• Title/Summary/Keyword: 보수과정

Search Result 711, Processing Time 0.023 seconds

Study on design of computer maintenance & repair system using SLA technique (SLA 기법을 활용한 컴퓨터 유지보수 시스템 설계에 관한 연구)

  • 김성선;최용식;신승호
    • KSCI Review
    • /
    • v.12 no.1
    • /
    • pp.21-27
    • /
    • 2004
  • In this study We designed development and operation of computer maintenance & repair system which is efficient and systematic on the disorder of PC in the places with many computers such as company, public organization. school, etc. We designed so as to clearly measure and manage the service level by using SLA(Service Level Agreement) technique which is being used actively in network maintenance & repair contract. And We designed system which can provide One Stop Service so that the whole process of service including service demand point, maintenance & repair activity, user's satisfaction.

  • PDF

Analytical Modelling for Recarbonation Process of Concrete Repaired with Patching Repair Material (단면복구재로 보수된 콘크리트의 재탄산화 과정에 대한 분석적 모델링)

  • Do, Jeong-Yun;Kim, Doo-Kie;Song, Hun;Jo, Young-Kug
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.2
    • /
    • pp.89-96
    • /
    • 2010
  • This study presented the analytical evaluation model effective in the concrete structure repaired with a patching material. The model considered the effect of the repair material on carbon dioxide penetration into the repaired concrete as evaluating the remaining service life of the CO2-deteriorated concrete structure after repair. The diffusion profiles of carbon dioxide as well as the carbonated concrete were effectively able to be modelled with analytical method based on Fick's 1st diffusion law. The evaluation of the model equation showed the good result and rational process quantitatively and numerically to evaluate the remaining service life of the repaired concrete structure after repair.

Effect of Similar Metal Weld & Preemptive Weld Overlay On Residual Stress of Repair Weldment In Surge Nozzle (고리 원전 밀림관 노즐의 동종용접과 예방용접 Overlay가 보수용접 잔류응력에 미치는 영향)

  • Oh, Chang-Young;Song, Tae-Kwang;Shim, Kwang-Bo;Kim, Ji-Soo;Kim, Yun-Jae;Lee, Kyung-Soo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.22 no.6
    • /
    • pp.557-564
    • /
    • 2009
  • Welding residual stress is occurred after welding process. Tensile residual stress is one factor of PWSCC. Repair welding usually happened during the manufacturing welding process. Repair welds cause strong tensile residual stress. In PWR, Repair weldments made by Alloy 82/182 is susceptible to PWSCC caused by tensile stress, material and environment. Therefore, mitigation of welding residual stress in weldments is important for reliable operating. PWOL is one of the methods for mitigation and verified for over twenty years. In this paper, residual stress distribution of repaired weldments and the effect of PWOL on mitigation is examined for surge nozzle.

A Study on Decision Making for the Maintenance of Component-Based Software (컴포넌트 기반 소프트웨어 유지보수 의사결정에 관한 연구)

  • 윤민석;김계영
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.04a
    • /
    • pp.657-660
    • /
    • 2000
  • 최근 재사용성에 근간을 둔 컴포넌트 기반 소프트웨어(Component-Based Software : CBS) 기술의 실현에 따라 이와 관련된 유지보수 의사결정의 내용도 변화하여 새로운 연구 과제로 등장하고 있다. 이에 본 연구는 컴포넌트 기반 소프트웨어 유지보수와 관련된 의사결정의 이론적 근거를 탐색하고 컴포넌트 평가 및 선택을 위한 모형 개발을 목적으로 한다. 모형 설계에는 평가 기준의 체계를 수립하고 적절한 평가 기법의 선택 및 적용이 포함된다. 평가 기준 구성을 위하여 CBS 유지보수의 특성을 고려한 다차원적 접근법에 의한 계층적 체계화를 시도하였으며, 일부 상호 종속적 관계를 나타내는 요소들에 대하여는 네트워크 관계를 나타내는 모듈로 포함시켰다. 체계화된 평가 기준에 따른 의사결정 대안의 평가 기법으로 주관적 판단의 계량화에 적절하다고 판단되는 계층분석과정(Analytic Hierarchy Process) 기법 및 네트워크분석과정(Analytic Network Process) 기법을 선정하고 적절한 예를 들어 모형 적용의 이해를 돕고자 하였다.

