한 토석류는 재해를 일으키는 매우 위험한 자연 현상이며, 그 규모에 따라 하류부에 큰 피해를 발생시킬 수 있다. 국내에서 수행된 토석류 관련 연구들은 해외에서 주로 수행된 기초연구 결과를 이용한 토석류 피해 발생예측, 위험지도 작성, 토석류 방지 구조물 개발 등의 응용연구가 대부분이며 소규모 모형을 제작하여 수리실험이 진행되었다. 김기환 외(2008)은 토석류 확산형태와 흐름 속도에 대한 모형실험을 수행하였으며, 김영일과 백중철(2011)은 토석류 유동과 퇴적 특성에 대한 실험을 수행하였다. 미국의 경우 미지질조사국(USGS, U.S Geological Survey)에서 1994년부터 지금까지 100 m 길이의 대형 경사수로를 이용하여 토석류 수리모형실험을 수행하고 있으며 이를 통해 토석류의 수위, 충격력, 전파속도, 유출 후 퇴적형상 등에 대한 다양한 실험데이터를 제시하고 있다. 그러나, 현재까지 국내외 토석류 실험에 대한 표준실험방법과 기준이 정립되지 않아 실험결과의 신뢰성을 명확히 증명하기 어려운 실정이다. 토석류로 인한 가장 직접적인 피해 인자인 토석류의 충격력과 전파속도를 수리모형실험을 통해 정량적으로 파악하기 위한 시험 표준으로 시험 절차, 시험 방법 및 적정한 측정장비의 사양 등을 단체표준을 통해 제공함으로써 시험의 불확실성을 최소화하고, 명확한 프로세스에 따른 시험 결과의 신뢰성과 일관성을 확보하고자 한다. 국토교통연구인프라운영원에서는 단체표준 개발을 위한 시험기관협의체를 구성하고, 이해관계인들의 의견을 반영한 토석류 충격력과 전파속도 측정방법(안)을 2022년에 7월 작성하였으며, 현재 이해관계자들의 의견을 수렴하고 중소기업중앙회에 심의를 상정한 상태이다.

  • PDF

Analysis of Abroad Mid- to Long-Term R&D Themes and Market Information in the Geological Information and Mineral Resources Fields (지질정보 및 광물자원 분야 국외 중장기 연구개발 주제 및 시장정보 분석)

  • Ahn, Eun-Young
    • Economic and Environmental Geology
    • /
    • v.52 no.6
    • /
    • pp.637-645
    • /
    • 2019
  • Due to the transformation to the intelligent information society, the rapid change of our life and environment is expected. The Ministry of Science and ICT (MSIT) and the National Research Council of Science and Technology (NST) introduced a five-year government supported research institution's planning and evaluation based on the mid-to long-term perspective. This study collects international benchmarking information including industry, academia, and research fields by collecting mid- and long-term strategy reports from public research institutes, surveys by experts from abroad universities and research institutes, and analyzing overseas market information reports. The British Geological Survey (BGS), the U.S. Geological Survey (USGS) and the japanese geological survey related institutes (AIST-GSJ) plans for three-dimensional national geological information, predictions of geological environmental disasters, and development of important metals and material in the low carbon economic transformation and in the era of the Fourth Industrial Revolution. The mid- and long-term program emphasizes basic and public research on geological information through abroad experts survey such as the IPGP-CNRS etc. The market analysis of the mining automation and digital map sectors has been able to derive the fields in which the role of public research institutes by the market is expected such as data collection on land and in the air, mobile or three-dimensional information production, smooth/fast/real-time maps, custom map design, mapping support to various platforms, geological environmental risk assessment and disaster management information and maps.

Studies on Development of Prediction Model of Landslide Hazard and Its Utilization (산지사면(山地斜面)의 붕괴위험도(崩壞危險度) 예측(豫測)모델의 개발(開發) 및 실용화(實用化) 방안(方案))

  • Ma, Ho-Seop
    • Journal of Korean Society of Forest Science
    • /
    • v.83 no.2
    • /
    • pp.175-190
    • /
    • 1994
  • In order to get fundamental information for prediction of landslide hazard, both forest and site factors affecting slope stability were investigated in many areas of active landslides. Twelve descriptors were identified and quantified to develop the prediction model by multivariate statistical analysis. The main results obtained could be summarized as follows : The main factors influencing a large scale of landslide were shown in order of precipitation, age group of forest trees, altitude, soil texture, slope gradient, position of slope, vegetation, stream order, vertical slope, bed rock, soil depth and aspect. According to partial correlation coefficient, it was shown in order of age group of forest trees, precipitation, soil texture, bed rock, slope gradient, position of slope, altitude, vertical slope, stream order, vegetation, soil depth and aspect. The main factors influencing a landslide occurrence were shown in order of age group of forest trees, altitude, soil texture, slope gradient, precipitation, vertical slope, stream order, bed rock and soil depth. Two prediction models were developed by magnitude and frequency of landslide. Particularly, a prediction method by magnitude of landslide was changed the score for the convenience of use. If the total store of the various factors mark over 9.1636, it is evaluated as a very dangerous area. The mean score of landslide and non-landslide group was 0.1977 and -0.1977, and variance was 0.1100 and 0.1250, respectively. The boundary value between the two groups related to slope stability was -0.02, and its predicted rate of discrimination was 73%. In the score range of the degree of landslide hazard based on the boundary value of discrimination, class A was 0.3132 over, class B was 0.3132 to -0.1050, class C was -0.1050 to -0.4196, class D was -0.4195 below. The rank of landslide hazard could be divided into classes A, B, C and D by the boundary value. In the number of slope, class A was 68, class B was 115, class C was 65, and class D was 52. The rate of landslide occurrence in class A and class B was shown at the hige prediction of 83%. Therefore, dangerous areas selected by the prediction method of landslide could be mapped for land-use planning and criterion of disaster district. And also, it could be applied to an administration index for disaster prevention.

  • PDF

Slope Stability by Variation of Rainfall Characteristic for Long Period (장기간 강우특성 변화에 따른 국내 사면의 안정성)

  • Lee, Jeong-Ju;Kim, Jae-Hong;Hwang, Young-Cheol
    • Journal of the Korean Geotechnical Society
    • /
    • v.30 no.6
    • /
    • pp.51-59
    • /
    • 2014
  • Shallow landslides and debris flows are a common form of soil slope instability in South Korea. These events may be generally initiated as a result of intense rainfall or lengthening rainfall duration because of the effects of climate change. This paper presents the evaluation of rainfall-induced natural soil slope stability and reinforced soil slope instability under vertical load (railway or highway load) throughout South Korea based on quantitative analysis obtained from 58 sites rainfall observatories for 38 years. The slope stability was performed for infinite and geogrid-reinforced soil slopes by taking an average of maximum rainfall every ten years from 1973 to 2010. Seepage analysis is carried out on unsaturated soil slope using the maximum rainfall at each site, and then the factor of safety was calculated by coupled analysis using saturated and unsaturated strength parameters. The contour map of South Korea shows four stages in 10-year-time for the degree of landslide hazard. The safety factor map based on long term observational data will help prevent rainfall-induced soil slope instability for appropriate design of geotechnical structures regarding disaster protection.