• Title/Summary/Keyword: 사업 타당성 평가

Search Result 390, Processing Time 0.037 seconds

A Study on Model Establishment of the Validity Evaluation for BTL Project Expenses Using an Analytic Hierarchy Process (계층분석법(AHP)을 이용한 BTL사업비 타당성 평가모형정립에 관한 연구)

  • Lee, Chun-Kyong;Jung, Young-Han;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.905-908
    • /
    • 2008
  • The BTL project, 4 years since its operation, has benchmarked the PFI Project in Japan and has been introduced. Given the evaluation step to select a preferred bidder, in a technological factor, the basic plans are corrected and complemented, whereas in a price factor, the low price bidding system is being enforced. There is concern that how to select preferred bidders and how to operate project costs during operation and management period may be problematic. Thus, in this study, using the Analytic Hierarchy Process, the method of deciding the pribrity to select preferred bidders in an early stage of the project and the evaluation model to evaluate the validity of BTL project expenses in process of project enforcement are established. Targeting the group. composed of experts who have experiences in the BTL project. Then, the levelling of evaluation factors and grouping have been carried out as following: LCC analysis and disbursement for government including two more detailed factors.

  • PDF

Feasibility Evaluation of Public IT Projects based on EA (EA기반의 공공 정보화사업 타당성 검토)

  • Yuk, Yun-Bok;Sin, Dong-Ik
    • 한국경영정보학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.725-730
    • /
    • 2007
  • 본 논문은 공공부문에서 정보화사업의 타당성 검토 방법론을 비교분석하고 문제점을 도출하여 문제점 극복방안을 제시한다. 기존의 방법론이 재무적 성과에 중점을 두고 있는 반면에 가치 중심의 평가를 제안하고 특히 EA 기반의 타당성 검토방법이 더욱 합리적이고 포괄적인 방법임을 제시한다.

  • PDF

기술의 경제적 기여도 분석 및 이를 통한 기술의 사업화 타당성 평가

  • 고병열
    • Proceedings of the Korea Technology Innovation Society Conference
    • /
    • 2004.05a
    • /
    • pp.270-284
    • /
    • 2004
  • 본 연구에서는 기업의 기술 사업화 타당성 평가 시, 기술성, 시장성 및 경제성 평가가 독립적으로 진행되는 것을 제고하고, 평가과정 중에서 자연스럽게 기술성과 사업성을 결합하여 인식할 수 있는 방법론적 틀을 제시하고자 하였다. 여기서는 크게 LSLP 개념을 도입한 기술기여율 분석과, 기술적 난이도 및 부가가치 창출율의 기하평균으로 구성된 기술의 제품기여도 분석으로 이를 파악하고자 하였으며, 이를 통해 도출된 결과들은 기술의 경제적 가치의 상대적 파악, 표적시장 및 기업의 기술 포트폴리오 구축에 활용되었다.

  • PDF

A Study on Evaluation Indicators for u-City Business Model Feasibility (u-City Business Model 사업타당성 평가지표에 관한 연구)

  • Kim, Tak-Yeol;Park, Hee-Jun;Kim, Il-Kyum
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2009.05a
    • /
    • pp.3-7
    • /
    • 2009
  • 최근 우리 사회는 유비쿼터스 컴퓨팅 기술의 발전과 지자체별 u-City 건설 붐에 힘입어 도시민의 삶의 질 개선과, 도시관리 기능의 효율화를 위한 차세대 서비스 사업이 활발히 전개되고 있다. 반면 유비쿼터스 사회에서의 기술 수명주기의 단축과 시장의 급변은 사업 전개에 있어 커다란 부담으로 작용하고 있어 사업 계획 단계에서부터 사업의 타당성에 대한 충분한 고려가 필요하다. 본 논문은 과거의 전통적인 Business로부터 u-Business로의 진화과정을 살펴보고 기술의 발전과 가치의 변화에 따른 u-Business의 성공요인과 u-City 사업의 특징 분석을 바탕으로 u-City 사업 계획 단계에서 적용 가능한 u-City Business Model의 사업타당성 평가지표를 도출하고자 한다.

  • PDF

Development of Feasibility Analysis Model for Developer-requested Housing Projects (공동주택 개발사업 수주를 위한 사업타당성 분석모델 개발)

  • Kim, Ki-Shin;Lee, Joong-Seok;Huh, Young-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.241-246
    • /
    • 2008
  • With construction industry recession, many construction companies are increasingly conducting the development projects by themselves. However, housing projects requested by developers still stand large portion. Although many studies on feasibility analysis were released, they mainly focused on economic feasibility and lacked research on factors and criterions of overall project. Also, because previous studies overly break downed factors related to project, they rarely used in practice. Therefore, this study developed the feasibility analysis model of housing development projects to help main contractors to easily and effectively decide if it is feasible enough to promote the projects requested by developers, and verified the reliability of the model. In this study, thirty one driving factors were identified under seven different categories and the criterion of each factor was also developed. The survey on important index of each factor found "salability", "economic feasibility", "site location" and "method of raising fund" significant. 3 projects were tested by the model and its results showed resonable reliability.

