• Title/Summary/Keyword: 분담금 산정방식

Search Result 4, Processing Time 0.018 seconds

Improved Methods of Cost Sharing in Apartment Remodeling Projects (공동주택 리모델링 사업 분담금 산정의 문제점 및 개선방안)

  • Kim, Jeong-Won;Lee, Dong-Jin;Lee, Min-Joo;Lee, Ji-Hyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.184-185
    • /
    • 2019
  • The purpose of this study is to suggest the improved methods for cost sharing in apartment remodeling projects. Case studies on apartment remodeling projects with different plan type were analyzed and compared. Cost sharing estimated by 'proportional rate method' shows similar results estimated by 'return on investment method' in case of similar area ratio of existing plan to remodeling plan. Otherwise cost sharing estimated by 'proportional rate method' shows great differences comparing the results estimated by 'return on investment method'. Although return on 'proportional rate method' is widely used, it is not proper to estimate cost sharing when each householder's contribution for the project varies, such as considerable differences area ratio of existing plan to remodeling plan. Improved cost sharing method is needed taking into account project contribution and characteristics.

  • PDF

An Empirical Analysis of the Determinants of Defense Cost Sharing between Korea and the U.S. (한미 방위비 분담금 결정요인에 대한 실증분석)

  • Yonggi Min;Sunggyun Shin;Yongjoon Park
    • The Journal of the Convergence on Culture Technology
    • /
    • v.10 no.1
    • /
    • pp.183-192
    • /
    • 2024
  • The purpose of this study is to empirically analyze the determining factors (economy, security, domestic politics, administration, and international politics) that affect the ROK-US defense cost sharing decision. Through this, we will gain a deeper understanding of the defense cost sharing decision process and improve the efficiency of defense cost sharing calculation and execution. The scope of the study is ROK-US defense cost sharing from 1991 to 2021. The data used in the empirical analysis were various secondary data such as Ministry of National Defense, government statistical data, SIPRI, and media reports. As an empirical analysis method, multiple regression analysis using time series was used and the data was analyzed using an autoregressive model. As a result of empirical research through multiple regression analysis, we derived the following results. It was analyzed that the size of Korea's economy, that is, GDP, the previous year's defense cost share, and the number of U.S. troops stationed in Korea had a positive influence on the decision on defense cost sharing. This indicates that Korea's economic growth is a major factor influencing the increase in defense cost sharing, and that the gradual increase in the budget and the negotiation method of the Special Agreement (SMA) for cost sharing of stationing US troops in Korea play an important role. On the other hand, the political tendencies of the ruling party, North Korea's military threats, and China's defense budget were found to have no statistically significant influence on the decision to share defense costs.

Improvement Plan for Calculation of Financial Contributions to Treatment of Waste Electrical and Electronic Equipments (폐전기·전자제품 처리에 대한 분담금 산정의 개선방안)

  • Kim, Han-Soo;Kim, Dae-Bong
    • Resources Recycling
    • /
    • v.29 no.4
    • /
    • pp.45-50
    • /
    • 2020
  • Producer and distributor of electrical and electronic equipment may directly collect waste electrical and electronic equipment that falls under the class to which the equipment they distributed belongs, or may join KERC(Korea Electronic Recycling Cooperative) and have KERC fulfill the duty to collect on behalf. In this study, the system of calculating the financial contributions is reviewed, and then the defined problems and improvement plan are proposed. First, the standard operation and time should be set for collection and transportation costs, taking into account the operation by collection type. Second, since there is a difference in the screening method of the recycling center, the standard cost for the allocation factor should be set by reflecting the difference in these methods and the characteristics of the product line being processed. Third, it is necessary to secure a budget of sufficient size by determining the median or average value rather than the minimum value in the forecast model for visit collection. This study is suggesting in that it examines the problems of the allotted contributions paid by the mutual aid members to KERC and suggests ways to improve them.

A Study on the Adjustment of Tariff Rates and Construction Fee in Korean District Heating Industry (지역난방사업의 공사비부담금과 열요금 연계조정방안에 관한 연구)

  • Kim, Hyunsook
    • Environmental and Resource Economics Review
    • /
    • v.17 no.3
    • /
    • pp.91-134
    • /
    • 2008
  • Korean district heating companies levy comprehensive construction fee on consumers in the beginning of construction period and the consumers' burden is much higher than those in any other network industries in Korea. It has also many problems such as inappropriate fee calculation method, cross subsidization, property right dispute, etc.. I show that the cut of construction fee by 30% and at the same time, the upward adjustment of tariff rates by 4~6% for 20 years on average will maintain current profitability based on the standard model simulation, I also suggest that fixed charge part of double tariff should be increased to 25% of total tariff and the cut of construction fee should be levied on fixed charge, directly to improve efficiency.

  • PDF