• Title/Summary/Keyword: 보수공사

Search Result 398, Processing Time 0.022 seconds

A Study on the Development of Pavement Crack Recognition Algorithm Using Artificial Neural Network (신경망 학습 기법을 이용한 도로면 크랙 인식 알고리즘 개발에 관한 연구)

  • Yoo Hyun-Seok;Lee Jeong-Ho;Kim Young-suk;Sung Nak-won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.561-564
    • /
    • 2004
  • Crack sealing automation machines' have been continually developed since the early 1990's because of the effectiveness of crack sealing that would be able to improve safety, quality and productivity. It has been considered challenging problem to detect crack network in pavement which includes noise (oil marks, skid marks, previously sealed cracks and inherent noise). It is required to develop crack network mapping and modeling algorithm in order to accurately inject sealant along to the middle of cut crack network. The primary objective of this study is to propose a crack network mapping and modeling algorithm using neural network for improving the accuracy of the algorithm used in the APCS. It is anticipated that the effective use of the proposed algorithms would be able to reduce error rate in image processing for detecting, mapping and modeling crack network as well as improving quality and productivity compared to existing vision algorithms.

  • PDF

The study on mechanical properties of PC panel with steam curing condition (증기양생 조건에 따른 터널 PC 패널의 물리적 특성에 관한 연구)

  • Ma, Sang-Joon;Jang, Pil-Sung;Shiin, Jin-Yong;Nam, Kwan-Woo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.1
    • /
    • pp.17-24
    • /
    • 2008
  • Many problems exist in the current cast in place concrete lining used in domestic tunnel construction. Especially, the crack of tunnel lining brings about a social and economic problem. It has a lot of influence on stability of structure and the fine finish of lining. So enormous repair-work and reinforcement of tunnel lining could occur an running out of government's budget. In our country, there are domestic production enterprises which produce a special pre-cast concrete product, but the technical level of them is still far behind compared to developed countries. Also, optimum steam coring method is important for the production of high quality product. But there is no regulation of steam curing method in our country. This study is to investigate the properties of PC panel according to the variation of steam curing conditions such as presteaming time and rate of temperature rise. The result shows that the optimum presteaming time of steam curing method in PC panel is more than 1 hour and the desirable rate of temperature in curing chamber is about $20^{\circ}C/hr$.

  • PDF

Design for Public Lavatory in Korean Temple Considering the Korean Traditional Architectural Concept (한국 국립공원 사찰 공중화장실 디자인 연구)

  • 온순기;양우창;유상완;박주남;정태운
    • Archives of design research
    • /
    • v.15 no.2
    • /
    • pp.147-156
    • /
    • 2002
  • As our country holds 2002 Korea-Japan FIFA World Cup, more foreigners are visiting Korea, making the tourist industry more profitable. Under these circumstances, we should pay attention to the restroom as a public facility, and inspire the awareness in the Korean people to improve the public restrooms. However, according to KNTO(Korea National Tourist Organization), it has turned out that foreign tourists are still dissatisfied with dirty restrooms and poor signposting when they visit Korea, Though the number of restrooms has been increased, they are not properly managed being a public nuisance due to negligence of administration and straggling facilities. To make it worse, poor design of restrooms and insufficient consideration of handicapped person bring disgrace on Koreas tourist administration. While studies on restrooms began from the 1980s, it has placed too much emphasis on the space arrangement and facility plan, so we need to pay attention to the traditional design and environment aspect of restrooms. This study is 1 haute looked into the problems and actual conditions of restrooms, and based on these data, applied Korean Buddhist architecture style to restrooms to create a comfortable circumstance in restrooms.