  • PDF

A Study for the validity analytic Model of U-City Management Center (UMC의 타당성 평가 모델에 대한 연구)

  • Kim, Byung-Sun;Suh, Chang-Jin
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2010.11a
    • /
    • pp.1462-1464
    • /
    • 2010
  • U-City는 도시에 IT를 접목하여 도시의 운영과 관리를 효율화하고 다양한 서비스의 도입을 통해 주민들의 복지 향상을 목적으로 하는 신개념의 도시이다. UMC(U-City Management Center)는 U-City의 핵심요소로 U-City의 각종 서비스의 관리 운영을 통제하고, 새로운 부가가치를 생성하는 역할을 한다. 하지만 정보화 사업을 타당성 분석없이 진행하는 경우 전반적인 재정의 운영이라는 정책적인 측면에서 문제가 발생할 소지가 크다. 따라서 UMC 타당성 분석이 선행되어야 한다. 본 논문에서는 정보화사업의 타당성 분석을 위한 선행연구들을 분석하고, UMC의 타당성 분석을 위하여 AHP 모델을 적용하였다. 또한 도출된 모델을 이용하여 구축중인 UMC의 타당성을 분석하였으며, 분석 결과 기술적 타당성, 경제적 타당성, 정책적 타당성 중 기술적 타당성이 가장 낮은 것으로 평가되어 향후 기술적 문제를 보완해야함을 도출하였다.

Influence Factor Analysis for Feasibility Study of Building Projects (상업건축물의 사업타당성 영향요인 분석)

  • Son, Ki-Young;Kook, Dong-Hoon;Kim, Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.462-466
    • /
    • 2006
  • The startingpoint of successful buildingproduction process is the feasibility study of the project. If the feasibility study is poor which is affected in direct production processes such as designing and engineering, it incurs a great unrecoverable loss to the company. The governmentinstitutionalized the feasibility study for projects that budgets over 50billion won in an effort to ensure competitiveness of the construction industry after IMF; however, the system and effort to created systematic studies or guidance preparation for private construction development projects are lacking in great deal. Therefore, the objective of this study is to establish the analysis factors of feasibility study and evaluation standard by systematic analysis in consideration of the changes of various variables and mutual relationships using system dynamics technique for office buildings among commercial buildings.

  • PDF

Study on Assessment Indicators for the Development of Agricultural Technology Development (신기술개발을 위한 사전평가지표 개발)

  • Ku, Kyo Young;Kwak, Cheul Soon;Hwang, Dae Yong
    • Journal of Agricultural Extension & Community Development
    • /
    • v.19 no.4
    • /
    • pp.1095-1136
    • /
    • 2012
  • The study demonstrated the pre-feasibility evaluation of the new agricultual technology R&D project and the ways to improve it. The study created new criteria for pre-feasibility evaluation based on the results acquired from the examination and analysis of pre-feasibility evaluation systems and criteria of various institutions at home and abroad in order to understand the current state of the evaluation method conducted by the Rural Development Administration and to seek ways for its improvement. The new criteria include indices for technicity, marketability, and feasibility. Based on these, questionnaires were prepared and the answers on them were statistically analyzed to set weights between indices. It was found that feasibility appeared the highest, in particular, feasibilities related to budget appropriateness, novelty, possibility of demand for the technology, and potential of commercialization appeared high. Referring to this conclusion, a simple operation process of pre-feasibility evaluation was introduced in the study.

The Development and Application of the Indices of Evaluation for the Cultural Tourism Development Project Using AHP -focusing on Cultural and Ecological Tourism Infrastructure Project in Three Cultural Areas of Andong City- (AHP를 활용한 문화관광개발 사업의 평가지표 개발 및 적용 -안동시 3대 문화권 문화·생태 관광 기반조성 사업을 중심으로-)

  • Kwon, Gi-Chang
    • The Journal of the Korea Contents Association
    • /
    • v.16 no.4
    • /
    • pp.399-407
    • /
    • 2016
  • This study is about setting the weighed value of evaluation items for cultural tourism development project using AHP and it analyzed the cultural and ecological tourism infrastructure project in three cultural areas of Andong City. As a result of examining the reliability of evaluation items, it turned out to be 0.9, an appropriate level. In the analysis of weighed value, the items valued highly were in the order of validity of the plan, economic validity, validity of the policy. As for the detailed indices for the three that showed the highest weighed value, for validity of the plan, distinction of contents; for validity of the policy, compatibility of regional characteristics; for economic validity, sustainability were given high values. In the end, it could be concluded that as the cultural and ecological tourism infrastructure project in three cultural areas was delayed a lot more than previously planned, in order to flexibly respond to changing environment, it would be desirable to change parts of the previous plan before pushing ahead with it.

A Study on Improvement of Feasibility Evaluation for Public Projects (공공사업 타당성 평가의 개선 방안에 관한 연구)

  • Park, Seung-Jun
    • Journal of the Korea Convergence Society
    • /
    • v.8 no.2
    • /
    • pp.163-168
    • /
    • 2017
  • The feasibility evaluation of public projects has been carried out mainly in the economic analysis. However, items of political, technological and balanced regional development aspects are further evaluated by applying analytic hierarchy process, This paper suggests to analyzes preliminary feasibility study of construction and research & development project during the past three years and to verify correlation between B/C ratio and AHP weight. The result shows that the correlation between cost benefit ratio and the weight of the hierarchy is 0.744 in construction projects and 0.899 in research & development project. Namely, AHP weight be under the control of B/C ratio and is devoted to its role against expectation. Therefore it must be sufficiently discussed in various designs of studies to maximize the effects of AHP analysis.