• Title/Summary/Keyword: 부하공급능력

Search Result 55, Processing Time 0.028 seconds

향후 우리나라의 2차 배전전압

  • 홍순학;장정태;송일근;김경화
    • 전기의세계
    • /
    • v.42 no.1
    • /
    • pp.12-20
    • /
    • 1993
  • 본고에서는 언급한 바와 같이 각 나라의 전기방식은 단상 3선식과 4선식이 대부분임을 알 수 있으며, 우리나라의 경우 부하특성은 동력수용이 급증에 따른 부하의 고밀도화로 인한 3상 4선식 220/380-Y 공급이 증가 추세에 있다. 한편, 수요밀도가 높은 단상 2선식 공급지역도 부하가 증가됨에 따라 공급능력의 한계성 도달이 예상되고 단상 3선식 110/220V 지역 역시 공급능력의 한계성 도달이 예상되는 바, 단상3선식 220/440V(440V는 Floating) 승압의 필요성이 요구되고 있다.

  • PDF

Evaluation of Transfer Capability based on Load Supplying Capability Calculation using Nonlinear Primal-Dual Interior Point Method (비선형 주.쌍대내점법을 이용한 부하공급능력의 산정에 기반한 전력수송능력의 평가)

  • Jeong, Min-Hwa;Lee, Byeong-Jun;Song, Gil-Yeong
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.49 no.4
    • /
    • pp.161-167
    • /
    • 2000
  • This paper presents a new methodology that can evaluate transfer capability of composite power systems from the adequacy point of view in power system planning stages. First of all, to evaluate practical load supplying capability, nonlinear optimization problems of maximum load supplying capability(MLSC) and economic load supplying capability(ELSC) are formulated and solved by nonlinear primal-dual interior point method. Here, physical constraints considered in the optimization problems are the limits of bus voltage, line overloading, and real & reactive power generation. Also, an evaluation method of transfer capability is presented based on margins calculated by the MLSC and ELSC. Especially, to evaluate transfer capability flexibly, simple indices such as expected MLSC, transfer capability margin, and power not supplied are respectively proposed by considering (N-1) line outage probability. Numerical results on IEEE RTS 24, IEEE 118, and IEEE 300 bus system show that the proposed algorithm is effective and useful for power system planning stages.

  • PDF

PSTCP : A Tool to Evaluate Power System Transfer Capability (전력계토의 수송능력 평가 프로그램 개발에 관한 연구)

  • Yu, Su-Hyeon;Jeong, Jong-Hun;Jeong, Min-Hwa;Lee, Byeong-Jun;Song, Gil-Yeong;Sin, Yeong-Cheol;Kim, Yeong-Seon
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.7
    • /
    • pp.872-880
    • /
    • 1999
  • This paper presents an algorithm that can calculate the evaluation index of power system from the transfer capability point of view. The algorithm adopts a successive linear programming skill to solve an optimal solution. Two indices which are transfer margin index and economic matching index have been developed. Prior to calculating these indices, Maximum Load supplying Capability(MLSC) and Economic Load Supplying Capability(ELSC) are utilized as basic data. For man-machine interface, graphical user interface has been implemented so that an unified software package PSTCP(Power System Transfer Capability Program) has been developed. KEPCO systems planned up to 2006 year have been tested to show effectiveness and usefulness of the PSTCP for power system planning stages.

  • PDF

Probabilistic Arrival Power Evaluation at Each Load Point (부하지점에서의 확률론적 공급능력 평가)

  • Moon, Seung-Pil;Chang, Byung-Hoon;Kim, Gi-il
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.580-581
    • /
    • 2007
  • 전력시장의 환경변화와 전력소비자들의 다양성 그리고 전력소비자들의 다양한 요구를 수용하기 위해서 확률론적 전력공급 신뢰도 평가에 대한 사회적 요구가 커지고 있다. 과거 전력계통의 신뢰도 평가는 발전계통만을 대상으로 하는 HLI에서의 신뢰도평가였으나 최근 송전망을 포함한 복합전력계통의 신뢰도 평가에 대한 관심과 연구가 진행되고 있다. 복합전력계통의 신뢰도 평가에서는 일반적으로 각 부하지점별 공급지장 가능성 등을 시뮬레이션을 통해 산정한다. 본 연구에서는 각 부하지점에서의 공급가능용량을 확률론적으로 평가하는 방법을 보인다.

