• Title/Summary/Keyword: 부하지속곡선

Search Result 56, Processing Time 0.032 seconds

Watershed Water Quality Management Plan Using SWAT and Load Duration Curve (SWAT와 부하지속곡선을 이용한 유역 수질 관리방안)

  • KAL, Byung-Seok;CHO, So-Hyun;PARK, Chun-Dong;MUN, Hyun-Saing;JOO, Yong-Eun;PARK, Jae-Beom
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.24 no.3
    • /
    • pp.41-57
    • /
    • 2021
  • This study evaluated the application of water quality management measures using the SWAT model and the effectiveness of the measures using the load duration curve targeting the Seohwacheon watershed located upstream of Daecheongho. As water quality management measures, artificial wetlands, reduction of neglected livestock, reduction of runoff from greenhouses, restoration of ecological rivers, application of LID technology, and management of point sources were applied. The applied technology evaluated the efficiency of water quality improvement measures by using the target water quality excess rate and the degree of load reduction for each sulfur through the load duration curve. The load duration curve was created by creating a long-term flow duration curve using SWAT and multiplying it by the target water quality. For the target water quality, the value corresponding to the 60th percentile was set as the target water quality using the 10-year data from the Okcheoncheon water quality observation point located in the downstream of Seohwacheon. Through this study, it was possible to confirm the applicability of various water quality measures through the SWAT model, and to examine the applicability of each period according to the sulfur through the load retention curve.

Estimation of non-point source pollution loads using inverse modeling and load duration curve (역산모델링과 부하지속곡선을 이용한 비점오염 배출량 산정)

  • Kim, Kyeung;Kang, Moon Seong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.538-538
    • /
    • 2017
  • 우리나라의 현행 수질오염총량제도에서 비점오염원에 대한 배출량은 배출원별로 유량조건에 따라 배출계수를 적용하여 산정하고 있으나, 강우 및 유역특성에 따라 크게 좌우되는 비점오염 배출특성을 반영하는 것에는 어려움이 있다. 한편, 역산모델링은 결과를 바탕으로 원인 값을 추정하는 방식으로 유량 및 수질측정결과, 점오염원 배출량 등 실측결과를 바탕으로 비점오염 배출량을 추정할 수 있다. 본 연구에서는 역산 모델링 기법을 이용하여 경안천 유역에서 배출되는 총인의 비점오염 배출량을 추정하고, 부하지속곡선을 통해 비점배출기준을 산정하고자 한다. 경안천 유역의 수질 및 유량측정자료, 하수처리장 현황, 오염원 자료 등을 수집하여, 점오염원 배출량을 추정하고 역산 모델링을 수행하였으며, 비점배출총량을 산정하였다. 본 연구의 결과는 현행 수질오염 총량제도의 배출계수에 대한 재검토와 향후 유량조건에 따른 차별적인 비점오염원 관리 필요성에 대한 기초자료로 활용될 수 있을 것으로 사료된다.

  • PDF

Application and Assessment of Web GIS-based Load Duration Curve System for Determination of Best Management Practices (최적관리 기법 선정을 위한 Web GIS 기반의 오염 부하지속곡선 시스템의 적용 및 평가)

  • Kim, Jong-Gun;Park, Youn-Shik;Jang, Won-Seok;Shin, Dong-Seok;Lim, Kyoung-Jae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.1380-1383
    • /
    • 2009
  • 수질오염총량관리제도(TMDL)는 유역의 수질 회복 및 관리를 위해 우리나라를 비롯해 미국의 여러 주에서 수립되어 적용되고 있다. 현재 미국에서는 유역 관리를 위한 TMDL의 기준설정에 있어 오염부하지속곡선(LDC)의 활용이 급격히 증가되고 있다. 그러나 기존의 LDC 방법은 사용자로 하여금 충분한 교육이 필요하고 LDC 생성을 위한 데이터 구축이 수동적으로 이루어지고 있다. 이러한 문제를 해결하기 위해 최근 Web GIS 기반의 LDC 시스템이 개발되어 활용되고 있다. 웹기반의 LDC 시스템은 미국 지질 조사국(USGS)이나 한국 환경부(MOE) 서버 등을 통해 구축된 자료를 이용하여 오염부하지속곡선을 생성하기까지의 모든 과정이 자동으로 처리되어 기존 수작업에 의한 방법의 단점을 보완하고 있다. 그리하여 본 연구에서는 우리나라 수질오염 총량 관리제도 단위유역인 낙본A와 금본C, 그리고 미국 인디애나 주의 Yellow River와 펜실베이니아 주의 Borkenstraw Creek 유역을 대상으로 웹기반 LDC 시스템을 이용하여 유역의 특성을 분석하였다. 본 연구에서 사용된 유량 및 수질 자료는 본 시스템에서 연계된 환경부 서버와 USGS 서버를 통해 구축하였다. 분석 결과 낙본 A 단위유역의 BOD 오염부하량과 농도가 대체적으로 목표수질 기준을 만족하는 것으로 나타났으나 전반적으로 유량이 적을 때 다소 목표수질을 초과하고 있는 나타나, 적합한 수질관리 대책이 필요한 것으로 분석되었다. 금본 C 단위유역의 경우 대부분 BOD 배출부하량이 할당 부하량보다 낮게 나타나는 것을 알 수 있고, 목표수질 농도에 비해 배출되는 BOD 농도 또한 대체적으로 낮은 것을 알 수 있다. 또한 Yellow River 유역의 경우는 유량이 많을 때 배출되는 수질농도가 목표수질을 초과하는 것으로 보아 강우시 배출되는 오염물에 대한 대책이 요구되고, Borkenstraw Creek 유역의 경우 유량이 적을 때를 제외하고 대부분 구간에서 배출부하량이 할당부하량을 초과하여 이에 대한 적합한 수질관리가 필요할 것으로 분석되었다. 본 연구의 결과에서 나타난 바와 같이 웹기반 LDC 시스템을 통해 수질오염총량관리제도 단위유역에 대한 수질 평가 및 특성 분석이 용이하며 수질 회복을 위한 근본적인 해결방법을 제시할 수 있을 것으로 판단된다.

