• Title/Summary/Keyword: 사업참여주체의 업무와 역할

Search Result 12, Processing Time 0.02 seconds

The Establishment of the Task and Role of the Participants at Building Remodeling Phases (건축 리모델링 사업단계별 참여주체자의 업무와 역할정립)

  • Jung Duk-Woo;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.331-334
    • /
    • 2002
  • This study proposes a scheme for successful remodeling projects by establishing the task and role of project participants. In doing so, the study investigates the natures and problems of the current remodeling practices through interview and questionnaire survey with experts. This study establishes the critical phase of remodeling process and defines the task and role of project participants at each phase. The related documents of being generated at each phase also match up the task and role. It is expected that this scheme can be applied to deal with conflicts, cost overruns, and delays of time.

  • PDF

A Study on the Risk Reduction of Real Estate Development Projects and Improvement Schemes of Main Participant's Role - A Case Study Focused on Housing Development Projects - (부동산 개발사업의 리스크 저감 및 사업 주체간 역할의 개선방안에 관한 연구 - 주택개발사업을 중심으로 한 사례연구 -)

  • Roh Jae-Hyun;Hwang Uk-Sun;Kim Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.135-143
    • /
    • 2005
  • The purpose of this study is to diminish the risk through identifying the risk factors occurring in the process of real estate development projects, and analyzing and coping with the risk factors, and enable stable advance in the development process by improving the roles and work distribution of the project investor. The results of this study are as follows : 1) identifying the risks of contractions from the step of selecting the sites must be made possible through supplemental human resources expertise in plan and construction of the operation 2) as an improvement scheme, heightening the penetration wall of development projects from the investors, proposing a registration law and a selection standard of construction companies to investors' cooperating companies enabling the growth of superior investors.

Measuring of the Performance of a Construction Management Project from Viewpoints of Project Participants -Focusing on Owner, Construction Manager, Designer and Constructor- (건설사업 참여주체(발주자, CMr, 설계자, 시공자) 관점에서 건설사업관리 성과측정에 관한 연구)

  • Ahn, Eun-Jin;Yoo, Byeong-Gi;Lee, Yoon-Sun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.194-205
    • /
    • 2008
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But, the each role of participants is Individually changed to step in construction process stage and moreover it has complicated, entangled interests. The CM(so it called Construction Management as an abbreviation word) system was inducted for the effective management and operation of construction project. The key of the CM success depends on the cooperative relationship relation to major participants. There are lots of studies and efforts for the performance measures of the CM, however existing performance index is only measured as the viewpoint of project owner. Therefore it needs to make up for balanced view through combination of the four-way view of participants. In this study, we should search for cooperative relationship of project participants, and then we should suggest to define the difference of project in their viewpoints.

Constitution of Work Process for Apartment Renovation Project in Design Phase (공동주택 리모델링 설계단계에서의 사업수행 프로세스 구축)

  • Kwon, Won;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.167-175
    • /
    • 2007
  • A renovation project of apartment housing is generally divided into four stages: Project inquiry stage, planning and feasibility stage, design stage and construction stage. Currently, procedure and managerial technique for a remodeling project has not been systematically established so that many companies have difficulty in doing their business. In particular, the design stage in participant which a project managers, designers, residents and engineers is more complicate than the other stages in terms of roles and working procedure. The design documents can be found trial and error if it is not well managed. The insufficient design caused by lack of ability to efficiently utilize information obtained during the stage and inappropriate decision-making not only results in diverse problems in the construction stage but also makes people suspect satisfaction and reliability on the remodeling improvements. Therefore the design stage is very significant issue on the renovation project. As the consequence, the design stage of a remodeling project is so important that it should be carefully managed, and composite understanding of the process to be executed. To do this, we provide roles and responsibility of each participant in the design stage and analyze the process where information is utilized in design stage. The information is analyzed in terms of input, tool and output.

Development of CM Model for BTL Projects in a Public Educational Facilities (공공교육시설 BTL사업의 CM적용모델 개발)

  • Shin, Nam-Kyoung;Woo, Kwang-Min;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.338-341
    • /
    • 2006
  • After the revision of Private Investment Law in January 2005, BTL is introduced to expand the social infrastructures as a major business procedure. Especially, the size of the public educational infrastructure ordered by each city education office is increased by 45% compared to last year, so it is major in BTL Project. However, in the process of practicing BTL Project by now, there are a lot of problems specially in the public educational infrastructure. As a result, this study gives the solutions in the process of BTL Project, the CM models to support the Education Office${\square}{\square}$job and the suggestions for the working scope of the participating construction companies.

  • PDF

Development of Gateway Review System for Supporting Collaborative Decision-Making through Project Life Cycle (사업 단계별 의사결정 지원 게이트웨이 리뷰 체계 구축)

  • Shin, Seung-Woo;Yi, June-Seong;Lee, Jee-Hee;Park, Kyung-Rog;Lim, Ji-Youn
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.43-54
    • /
    • 2010
  • As Urban Regeneration is being carried out, stakeholders are most likely to have disagreements on their interests. Besides, dispersion of numerous communication routes and obscure decision processes aggravate the situation. Eventually, fragmented decision-making processes and complex structure lead to inefficient outcome and delay of projects. This paper is a study on decision-making support not only helps the program manager have more efficient and optimum decision, but also provides alternatives for Urban Regeneration. This study is conducted as follows. Firstly, the project process and the decision-making structure among stakeholders in Urban Regeneration are analyzed, and then the current status of decision-making in Urban Regeneration project is classified. Secondly, with literature study on "Gateway Review", the decision-making gateway review process in Urban Regeneration is defined, and then the "Gateway Review Elements" are listed. Thirdly, to establish gateway review process, this paper presents a check points, namely gate which supports a program manager to monitor and to control the program management in Urban Regeneration. Each gate has several supporting tools such as diagram of critical decision points relation, scheme of stakeholder, checklist. Fourthly, the proposed concept is verified by experts who have been carefully selected to provide their respective reviews. Finally, decision-making support gateway review system is modified based on their critiques and suggestions.