  • PDF

Field Application of a Latent Heat Storage Tank for Load Shaving of Domestic Hot Water Supply in District Heating (지역난방 급탕공급 부하균등화를 위한 잠열축열조의 현장 적용)

  • Park, Sung Yong;Yoo, Hoseon
    • Plant Journal
    • /
    • v.17 no.2
    • /
    • pp.42-47
    • /
    • 2021
  • In terms of district heating operation, efficient production and supply of heat by alleviating the peak load at a specific time require an application technology that can solve the inconvenience of the user and the difficulties of the supplier. In this study, a 78 ℃ class PCM heat storage tank suitable among the technologies that can solve these problems was manufactured and applied to the hot water supply facility for apartments in district heating users. As a result of the application of this system, it was confirmed that the supply temperature was constant to the user compared to the existing supply method. In addition, it was confirmed that the reduction of the peak load due to load equalization reduced the heat supply margin of 10% in the existing heat supply facility. And the construction cost of the new heat supply facility and the construction cost of heat users is decreased by 5% and 10%, respectively.

Improvement of Load Follow Control Logic for KNGR (차세대원자로 부하추종운전 방법 개선)

  • 이광호;박문규;최유선
    • Proceedings of the Korea Society for Energy Engineering kosee Conference
    • /
    • 2000.11a
    • /
    • pp.121-126
    • /
    • 2000
  • 국내 원자력발전은 전체 전력공급의 40%이상을 차지하고 있으면서도 그 특성상 기저부하용으로만 사용되고 있다. 그러나 전기에너지의 효율적인 이용과 다양한 전력수요에 능동적으로 대처할 수 있도록 원전의 부하추종운전 능력이 더욱 중요하게 인식되고 있는 상황이다. G7과제의 하나인 차세대원자로(Korean Next Generation Reactor, KNGR)는 기본적인 요건으로 부하추종운전 능력을 갖도록 개발되고 있다. 여기에서는 기존에 개발된 부하추종운전 제어논리를 변경된 부하추종운전 기본요건에 맞도록 하고, 구동 제어군 특성의 극대화 및 온도불감대 출력분포 제어논리 등을 개선시킴으로써 주기초 및 주기중 뿐만아니라 90% 주기말에서도 ASI(Axial Shape Index)가 만족스럽게 제어됨을 확인하였다.

  • PDF

98년 전력산업 정책

  • 유재열
    • Electric Engineers Magazine
    • /
    • v.185 no.1
    • /
    • pp.10-16
    • /
    • 1998
  • 전력수급의 안정을 위해 공급능력을 확충하고 에너지절약시책을 강력히 추진하였다. 하계전력수급의 공급예비율은 7%를 목표로 하였다. 한국전력의 수요관리사업을 대폭 확충하였다. 한국전력의 수요관리사업을 대폭 확충하였다. 96년 440억원이었던 수요관리사업을 97년 540억원으로 확대하여 빙축열냉방 및 요금구조개선 등 부하관리부문과 고효율조명기기 보급 등 효율향상에 투자하여 신규전력 설비투자비를 8천억을 절감하였다.