  • PDF

The Design and Construction Management of Exposed Concrete Finish Work through the Construction Process Analysis (노출콘크리트 마감공법의 시공 프로세스 분석을 통한 설계 시공관리 방안)

  • Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.160-170
    • /
    • 2005
  • Because designers want to express various elevation, architectural concrete has recently paid attention to finish material and has increasingly used in the construction. architectural concrete needs more careful and professional supervision works such as controling quality of color, texture, construction plan, and design plan. none the less, It is not clear to define process and manage methods for the construction life-cycle, which causes the expense to increase and the quality to be poor. this study will analyze concrete finish method by dividing three parts which are common, exposed and architectural concrete finish method. definition and the limit of application in architectural concrete finish method will be present by comparing three methods. Throughout an interview with a staff in charge and a case study, this paper shows the requirement and the keynote of management which are divided by three steps; the design, construction and maintenance. finally, this research provides management methods of individual steps for effective construction.

Case Studies of a Performance-Based Contract for National Highway Pavement Maintenance (성능보증제도를 적용한 일반국도 유지보수공사 시범사업)

  • Lim, Jaekyu;Kim, Yongjoo;Kim, Myeongil;Lee, Jaejun
    • International Journal of Highway Engineering
    • /
    • v.20 no.1
    • /
    • pp.1-8
    • /
    • 2018
  • PURPOSES : Case studies of an asphalt-overlay project with a performance-based contract method were conducted on a national highway in Korea to evaluate the effect of the method on asphalt pavement maintenance. This study evaluated the procedure of the performance-based contract method. METHODS : In this study, an asphalt-pavement maintenance project for a national highway was assessed with a performance-based contract to investigate the advantage of the new contract procedures. This is the first trial applying the performance-based contract to a pavement-rehabilitation project in Korea. In the four case studies, the warranty period of the performance-based contract was designed for seven years. The research team monitored the construction site to compare the normal contract method with the performance-based contract method. The case studies' project sites were investigated after the end of the construction. RESULTS : Based on the limited case studies, the performance-based contract method could extend the service life of the asphalt pavement and reduce the pavement-maintenance budget because the quality control was well managed by the contractors. However, a few construction laws would be necessary to apply the performance-based contract method in the future. CONCLUSIONS : Using the performance-based contract, the construction company made great efforts to guarantee the warranty period and to apply the optimal maintenance method, based on the pavement distress condition. The contractor and the agency would need to understand the new performance-based contract system for it to be activated. Therefore, a proper education program for the performance-based contract system would be needed to educate the stakeholders regarding the procedures and their effects on the pavement management and maintenance.

Analysis of Binding Media Used in Mural Painting of Temple Wall by Pyrolysis/GC/MS and IR (열분해/GC/MS와 IR을 이용한 사찰 벽화 시편 교착제 분석)

  • Park, Jongseo;Lee, Jeong Won
    • Journal of Conservation Science
    • /
    • v.33 no.5
    • /
    • pp.345-354
    • /
    • 2017
  • A mural was discovered in the Ssanggyesa temple located in Jindo island, during repair of the Daeungjeon Hall. A study was conducted to determine the binding medium used for preparing the mural. Pyrolysis/GC/MS and IR spectrometry were used to analyze a painting specimen. Direct approach and on-line methylation approach were attempted for the pyrolysis/GC/MS. In IR analysis, the spectra of the specimen were found to be different from those of Asian lacquer, yellow lacquer, animal glue, and acrylic emulsion resin. They were also not identical to the standard IR spectra of drying oils such as linseed oil. Pyrolysis/GC/MS results of the specimen were different from those of Asian lacquer, yellow lacquer, animal glue, and acrylic emulsion resin. In the mean time, palmitic acid, octadecanoic acid, nonanedioic acid, and octadecenoic acid, which are characteristic pyrolysis products of dried drying oil, were detected. In addition, the pyrolysis/GC/MS chromatograms of the specimen and dried drying oil were also very similar. Therefore, it was concluded that the painting was prepared using drying oil as a binding medium.

