Development of Economic based Optimal Operation Program for Microgrid (경제성 기반의 마이크로그리드 최적운영 프로그램 개발)

  • Lee, Hak-Ju;Cha, Woo-Ku;Song, Il-Kun;Yoon, Yong-Tae
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.23 no.12
    • /
    • pp.106-114
    • /
    • 2009
  • This paper addresses unit commitment for microgrid optimization including renewable energy sources, working under deregulated power market. As microgrid supplies both heat and electricity for consumer, operational optimization must be done to meet their demand economically. So renewable energy sources are considered to be negative load, and batteries are used as the load flattening device to raise possibly operational function. In the state of solution, the program is developed to solve out the maximum profit of microgrid using dynamic programming method. Finally, its validity is verified through case study in isolation mode and interconnected mode. The S/W will be used to operate microgrid economically after the market of microgrid is formed.

A Study on Characteristic of Hybrid PCS for Solar Power Generation Considering on a Residential Lithium Battery ESS. (가정용 리튬배터리 ESS를 고려한 태양광 발전 하이브리드 PCS 특성에 관한 연구)

  • Hwang, Lark-Hoon;Na, Seung-kwon;Choi, Byung-Sang
    • Journal of Advanced Navigation Technology
    • /
    • v.26 no.1
    • /
    • pp.35-45
    • /
    • 2022
  • In this paper, we modeled the devices used easily in PV system circuits. In addition, for full operation of the photovoltaic system, a complete operation system for the DC-DC buck-boost converter and the MPPT control system was modeled and simulated to confirm good operation. we were constructed an actual system with the same conditions in the simulation and experimented. The purpose is to confirm the stable power supply through the load leveling by presenting the PCS considering ESS of photovoltaic power generation. we will do study to apply hybrid capacitors that have high energy density to the same size compared to the EDLC to DVR. As a result, we proposed a single-phase 3 kW grid-connected solar power converter.

Research Review of the All Vanadium Redox-flow Battery for Large Scale Power Storage (대용량 전력저장용 바나듐 레독스-흐름 전지 연구동향)

  • Choi, Ho-Sang;Kim, Jae-Chul;Ryu, Cheol-Hwi;Hwang, Gab-Jin
    • Membrane Journal
    • /
    • v.21 no.2
    • /
    • pp.107-117
    • /
    • 2011
  • The all vanadium redox-flow battery (V-RFB) is investigating as one of large-scale power storage systems. Particularly, V-RFB is being investigated as one of the power storage systems for the load leveling and output power equalization of the power systems using renewable energy such as solar and wind. In this paper, it was explained for the principle and construction, recent research review, economy, element technology in V-RFB.

Reference project of Small hydro power system Using low head (보(洑)를 이용한 '저낙차대유량'소수력발전소 건설)

  • Shin, Hong-Seob;Park, Kyung-Hwan;Song, In-Gyu
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.2112-2113
    • /
    • 2011
  • 우리나라는 연평균 강수량이 1,245mm로써, 비교적 강수량이 풍부하고 전국토의 2/3가 산지로 구성되어 있어 지형적 및 수문학적으로 수력자원 부존량이 많은 편이다. 하지만 수력자원 활용을 통한 발전소 건설은 매우 미미한데 이는 수력발전소 개발지점이 제약되어 있고 개발지점의 가동율 또한 매우 낮아 경제성 확보가 어렵기 때문이다. 수력발전은 전력수요 급증 시 부하 평준화 효과와 석유 수입대체 및 환경 친화적인 에너지원이라는 장점이 있다. 따라서 국산화된 수차발전시스템의 사용으로 초기투자비를 낮추고 하천형 수력발전소 건설을 통하여 가동율을 높인다면 우리나라의 수력발전사업은 크게 활성화 될 것이다. 본 논문에서는 하천형 수력발전소 시공사례를 통하여 주요 시공사례를 소개하고, 하천공사의 특징으로 인하여 설계 및 시공 시 반영해야 할 사항에 대해 몇 가지 소개하였다. 표준화를 통하여 건설비용을 절감, 발전 단가의 기준가격 현실화를 통한 재정적인 지원 및 법규 정비를 통한 제도적인 도움 이 세가지를 해결한다면 경쟁력 있는 소수력발전소 건설이 가능 할 것이다.

