• Title/Summary/Keyword: 볼트 예하중

Search Result 3, Processing Time 0.018 seconds

FEM Analysis of the Spline Joint with Bolt Pre-load (스플라인결합 조인트의 볼트 예하중에 대한 유한요소 해석)

  • Tak, Seung-Min;Kang, Min-Kyu;Park, Dong-Jin;Lee, Seok-Soon
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.28 no.11
    • /
    • pp.1316-1322
    • /
    • 2011
  • Most of the mechanical structures use bolting or spot welding for the whole structure. In recent years, bolting & rivets are used rather than the welding due to reassembly and repair. Analysis of bolted joints is so complicate that many conditions must be considered such as pre-load and contact, etc.. Bolted joint analysis is done by theoretical, experimental & numerical methods. However, numerical analysis in the bolted joint is used because the contact and stress in the joints are changed due to the pre-load. In this study, we analysis the slip and the deformation of the contact area in the joint depending on the pre-load and find the optimized bolting condition.

A case study on the bolt failure of the moving parts of a marine diesel engine (선박용 디젤기관의 운동부 볼트 손상사례에 대한 연구)

  • Kim, Jong-Ho;Lee, Jae-Hyun
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.41 no.1
    • /
    • pp.118-124
    • /
    • 2017
  • To investigate and analyze the cause of the failure of the connecting rod bolt and the crank pin bearing bolt of the diesel engine of this study, the following results were obtained through site surveying, the investigation of literature referring to similar failures, testing and inspection of the fracture surface, and the experience of the researchers. The fractured crank pin bearing bolt of the diesel engine is estimated to be damaged later than the connecting rod bolt. From the shape of fracture surface, it is evident that the failed connecting rod bolt is fractured by fatigue failure due to abnormally repeated loads (e.g. loosening of the connecting bolt, etc.), and is not failed by brittle fractures due to the impact load. The surface of the U-nut on the fractured connecting rod bolt has been worsening due to the improper use of lubricant (agent for prevention of thread fixing) and no usage of separating the each connecting rod on each cylinder. Moreover, there is the possibility that those poor surface conditions of the fractured connecting rod bolt have affected the failure of the connecting rod bolt of the main engine. And it could be assumed that the mechanical characteristic and manufacturing process of the failed connecting rod bolt and crank pin bearing bolt, which were made by a domestic company, conform to the design requirements for those bolts.

Modeling the Effect of Water, Excavation Sequence and Reinforcement on the Response of Tunnels

  • Kim, Yong-Il
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.3
    • /
    • pp.161-176
    • /
    • 1999
  • A powerful numerical method that can be used for modeling rock-structure interaction is the Discontinuous Deformation Analysis (D D A) method developed by Shi in 1988. In this method, rock masses are treated as systems of finite and deformable blocks. Large rock mass deformations and block movements are allowed. Although various extensions of the D D A method have been proposed in the literature, the method is not capable of modeling water-block interaction, sequential loading or unloading and rock reinforcement; three features that are needed when modeling surface or underground excavation in fractured rock. This paper presents three new extensions to the D D A method. The extensions consist of hydro-mechanical coupling between rock blocks and steady water flow in fractures, sequential loading or unloading, and rock reinforcement by rockbolts, shotcrete or concrete lining. Examples of application of the D D A method with the new extensions are presented. Simulations of the underground excavation of the \ulcornerUnju Tunnel\ulcorner in Korea were carried out to evaluate the influence of fracture flow, excavation sequence and reinforcement on the tunnel stability. The results of the present study indicate that fracture flow and improper selection of excavation sequence could have a destabilizing effect on the tunnel stability. On the other hand, reinforcement by rockbolts and shotcrete can stabilize the tunnel. It is found that, in general, the D D A program with the three new extensions can now be used as a practical tool in the design of underground structures. In particular, phases of construction (excavation, reinforcement) can now be simulated more realistically.

  • PDF