Application of BIM-based PMIS Considering Construction Life-Cycle (건설 생애주기를 고려한 BIM 기반의 PMIS 활용)

  • Moon, Sung-Woo;Kwon, Ki-Nam;Kim, Sang-Do;Jung, Joon-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.654-657
    • /
    • 2008
  • Recently, construction projects have become bigger and complicated and the construction business scale has enlarged. Therefore a project cost size is increasing. The historical data can be easily saved by advanced technologies of IT industries. Utilizing those make us to be able to manage construction project more effectively. These days, PMIS (Project Management Information System) has supplied widely at construction companies for integrating cooperation system of Web environment. and it is being used. However the most PMIS is limited at construction phase. Actually it isn't applied to a construction project Life-Cycle(planning, design, construction and maintenance). To control manage a construction project Life-Cycle effectively, BPMS (BIM-based PMIS Modeling) should be considered. This paper suggests the ways for applying BPMS.

  • PDF

Integrity test and depth estimation of deep foundations (깊은 기초의 건전도시험과 근입깊이 조사)

  • Jo Churl-hyun;Jung Hyun-key;Lee Tai-sup;Kim Hag-soo
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 1999.08a
    • /
    • pp.202-216
    • /
    • 1999
  • The deep foundation is frequently used for the infrastructures. Since the quality control of the cast-in-place concrete foundations such as CIP piles and slurry walls is not so easy as that of the ready made PC(prestressed concrete) piles, it is necessary to get the information on the integrity of the concrete of the foundation. The depth estimation of foundations whose depths are unknown is also very important in repair and reinforcement works or in safety inspection and assessment to the big structures. The cross-hole sonic logging(CSL) system and the single channel reflection seismic measurement system were developed to test the integrity of pile. The former is well applied to CIP structures, while the later to all kinds of piles with less accurate result compared to that of CSL. To estimate the depth of the deep foundations, parallel seismics, borehole RADAR, and borehole magnetics can be used.

  • PDF

Improvement of Physical Condition Assessment in Water Mains (상수도 관로의 물리적 상태평가 기준 개선)

  • Kim, Ju-Hwan;Lee, Doo-Jin;Bae, Cheol-Ho;Ahn, Hyo-Won;Hwang, Jin-Soo;Choi, Doo-Yong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.1710-1715
    • /
    • 2010
  • Service life of water pipes buried in the underground is considerably affected from various factors such as environmental characteristics, pipe characteristics, operation and maintenance, etc. Therefore it is difficult to determine their service life as uniformly the same value assigned by related laws and ordinances. As a result, the service life should be determined by the technical judgement based on the assessment for the condition of water pipes. In this study, It was established that the methodology could predict present and future failure risk, and plan short and long-term strategies for replacement/rehabilitation through the assessment for the physical deterioration and economical values of buried water pipe. The methodology was applied for the verification and reliability to several sites selected in multi-regional transmission pipelines. The proposed method could helps to support reasonable and economical decision of rehabilitation/replacement in the present and future. To improve conventional assessment method of aged water pipes, affecting factors are simplified based on the statistical analysis results from the measured data in the field and the physical deterioration mechanism for better reliability. Also, the guide-line is developed to carry out the reasonal rehabilitation planning through water pipe condition assessment.

  • PDF

Application of Mobile Mapping System for Effective Road Facility Maintenance and Management (효율적인 도로 시설물 유지관리를 위한 모바일 매핑 시스템 활용에 관한 연구)

  • Kim, Moon-Gie;Sung, Jung-Gon
    • Korean Journal of Remote Sensing
    • /
    • v.24 no.2
    • /
    • pp.153-164
    • /
    • 2008
  • According to the economic growth, many highways are constructed for increasing need of better life style. Especially roads and roadside facilities are used for accident prevention and offering mobility for drivers. For these purpose, roads and roadside facilities should be well maintained and managed. Now, many roads and roadside facilities are constructed in many areas. Because of traditional surveying method requires much time and surveying efforts, we designed and developed mobile mapping system for highway maintenance and management purpose using multi sensors. We tested our mobile mapping system and data management process. Using developed database, road managers can easily check the information of facility conditions, positions, and attributes. We are expecting low cost and efficient road maintenance process by using our system.