  • PDF

Empirical Results and Operational Cost Analysis of Geothermal Heat Pump System using Thermal Energy Storage in Cooling Season (축열식 지열원 히트펌프 시스템의 냉방기간 실증운전 결과 및 운영비용 분석)

  • Kim, Deukwon;Lee, Dongwon;Heo, Jaehyeok;Kim, Minhwi
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.30 no.4
    • /
    • pp.167-174
    • /
    • 2018
  • The geothermal heat pump systems were installed for heating and cooling of public buildings in Jincheon Eco-friendly Energy town. The heat pump system was operated at night to save on operational costs, and the cold heat was stored in thermal energy storage (TES). In this study, the performance of geothermal heat pump systems with the TES during the summer season was analyzed, and the operational costs with and without the TES were compared. The electric chiller model was used to simulate a heat pump applied without the TES system. Electric rates of each system were measured to calculate operational costs. When the TES is used in the air conditioning system, the electric load (30.4 MWh) calculated in the daytime can move to off-peak load time, and the operational cost is reduced by 36~54%.

Automatic control trial run of 54MW power energy storage system for frequency regulation of power system (전력계통 주파수조정용 54MW 전력에너지저장장치 제어기의 자동제어 시운전)

  • Lim, Geon-Pyo;Jeon, Woong-Jae;Han, Hyun-Gyu;Park, Chan-Wook;Im, Ji-Hoon;Chang, Byung-Hoon
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.635-636
    • /
    • 2015
  • 한전에서는 전력계통과 연계한 대용량 배터리 에너지저장장치(Energy Storage System)에 전력을 저장하였다가 전력계통의 최대 부하 보상, 주파수 조정, 신재생에너지 출력 평준화 등에 이용하고 있다. 배터리를 이용한 에너지저장장치의 실용성을 확인하기 위하여 한국전력공사 전력연구원 ESS연구사업단에서는 제주시 조천변전소에 4MW급 실증단지를 건설하여 시험을 진행하여 왔다. 최근에는 52MW 배터리 에너지저장장치를 전력계통의 주파수 조정용으로 사업화하고 있으며, 이와 관련된 연구도 진행하고 있다. 한국전력공사 전력연구원에서는 서안성, 신용인 변전소에 건설을 완료하여 시운전 중인 52MW 배터리 에너지저장장치 사업에 관련된 기술개발을 위하여 전력연구원에 24MW용 제어시스템, 조천변전소에 28MW용 제어시스템을 개발하여 관련기술을 서안성, 신용인 변전소 에너지저장장치에 적용하여 자동제어 시운전을 수행하였다. 본 논문에서는 주파수조정용 52MW 배터리 에너지저장장치의 시운전 내용을 소개하고자 한다.

  • PDF

A Case Study on Operation of Energy Management System Connected with Renewable Energy (신재생에너지 연계형 에너지관리장치의 운영 사례 연구)

  • Cho, Jai Young;Ra, In-Ho
    • Smart Media Journal
    • /
    • v.7 no.2
    • /
    • pp.71-77
    • /
    • 2018
  • This paper proposes the components of the energy management system (EMS) for optimum operation of renewable energy and associated energy storage system (ESS), the functions to be considered in designing, the analysis of operational effects, and finally the reduction of electricity costs. To accomplish the objectives, a lithium-ion battery system and an energy management system have installed in a PV system, and it presents the results analyzed with operation data for a year. To increase the system operation efficiency, we propose the effect that EMS is used to replace the demand power at the peak time with the charge power at the light load time, which suggests the influence of contributing to the charge benefit and load leveling according to the ESS tariff.