  • PDF

A Study on the Applicability of Load Duration Curve for the Management of Nonpoint Source Pollution in Seohwacheon Basin (서화천 유역 비점오염원 관리를 위한 부하지속곡선 적용성 연구)

  • KAL, Byung-Seok;MUN, Hyun-Saing;HONG, Seon-Hwa;PARK, Chun-Dong;MIN, Kyeong-Ok;PARK, Jae-Beom
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.23 no.3
    • /
    • pp.174-191
    • /
    • 2020
  • In this study, we analyzed the vulnerable areas of non-point source pollutants and management pollutants and management time by subwatershed curves in the Seohwacheon basin located upstream of Daecheongho. First, in order to create a load duration curve, a long-term flow model SWAT was constructed to create a flow duration curve, and the result was multiplied by the target water quality to create a load duration curve. For the target water quality, monitoring data values measured from November 2017 were used for the management of nonpoint source pollutants in Seohwacheon, and a value corresponding to 60 percentile of the measured data was set as the target water quality. At this time, the target water quality was limited to"slightly good"(II) when the calculated value exceeded"slightly good"(II) of the river living environment standard. The vulnerable areas of non-point source of pollution were selected using the excess rate exceeding the target water quality, and the excess pollutant was judged as a management substance and the management time was selected through seasonal evaluation.

Analysis of Load Duration Curve Using Long Time Flow Measurement Data of Kyeongancheon (장기간 유량측정 자료를 이용한 경안천의 부하지속곡선 특성)

  • Noh, Changwan;Kwon, Phil-Sang;Jung, Woo-Seok;Lee, Myung-Gu;Cho, Yong-Chul;Yu, Soonju
    • Journal of Environmental Impact Assessment
    • /
    • v.28 no.1
    • /
    • pp.35-48
    • /
    • 2019
  • Long term flow measurement and water quality analysis data need to determine the target and allowable load for each basin in Total Water Pollution Load Management System (TWPLMS). The Load Duration Curve (LDC) is analyzed the relationship between flow data and water quality, and evaluates the pollutant load characterization by flow conditions. LDC of Kyeongancheon is created by the Flow Duration Curve (FDC) that was analyzed 8-day interval measured flow data from 2006 to 2015 and numeric water quality target in Kyeongancheon. As a result of this study, it is necessary to manage the point source pollutant because the numeric water quality target is not satisfied in the low flows. Also the numeric water quality target has been exceed for four months from March to June of the year and continuous and systematic watershed management is required to satisfy the numeric water quality target.

Analysis of Load Duration Curve Difference using 8 Day and Extended Daily Flow (8일 유량 및 일유량 자료를 이용한 오염부하지속곡선의 변화 분석)

  • Kwon, Pilju;Ryu, Jichul;Kim, Hongtae;Lim, Kyoung Jae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.166-166
    • /
    • 2017
  • 현재 우리나라에서 많은 연구에 활용되고 있는 오염부하지속곡선(Load duration curve, LDC)은 단일 기준유량의 문제점을 개선하기 위해 전체 유량 범위를 고려한 수질오염총량관리제(Total Maximum Daily Loads, TMDL) 평가 기법으로 개발되었다(Choi et al., 2012). LDC를 이용해 목표수질 달성여부를 분석하기 위해서는 일유량자료를 바탕으로 유량지속곡선(Flow Duration Curve, FDC)의 작성이 선행되어야 하는데(Park and Oh, 2012), 365일 연속적으로 측정된 실측 자료를 이용하는 것이 가장 확실하고 정확한 방법이다. 그러나 현재 환경부에서는 총량관리 단위유역에서 8일 간격으로 실측 유량 및 수질 측정이 이루어지고 있고, 특히 주로 비강우 시에 측정이 이루어지고 있는 실정이기 때문에 고유량에 대한 모니터링 자료가 부족한 실정이다. 이 같은 이유로 많은 연구에서 불연속적인 평균 8일 간격 유량을 그대로 사용하거나 일유량자료를 확보하기 위해 다양한 방법을 이용하고 있다. 그러나 이러한 유량자료의 변동은 유랑지속곡선에 변화를 주고 결과적으로는 LDC를 이용한 목표수질 달성여부를 판단함에 있어 불확실성이 있다. 이에 본 연구의 목적은 환경부 총량측정망 8일유량자료와 이와 연계성이 있는 국토교통부 하천유량 측정망 일유량자료를 이용하여 각각의 LDC를 작성하고, 이러한 일유량과 8일유량 사용이 LDC를 이용하여 목표수질에 대한 오염부하 특성분석에 어떠한 영향을 미치는지 유량 조건별로 차이를 비교분석하는 데 있다.