  • PDF

The Development of Hub Substation for electric service to massed demand Area (부하밀집지역 전력공급을 위한 허브(Hub)변전소 개발)

  • Byun, H.W.;Baik, S.D.;Koo, B.W.;Hur, Y.H.;Shin, B.H.
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.36-37
    • /
    • 2006
  • 현재 국내 154kV 표준형태 옥내변전소의 전력공급능력은 대부분 주변압기 4 뱅크 규모로 계획 및 운영되고 있다. 대도시 도심, 신규개발 산업단지, 신도시 등에는 재개발 및 지속적인 확장으로 인해 전력수요가 꾸준히 증가하고 있어 안정적인 전력공급능력 확보를 위해서는 최초 변전소 준공 이후 해당지역 내 변전소 추가건설이 불가피한 상황이다. 그러나 전력공급설비는 국민들에게 혐오, 위해설비로 잘못 인식되어 전력 공급설비 건설반대 등 집단민원이 지속적으로 증가하는 추세이다. 또한 지방자치단체는 주민들의 지가하락 등을 우려한 민원을 의식하여 전력설비건설에 필요한 각종 인허가를 지연 또는 거부하는 등 변전소 부지확보를 더욱 어렵게 하고 있다. 이로 인한 변전소 건설지연에 따른 전력공급 차질이 우려되고 있다. 이러한 문제점을 개선하기 위해 전력공급능력은 기존변전소의 2배로 증대되지만, 부지면적은 1.4배정도 밖에 소요되지 않아 안정적인 전력공급과 국토의 효율적인 이용이 가능한 허브(Hub)변전소를 개발하게 되었다.

  • PDF

ARC free new DC plugger using static transfer switch (아크가 발생하지 않는 새로운 전자식 DC 플러그)

  • Kim, Tae-Jin;Baek, Ju-Won;Kim, Jong-Hyun;Ryu, Myung-Hyo
    • Proceedings of the KIPE Conference
    • /
    • 2012.07a
    • /
    • pp.568-569
    • /
    • 2012
  • 최근 태양광, 연료전지등과 같은 DC 에너지원의 증가와 컴퓨터 및 각종 DC 부하의 증가로 인하여, 보다 효과적인 DC 에너지 공급 시스템을 연구하고 있다. 본 연구에서는 DC 플러그를 전원에서 분리할 때 반도체 소자를 사용하여 전원과 부하가 끊어지므로 아크는 전혀 발생되지 않는 전자식 플러그를 제안하였다. 400V, 10A/port의 차단능력을 가지는 시작품을 제작하고, 이 플러그의 차단능력이 기존방식에 비하여 약 50us이상(약1/10배) 빨리 소호됨을 확인하였다.

  • PDF

Reactor Control Method for Load Follow Operation of KNGR (KNGR의 부하추종 운전 제어)

  • Kim, Yong-Hee;Cha, Kune-Ho
    • Proceedings of the KIEE Conference
    • /
    • 1999.11c
    • /
    • pp.600-602
    • /
    • 1999
  • 원자력발전 비율이 증가함에 따라 전기에너지의 효율적인 이용과 원자력발전의 경쟁력 제고를 위하여 원자력발전소(이하 원전)의 부하추종운전 필요성이 점점 커지고 있다. G7과제의 하나로 개발되고 있는 차세대원자로(KNGR, Korean Next Generation Reactor)는 경쟁력 있는 원전의 설계를 위하여 "일일부하추종운전 능력의 확보"를 기본 성능요건의 하나로 하여 개발되고 있다. 그러나 수동으로 원자로출력분포를 제어하는 기존 원전의 제어방식으로는 상기목표를 충족시키기 어려워 원자로의 출력분포와 출력을 동시에 제어하는 새로운 자동 제어방식을 도입하였다. 본 논문에 기술된 제어방법은 원자로 출력분포 상태에 따른 비선형 제어방법이 적용되며 목표출력 부근에서의 Oscillatory Behavior 방지를 위해 설정된 Deadband 내에서의 다른 상태변수를 제어하기 위한 알고리즘도 포함된다. 개발된 제어방법의 성능을 확인하기 위해 원자로 증기공급계통 전체를 모델링한 성능분석 Simulator를 이용한 Numerical Simulation을 수행하였다. 일일부하추종운전은 100-50-100%P[$(10{\sim}16)-2-(10{\sim}4)-2$ hr] power cycle over a 24-hour period, 주파수제어는 일반적인 Grid Follow에 대해 Simulation하였다.

  • PDF