  • PDF

2G Switching System Maintanance and Switching System Improvement (2G 교환기 유지보수 업무와 향후 교환기 유지보수 업무 개선)

  • Kim Su-Hwan;Kim Hee-Dong
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2003.08a
    • /
    • pp.362-366
    • /
    • 2003
  • LG전자/정보통신에서는 날로 심화되고 있는 통신 경쟁 및 시장개방 환경 하에서 경쟁력 확보하고, 교환기 시스템이 운용자 및 가입자에게 다양하고 안정된 시스템을 제공하기 위하여, 보다. 효과적으로 교환기를 운용하기 위한 유지보수 작업을 꾸준히 추진 시행하고 있다. 향후 3세대 또는 4세대 이동통신으로 전환시 급속한 기술적 발전과 고객에 대한 마인드 변화로 인한 장비 제조업체의 보다. 경쟁력 있는 유지보수 방법이 적용 되어야 할 것이다. 본 논문에서는 2세대 이동통신망 교환기 시스템을 대상으로 한 수년간의 유지보수 경험을 토대로 이동통신망 교환기의 유지보수 중요성에 대하여 기술하고, 향후 이동통신망이 진화되는 과정에서 교환기 유지보수의 고려사항 및 효율적 유지보수 방안을 제시하고자 한다.

  • PDF

The Study on Software Maintenance Project Efforts Estimation Using Function Point (기능점수기법에 의한 소프트웨어유지보수 프로젝트의 소요인력 규모추정)

  • Ahn, Yun-Sik;Kim, Hyun-Soo
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2002.11a
    • /
    • pp.286-292
    • /
    • 2002
  • 국내기업에서 대부분의 정보시스템이 정보시스템 수명주기로 불 때 운영단계로 진입하고 조직의 정보시스템의존도 및 시스템규모가 점점 늘어남에 따라서 정보시스템의 운영과정에서 발생되는 소프트웨어 유지보수에 투입되는 비용도 증가되고 있다. 그러나 소프트웨어유지보수 프로젝트에 소요되는 투입인력 규모예측에 관련된 연구는 소프트웨어개발부문에 비해 적은 것이 사실이다. 본 연구에서는 유지보수프로젝트를 대상 소프트웨어의 규모는 IFPUG에서 개발된 기능점수기법(function point model)을 적용하여 산정하고, 특정 소프트웨어유지보수 프로젝트 생산성에 영향을 미치는 유지보수환경, 프로덕트, 투입인력 등 3개 영역에서 도출된 총 10개 특성을 보정요소로 설정한 후, 유지보수프로젝트의 소요인력 규모를 추정하기 위한 비선형회귀모형을 제시하고 있다. 실제 수행된 26개 유지보수프로젝트로부터 수집한 실적데이터를 이용하여 이 모형을 실증 분석한 결과 유의한 모형임이 밝혀졌다.

  • PDF

New Method to Calculate Cost of Capital for Telecommunication Market (통신시장의 투자보수율 산정 개선방안)

  • Kim, Chang-Soo;Chon, Mi-Lim
    • Journal of Digital Convergence
    • /
    • v.10 no.4
    • /
    • pp.181-190
    • /
    • 2012
  • Cost of capital is one of the key factors of accounting regulation policy for telecommunication market. This paper aims at investigating efficient policy improvements concerning accounting regulation for telecommunication market focused on cost of capital calculation methods and its application. At First, cost of capital estimating method should be improved. In estimating the cost of equity capital, it is necessary to use benchmark method for Equity risk premium. It will reduce analytical errors caused by a rapid economic change and inflation. It is also more desirable to use debt premium adding method for the cost of debt capital. Optimal capital structure method may be considered a better way to estimates capital structure. Secondly, cost of capital estimating process also has to be reformed. Telecommunication industry changes rapidly so it does not reflect fast environmental changes. Therefore, cost of capital should be calculated every year. Cost of capital should be calculated by individual companies. There is information asymmetry between regulators and regulatees. Because of that cost of capital calculating process takes long time and cost a lot. To solve this problem, regulator should legislate on cost of capital calculation and then regulating companies report the calculating result. Lastly, major telecommunication companies are all listed now and it is possible to calculating it separately. We must continuously improve the estimating method and application of cost of capital and due to the fast growing of telecommunication industry. The process of determining the calculating method must be discussed and best method chosen.