A Genetic Algorithm Application for the Load Balancing of Ship Erection Process (조선 탑재일정의 부하 평준화를 위한 유전 알고리듬)

  • Min, Sang-Gyu;Moon, Chi-Ung;Lee, Min-Woo;Chung, Kuy-Hoon;Park, Ju-Chull
    • IE interfaces
    • /
    • v.13 no.2
    • /
    • pp.225-233
    • /
    • 2000
  • In this paper, we develope a genetic algorithm for the erection scheduling in shipbuilding. Erection, the final manufacturing stage of shipbuilding, involves the landing and joining of blocks at drydock. Since several ships are built simultaneously at the same drydock and they compete with the common constrained production resource such as labor, space, and crane, we should consider both ship-specifics and common resource constraints for the desirable erection scheduling. Ship erection should also satisfy the predetermined dock cycle given from higher level production planning. Thus, erection schedule of a ship can be represented as a PERT/CPM project network with its own deadline. Since production resources are shared, the erection scheduling become the so-called multi-project scheduling problem with limited resources, which can not be solved easily due to the large size of project network. We propose a function as a minimization of load index which represented the load deviation over time horizon considering the yard production strategy. For the optical parameter setting, we tried various experiments. We verified that the proposed approach was effective to deal with the erection scheduling problem in shipbuilding.

  • PDF

Development of Integrated Assembly Process Planning and Scheduling System in Shipbuilding (조선에서의 조립공정계획과 일정계획의 지능형 통합시스템 개발)

  • Cho, Kyu-Kab;Ryu, Kwang-Ryel;Choi, Hyung-Rim;Oh, Jung-Soo
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.16 no.11
    • /
    • pp.22-35
    • /
    • 1999
  • The block assembly process takes more than half of the total shipbuilding processes. Therefore, it is very important to have a practically useful block assembly process planning system which can build plans of maximum efficiency with minimum man-hours required. However, the process plans are often not readily executable in the assembly shops due to severe imbalance of workloads. This problem arises because the process planning is done on block by block basis in current practice without paying any attention to the load distribution among the assembly shops. this paper presents the development of an automated hull block assembly process planning system which results in the most effective use of production resources and also produces plans that enable efficient time management. If the load balance of assembly shops is to be considered at the time of process planning, the task becomes complicated because of the increased computational complexity. To solve this problem, a new approach is adopted in this research in which the load balancing function and process planning function are iterated alternately providing to each other contexts for subsequent improvement. The result of case study with the data supplied from the shipyard shows that the system developed in this research is very effective and useful.

  • PDF

The bidirectional DC module type PCS design for the System Inter Connection PV-ESS of Secure to Expandability (계통 연계 PV-ESS 확장성 확보를 위한 병렬 DC-모듈형 PCS 설계)

  • Hwang, Lark-Hoon;Na, Seung-Kwon;Choi, Byung-Sang
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.14 no.1
    • /
    • pp.56-69
    • /
    • 2021
  • In this paper, the PV system with a link to the commercial system needs some advantages like small capacity, high power factor, high reliability, low harmonic output, maximum power operation of solar cell, and low cost, etc. as well as the properties of inverter. To transfer the PV energy of photovoltaic power generation system to the system and load, it requires PCS in both directions. The purpose of this paper is to confirm the stable power supply through the load leveling by presenting the PCS considering ESS of photovoltaic power generation. In order to achieve these purpose, 5 step process of operation mode algorithm were used according to the solar insolation amount and load capacity and the controller for charging/ discharging control was designed. For bidirectional and effective energy transfer, the bidirectional converter and battery at DC-link stage were connected and the DC-link voltage and inverter output voltage through the interactive inverter were controlled. In order to prove the validity of the suggested system, the simulation using PSIM was performed and were reviewed for its validity and stability. The 3[kW] PCS was manufactured and its test was conducted in order to check this situation. In addition, the system characteristics suggested through the test results was verified and the PCS system presented in this study was excellent and stronger than that of before system.