The Evaluation on the Governance of Andong International Mask Dance Festival (안동국제탈춤페스티벌의 거버넌스 특성과 평가)

  • Hwang, Hwa-Seok;Lee, Chul-Woo
    • Journal of the Korean association of regional geographers
    • /
    • v.18 no.2
    • /
    • pp.141-160
    • /
    • 2012
  • This paper evaluates the governance of the Andong International Mask Dance Festival. The evaluation focuses on mutual cross-assessment of agents engaging in governance relating to four elements: social justification, reliability, professionalism and transparency. Governance based on co-operative partnership was the essential factor leading to the mask festival's success. Governance of the Andong International Mask Dance Festival in 2011 was privately initiated governance having horizontal and open partnership among festival specialists, civil society organizations, regional business organizations, volunteers and local government, with the Andong Festival Tourism Foundation as the central figure. Three of governance elements were successfully carried through; the exception was transparency. The agents who gave more positive evaluations were those who played leading roles in planning and conducting events, as well as in assessing those events. The reasons for positively assessing the elements are the significance of the festival and the guarantee of agents' participation in social justification; the ability of agents, as well as cognitional and institutional trust in reliability; expert knowledge, capacity to suggest alternatives and duality of business in professionalism; and effective communication, the guarantee of opening of information and information sharing in transparency. To improve the effectiveness of governance, the system for allowing passive agents to contribute usefully should be strengthened. Mutual communication and sharing of information among agents, as well as between agents and residents, also should be more strongly reinforced.

  • PDF

Problems and Suggestions for Improvement Derived from an Analysis of the Work of the Urban & Residence Environment Improvement Project -Focused on the Establishment of Preparation Committee and Association Committee- (도시 및 주거환경정비사업의 업무분석을 통한 문제점과 개선 사항 -조합설립추진위원회와 조합설립 업무를 중심으로-)

  • Ryu, Han-Guk;Son, Bo-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.3
    • /
    • pp.39-47
    • /
    • 2010
  • The government has routinely made efforts to improve the living environment and infrastructure of less-developed areas through large area urban remodeling projects, which are in themselves attempts to overcome the disadvantages of piecemeal local area development. Such projects are very complex, and various stakeholders are involved. However, the data on such projects has not been well managed, and has not lent itself to being easily adopted to similar projects. In addition, there are numerous fragmented mega-projects that seem to be performed based on "rules of thumb" To address this issue, the work process of many urban and residence project types should be standardized otherwise the participants will be confused to work properly. In particular, typical residents who lack knowledge about building redevelopment, building remodeling, urban environment improvement projects, and the like think that it is difficult to establish the preparation committees and association committees for the projects. Therefore, we examined previous researches related to the urban and building renovation to solve the prescribed present problems. This paper presents the three necessary research performances: first, we analyzed the administrative work process in the related laws; second, we examined the practical work process of the preparation committee and association committee stages; and finally we deduced the problem and presented the required improvements.

A Study on the Roles and Efficient Operations of Urban Regeneration Support Center as Intermediary Organization - Focused on the Chungcheongbuk-do - (중간지원조직으로서 도시재생지원센터의 역할과 운영 방안 - 충청북도 사례를 중심으로 -)

  • Kim, Young-Hwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.2
    • /
    • pp.448-459
    • /
    • 2020
  • Recently, there has been considerable talk about urban regeneration support centers that are currently promoting urban regeneration projects. The reason is that the role and authority are unclear, and the experience of each local government center is not accumulated, resulting in many trial and error and side effects. This study analyzed the current state of operations of urban regeneration support centers in Chungcheongbuk-do to find desirable ways to operate them in the future. The main findings are as follows. First, the role and division between metropolitan and basic centers and field centers of urban regeneration support centers in Chungcheongbuk-do are unclear. Second, the limitations of the center's operation methods, operational autonomy, and independence are not secured. Third, as a participant in urban regeneration, it has relatively low authority and status compared to administration. Fourth, the lack of professional manpower related to urban regeneration and the instability of staff employment were derived as overall problems.

Constitution of Work Process for the Remodeling Construction Project in Planning Phase (건축물 리모델링 기획단계에서의 사업수행 프로세스 구축)

  • Kwon, Won;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.165-174
    • /
    • 2006
  • Recently, the architecture remodeling is rising as new alternative for activating the construction market as the interest toward life cycle of buildings has increased. But the reality is that current remodeling business is suffering various types of difficulties in its performance due to the absence of general management technology and factor technology in systematic performance procedure or evaluation, etc toward remodeling effect, evaluation on performance, imperfect system for reflecting user requirements and remodeling life cycle ; planning, $feasibility ^{\circ}\hat{E}designing^{\circ}\hat{E}construction^{\circ}\hat{E}management$ along with lack of overall understanding on remodeling. Accordingly, this research has attempted to search for an effective management method through overall understanding in project performance by presenting work procedure of remodeling project and analysis items for decision making, etc centered on early planning stage out of three stages called planning, designing and construction.