Effects of Repair Weld of Reactor Pressure Vessel Upper Head Control Rod Drive Mechanism Penetration Nozzle on J-Groove Weldment Using Finite Element Analysis (유한요소법을 이용한 원자로 상부헤드 CRDM 관통노즐 J-Groove 보수용접 영향 분석)

  • Kim, Ju Hee;Yoo, Sam Hyeon;Kim, Yun Jae
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.38 no.6
    • /
    • pp.637-647
    • /
    • 2014
  • In pressurized water reactors, the upper head of the reactor pressure vessel (RPV) contains numerous control rod drive mechanism (CRDM) nozzles. These nozzles are fabricated by welding after being inserted into the RPV head with a room temperature shrink fit. The tensile residual stresses caused by this welding are a major factor in primary water stress corrosion cracking (PWSCC). Over the last 15 years, the incidences of cracking in alloy 600 CRDM nozzles have increased significantly. These cracks are caused by PWSCC and have been shown to be driven by the welding residual stresses and operational stresses in the weld region. Various measures are being sought to overcome these problems. The defects resulting from the welding process are often the cause of PWSCC acceleration. Therefore, any weld defects found in the RPV manufacturing process are immediately repaired by repair welding. Detailed finite-element simulations for the Korea Nuclear Reactor Pressure Vessel were conducted in order to predict the magnitudes of the repair weld residual stresses in the tube materials.

A Reliability Centered Optimal Maintenance Model Applying Various Maintenance Schemes For Distribution System (배전계통의 다양한 유지보수 기법을 적용한 신뢰도 기반 최적 유지보수 모델)

  • Heo, Jae-Haeng;Jung, Ha-Sub;Kim, You-Chang;Song, Jin-Man;Park, Jong-Keun
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.50-51
    • /
    • 2006
  • 앞으로 진행되는 배전계통의 자유화 환경에서 각 배전사업자들은 고객에게 높은 신뢰수준의 전력을 값싸게 공급하려 할 것이다. 높은 수준의 신뢰수준을 유지하기 위해서 배전계통내의 component의 점검을 통하여 고장의 원인이 될 만한 것들을 찾아내고 고장이 일어나기 전에 그것을 유지보수 하여야 한다. 이 문제는 대상 Component를 얼마나 자주 점검 및 보수를 해야 하는가 라는 문제가 된다. 하지만 그에 따른 비용도 소요가 될 것이다. 본 논문에서는 점검 과 보수 과정의 model을 Markov model로 사용하였으며 대상 Component의 상태에 따라서 다른 보수 기법을 적용함으로써 점검비용과 보수비용 정전비용을 최소화하는 점검 주기를 찾았다. 또한 제안된 방법을 실제 시스템과 유사한 모의시스템에 적용하였다.

  • PDF

Estimation of Life Expectancy and Budget Demands based on Maintenance Strategy (도로포장 유지보수 전략에 따른 기대수명과 보수비용산정)

  • Han, Dae-Seok;Do, Myung-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.4D
    • /
    • pp.345-356
    • /
    • 2012
  • Road pavement requires repetitive maintenance works to maintain satisfactory service level to the public. However, the repetitive maintenance works upon deteriorated pavement structure make negative effects to deterioration speed. It often leads to inefficient use of limited budget. For that reason, the pavements require reconstruction work to recover their original performance. Recently, construction demands in the Korean national highway have already been reached to maximum level, and the aged pavements start to demand much more reconstruction works. However, in the real world, road agencies have often been confused when they determine maintenance design for such aged road sections due to budget constraint. It is because there is no reliable long-term maintenance strategy that supports their decision making. To support their decision making, this paper aimed to suggest the best maintenance strategy considering changing process of pavement performance by repetitive maintenance works. As an analysis method, probability distribution and hazard function to estimate the life expectancy were adopted, and then the results were used for long-term life cycle cost analysis with deterministic or Monte-Carlo method under various scenarios. As an empirical study, the Korean national highway data that has long-maintenance history data since 1986 has been applied. Last, this paper considered quality assurance of maintenance work to improve maintenance quality. These could be important information as a part of long-term maintenance strategy of pavement.