  • PDF

Analysis on Economics and Security of Korean Generating Mix (우리나라 전원믹스의 경제성 및 공급안정성에 관한 연구)

  • Ok, Ki-Youl;Kim, Yong-Joon;Kim, Sang-Ju
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.826-827
    • /
    • 2007
  • 우리나라의 현행 전원믹스는 경제성의 측면에서 상당히 왜곡된 것으로 언급되고 있으며, 전력시장의 기저발전기에 대한 규제상한 가격은 이를 간접적으로 입증하는 근거라 할 수 있다. 균등화 발전원가를 이용하여 장기한계비용을 도출하고, 이를 부하지속곡선에 대입하여 산출한 경제적 전원믹스은 원자력 발전용량의 대폭적인 증가의 필요성을 보여준다. 이는 원전이 기저전원으로 경제성을 가지는 측면이 있지만 무엇보다도 우리나라의 높은 부하율(편평한 부하지속곡선)에 기인하고 있다. 이산화탄소 배출비용의 부과는 원전의 경제적 우위를 확장시키는 반면 전원다변화를 현격하게 축소시키는 결과를 가져와 정책목표간 조율이 필요함을 시사한다. 균등화 발전원가는 전력시장체제의 가격 및 수익에 대한 리스크를 효과적으로 반영하지 못하므로 포트폴리오 이론 및 실물옵션 이론 등을 활용한 경제성 평가방법론의 개발이 향후 과제로 제기된다.

  • PDF

Assessment of the Non-point Source Pollution Control Strategies for Water Quality Improvement in the Haeban Stream of West Nakdong River Watershed (서낙동강 유역 해반천의 수질 개선을 위한 비점오염관리대책 효과 분석)

  • Yejin Kim
    • Journal of Wetlands Research
    • /
    • v.26 no.1
    • /
    • pp.1-9
    • /
    • 2024
  • In this study, a HSPF model was developed to simulate runoff and water quality in the Haebancheon watershed, which has a high land area ratio and population density among the West Nakdong River watersheds. Various non-point source pollution control strategies were applied, and the reduction in pollutant loads and the exceedance rate of water quality standards were analyzed. The scenarios included basic road cleaning for reducing pollutant loads, runoff reduction measures considering extensive low-impact development techniques, and inflow reduction measures to mitigate non-point source pollution entering the river. In the first step, practical conditions such as the number of vehicles for road cleaning in Kimhae City were considered, while for the second and third steps, it was assumed that 50% of the applicable land use area was used to be applicable for the LID techniques. As a result of applying all three measures, it was analyzed that the BOD pollutant load could be reduced by 58.28%, T-N by 58.49%, and T-P by 51.56%. Furthermore, the 60th percentile of water quality measurements accumulated over 5 years was set as the target water quality, and a flow-duration curve was constructed. The exceedance rate of the flow-duration curve before and after applying non-point source pollution reduction measures was analyzed. As a result, for BOD, the exceedance rate decreased from 41.57% before applying the measures to 16.32% after, showing a 25.25% reduction in the exceedance rate. For T-N, the exceedance rate decreased significantly from 40.31% before the measures to 22.84% after, and for T-P, it decreased significantly from 62.43% to 27.22%.

Optimal Quantity of Peak Load Curtailed by DR Programs in Korean Power Market (우리나라 전력시장의 부하관리용량 산정)

  • Shim, Dae-Sub;Kim, Doo-Jung;Lee, Ho-Seong;Choi, Eun-Sil
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.555_556
    • /
    • 2009
  • 우리나라는 수요관리를 위해 '85년도 하계휴가보수, 자율절전 제도를 도입한 후 부하관리 효과를 면밀히 평가하지 않은 채 관습적으로 매년 부하관리 목표량을 상향하며 더 많은 예산을 지속적으로 투입하고 있다. 하지만 우리나라는 심야시간대 낮은 요금체계 등으로 인하여 부하율이 높은 수준으로 부하관리 효과가 저조한 실정이며, 최근 여름철 이상 기온 발생 등으로 부하관리기간 이외에 연중 최대 부하가 발생하는 빈도가 점차 증가하고 있다. 따라서 본 논문에서는 우리나라의 도 소매시장에서 자발적인 부하관리 인센티브, 현 부하관리제도 등을 분석하고 우리나라 전력계통의 부하지속곡선에서 적정 부하관리용량을 산정하고자 한다.

  • PDF